SourcingAI
Try for free
Powered by Made-in-China.com
Intelligent Control Automatic 3-in-1 Bottle Filling Machine for Cola & Sprite Filling
US$40,000.00-102,800.00
1 Piece

Product specifications

Specification

Product profile

Customization

Available

Type

Piston Filling Machine

Automatic Grade

Automatic

Model NO.

JR18-18-6D JR24-24-8D JR32-32-10D JR40-40-10D

Material Type

Liquid

Filling Valve Head

Multi-Head

Feed Cylinder Structure

Multi-Room Feeding

Dosing Device

Rotor

Filling Principle

Pressure

Packaging Container Lifting Structure

Pneumatic Lifting

Structure

Rotary

Packaging

Bottle

Packaging Material

Plastic

Product Name

3-in-1 Machinery for Carbonated Beverage

Keywords

Filling Machine

Material

304 Food-Grade Stainless Steel

Feature

High Speed, Automatic, Durable

Application

Filling Machine

OEM Custom

Yes

ODM Custom

Yes

Volume

200-2000ml

Power

4kw

Weight

7000kg

Transport Package

Iron Tray, Wooden Box

Specification

3100*2250*2800mm

Trademark

JINRONG

Origin

Jiangsu, China

Production Capacity

5000/Year

Key features

3-in-1 Integrated Design: Combines washing, filling, and capping into one compact unit to save space and boost efficiency.
High-Speed Automatic Operation: Engineered for continuous, high-throughput production with minimal downtime for carbonated drinks.
Food-Grade Construction: Built with 304 stainless steel and aviation-grade aluminum for durability and hygiene compliance.
Intelligent Control System: Features advanced PLC control for precise operation, real-time monitoring, and user-friendly management.
Flexible Customization: Fully customizable for various bottle sizes, output capacities, and seamless system integration.
Exceptional Durability: Heavy-duty components guarantee reliable performance over years of continuous industrial use.
Energy Efficient: Adopts frequency conversion and heat recovery technology, reducing energy consumption by 15%-30%.
Global Export Experience: Exported to over 50 countries with support for remote diagnostics and on-site repairs.

Company profile

CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2000-11-01 CertifiedNearest Port: ShanghaiAverage Response Time: ≤7.46h CertifiedTerms of Payment: LC, T/T

About Our Factory & Business Background

AddressWukesong Road, Sanxing, Jinfeng Town, Zhangjiagang City, Suzhou, Jiangsu, China
Plant Area47898.8 square meters
Number of Employees220
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsBeverage Machine, Filling Machine, Beverage Filling Machine, Drinking Machine, Liquid Machine.
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2000-06-23
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia, Domestic
Number of Foreign Trading Staff22
Overseas Agent/BranchNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2008
Product CertificationCE, Others

Product Q&A

Q:What types of beverage machinery do you mainly produce?
A:
We provide complete beverage production line equipment, including water treatment systems, mixing tanks, sterilizers (UHT/pasteurization), filling machines (aseptic/room temperature), blow molding machines, labeling machines, packaging machines, etc., suitable for water, juice, tea beverages, carbonated beverages, dairy products, etc.
Q:Can the equipment be adapted to different packaging types?
A:
Yes, our filling machines and packaging lines can be modularly designed to accommodate various containers. Different machines are adapted to different packaging types, and we provide technical guidance.
Q:How automated is the production line? Does it require a lot of manual operation?
A:
Our equipment can achieve fully automated production. From raw material processing to finished product packaging, everything is centrally controlled by the PLC/industrial control computer. Each line only requires 1-3 inspection personnel, significantly reducing labor costs.
Q:How much investment is needed for a complete beverage production line?
A:
The investment amount depends on capacity, automation level, and process complexity. A small line (3000-6000 bottles/hour) costs approximately 700,000-1,500,000 RMB, while a medium-sized line (6000 bottles/hour and above) costs approximately 2,000,000 RMB and above. We will provide customized solutions and quotations based on your needs.
Q:How long does it take from order placement to equipment delivery?
A:
The delivery time for standard models is approximately 60-90 days, while customized production lines require 90-120 days. The specific time depends on the configuration complexity and order schedule.

Send Inquiry

*To:Jiangsu Jinrong Machinery Co., Ltd.Jiangsu Jinrong Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like