SourcingAI
Try for free
Powered by Made-in-China.com
Hot Dipped Galvanized Painted Cuplock Scaffolding System for Construction
US$870.00
1-4 Tons
US$700.00
5-9 Tons
US$500.00
10+ Tons

Product profile

Customization

Available

After-sales Service

One Year

Warranty

One Year

Model NO.

Q195 Q235 Q345

Material

Steel

Type

Mobile

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Projecting Scaffolding

Lapping Form

Single Row Scaffolding

Erection Position

Internal Scaffolding

Move Method

Horizontal mobile Scaffolding

Scaffolding Part Type

Scaffolding Props

Construction Properties

Building Scaffold

Surface Treatment

Black, Hot DIP Galvanized, Powder Coated

Color

as Request

Keywords

Cuplock Scaffolding Ledger

Transport Package

Pallet

Specification

length 0.5m-3m

Trademark

Renzhong

Origin

China

Key features

The cuplock scaffolding is efficient in assembly and disassembly, offers high load capacity, ensures stability and safety, and enables convenient construction.
The cuplock scaffold components are prone to damage and loss; strict control over component specifications, proper assembly, and reinforcement is essential.
The cuplock scaffolding has a large bearing capacity and high rigidity. It can be erected quickly and has strong overall stability.
Suspended scaffolding for road, bridge, building and civil engineering construction, aiming to enhance efficiency, reduce costs and ensure work safety
Compared with traditional scaffolding, cuplock scaffolding is faster to assemble and disassemble, and has better overall rigidity and safety.
The cuplock scaffolding joints are self-locking and stable, facilitating quick assembly and disassembly, and have strong versatility and high safety and reliability.

Company profile

Business Type: Trading CompanyExport Year: 2019-08-30Nearest Port: Shanghai Port, Tianjin PortAverage Response Time: ≤5.19hTerms of Payment: T/T, LC, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA

About Our Factory & Business Background

AddressWuxi, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsStainless Steel Tube, Stainless Steel Sheet, Scaffolding, Stainless Steel Coil, Scaffolding Pipe, Stainless Steel Pipe, Stainless Steel Plate, Scaffolding Coupler, 304 Stainless Steel Sheet, 304 Stainless Steel Plate

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:How can we trust your company?
A:
We specialize in steel business for many years,you are welcome to investigate in any way,anyway,you can place an order on Made-in-China,with trade assurance,which can ensure your payment.
Q:How do you guarantee the quality?
A:
1.We have passed ISO9001,SGS,CE and other certifications; 2.Always have pre-production samples before mass production,and always do finalinspection before shipment; 3. Acceptable third-party inspection.
Q:About the product price?
A:
Due to the cyclical changes in raw material prices, prices vary from period to period. You can consult us, you can communicate with us online through the platform, WeChat, WhatsApp and other platforms, and we will reply within 24 hours. Please give us your requirements and specifications (steel grade, size, quantity, destination port), and we will work out the best price at the first time.
Q:Can I visit your factory?
A:
Of course, we welcome customers from all over the world to visit our factory. However, some factories are not open to the public.
Q:Can you send samples?
A:
Of course,we can send samples to all over the world,our samples are free,but customers need to bear the express cost.

Send Inquiry

*To:Jiangsu Renzhong Metal Products Co., Ltd.Jiangsu Renzhong Metal Products Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like