Powered by Made-in-China.com
Perforated Steel Scaffold Plank for Building Scaffolding System
US$48.00
30-49 Sets
US$45.00
50+ Sets
Product profile
Customization
AvailableAfter-sales Service
1 YearWarranty
1 YearModel NO.
Q195 Q235 Q345Material
SteelType
MobileStructural Style
Tower ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Single Row ScaffoldingErection Position
Internal ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Building ScaffoldMOQ
30 SetsFeature
Sturdy Structure Resistant to DeformationCustomization Available
YesAdvantages
Strong Load-Bearing Capacity and Wide AdaptabilityTransport Package
Anti-Rust Paper and Waterproof FilmSpecification
CustomizedTrademark
RenzhongOrigin
ChinaProduction Capacity
2000 Tons/MonthKey features
Strong Load-bearing Capacity: Features sturdy structure with high load-bearing capacity and resistance to deformation.
Customized Structural Design: Offers customizable type, structural style, framework, supporting mode, and erection position.
Standardized Modular System: Designed for easy assembly, disassembly, and transport with reusable components.
High Safety Features: Equipped with anti-slip steps and protective components for secure high-altitude work.
Wide Adaptability: Suitable for construction, exterior decoration, road/bridge projects, and municipal engineering.
Comprehensive Warranty: Includes 1-year warranty and 1-year after-sales service coverage.
Premium Material Quality: Constructed from high-quality steel ensuring stability and durability.
Secure Packaging Solution: Uses anti-rust paper, waterproof film, and ISPM 15 treated wooden pallets for protection.
Company profile
Business Type: Trading CompanyExport Year: 2019-08-30Nearest Port: Shanghai Port, Tianjin PortAverage Response Time: ≤4.90hTerms of Payment: T/T, LC, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA
About Our Factory & Business Background
AddressWuxi, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsStainless Steel Tube, Stainless Steel Sheet, Scaffolding, Stainless Steel Coil, Scaffolding Pipe, Stainless Steel Pipe, Stainless Steel Plate, Scaffolding Coupler, 304 Stainless Steel Sheet, 304 Stainless Steel Plate
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:How can we trust your company?
A:
We specialize in steel business for many years, you are welcome to investigate in any way, anyway, you can place an order on Made-in-China, with trade assurance, which can ensure your payment.
Q:How do you guarantee the quality?
A:
1.We have passed ISO9001, SGS, CE and other certifications; 2.Always have pre-production samples before mass production,and always do finalinspection before shipment; 3. Acceptable third-party inspection.
Q:About the product price?
A:
Due to the cyclical changes in raw material prices, prices vary from period to period. You can consult us, you can communicate with us online through the platform, WeChat, WhatsApp and other platforms, and we will reply within 24 hours. Please give us your requirements and specifications (steel grade, size, quantity, destination port), and we will work out the best price at the first time.
Q:Can I visit your factory?
A:
Of course, we welcome customers from all over the world to visit our factory. However, some factories are not open to the public.
Q:Can you send samples?
A:
Of course, we can send samples to all over the world, our samples are free, but customers need to bear the express cost.
Send Inquiry
*To:
Jiangsu Renzhong Metal Products Co., Ltd.
Jiangsu Renzhong Metal Products Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
BS En12811-1 Q195/Q235/Q355 Steel Scaffold Scaffolding System Decking Walkboard Pedal Plank
US$40.00-48.00
30 Sets(MOQ)
Building Material Tubular Ringlock Scaffolding System Layher Scaffolding Steel Scaffold Plank
US$5.00-15.00
100 Pieces(MOQ)
Kwikstage Scaffolding Ringlock Scaffold System Steel Perforated Plank with Top Quality
US$4.00-12.00
100 Pieces(MOQ)
Galvanized Scaffold Steel Plank for Frame, Perforated Catwalk Panel
US$650.00-750.00
25 TONS(MOQ)
Steel Plank for Scaffolding System Layher Allround Building Construction
US$4.00-12.00
100 Pieces(MOQ)
1.5m 320mm Safety Ringlock Metal Scaffolding System Perforated Steel Plank with Different Hooks
US$3.00-30.00
100 Pieces(MOQ)
AS/NZS 1576.3: 2015 Perforated Ringlock Scaffold Galvanized Steel Plank
US$1,100.00-1,200.00
20 Tons(MOQ)
Sasp Euro En12811-1 Osha Steel Scaffold Scaffolding System Decking Walkboard Pedal Plank
US$600.00-650.00
28 Tons(MOQ)
Building Material Pre -Galvanized Steel Working Platform Plank Metal Plank for Scaffolding System
US$5.00-25.00
100 Pieces(MOQ)
Painted Cuplock Scaffolding Material HDG Steel Catwalk Scaffold Plank Ringlock Scaffold Steel Frame System
US$2.00-20.00
100 Pieces(MOQ)
Galvanized Scaffolding Perforated Catwalk Steel Plank for Scaffolding Systems
US$9.00-15.00
1 Ton(MOQ)
Metal Decking Scaffold Walking Board Platform Steel Plank for Scaffolding System
US$45.00-48.00
30 Sets(MOQ)
Galvanized Scaffolding Building Bridge Steel Decking Walk Board Plank for Building
US$2.00-10.00
100 Pieces(MOQ)
Layer System Steel Pre Galvanized C 320mm Width Metal Scaffold Plank for Scaffoldings
US$1.99-40.00
1 Piece(MOQ)
Aluminum Staging Planks 320mm Wide Anti-Slip for Building Construction
US$4.50-8.50
100 Pieces(MOQ)
Cheap Construction Materials Steel Scaffolding Plank for Building
US$4.50-8.50
1,000 Pieces(MOQ)



















