Powered by Made-in-China.com

1.8 Degree 2 Phase NEMA11 28mm Stepper Motor Step Motor Long Lead Screw Shaft with Encoder for 3D Printer
US$10.00-30.00
1 Piece
Sample price:US$30.00/piece.Request sample
Product profile
Customization
AvailableApplication
Printing EquipmentSpeed
Low SpeedModel NO.
JK28HS32-1004L2BED-7Number of Stator
Two-PhaseExcitation Mode
HB-HybridFunction
ControlNumber of Poles
2Operate Mode
Three Phase Double BeatType
ElectromechanicalCertification
ISO9001, CE and RoHSStep Angel
1.8degreeMotor Length
32mmCurrent
1.0AMotor Weight
0.5kgHolding Torque
650g.CmTransport Package
Export CartonSpecification
CE/ROHS/ISO9001Trademark
JKOrigin
ChinaHS Code
8501109990Production Capacity
200, 000PCS/MonthCompany profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 13 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤4.25h
AI-Powered supplier vetting
SummaryThe supplier is identified as a combined company with manufacturing, service, quality-control, R&D, and export-trade capabilities. It reports ISO9001:2015, ISO14001, and CE certification, seven quality-control personnel, seven R&D engineers, multiple customization options, ODM capability, and OEM service for well-known brands. However, its quality-control test-equipment count is stated as zero, finished-product inspections lack written records, and warehouse procedures lack supporting records. After-sales complaint handling and corrective/preventive-action processes have no written procedures or records. The supplier reports no overseas warehouse, showroom, agent, branch, or offline trade-show participation, and no new products in the past year. Financial information is limited to year labels rather than substantive financial results, so credibility cannot be fully assessed.
Supplier typeThe supplier is classified as a combined company and presents offerings across manufacturing, export trade, service, quality control, R&D, and sustainability. This indicates a broad stated operating scope, but the slice does not provide further legal or ownership detail.
CertificationsThe supplier reports ISO9001:2015 and ISO14001 certifications for its sustainable-development management system and CE certification capability for products. These are explicit certification-related credentials, although the slices do not provide certificate validity periods or scopes.
After-Sales capabilityThe supplier lists debugging, maintenance, repair, training, and equipment installation services, with lead times stated as within 15 workdays in both peak and off-season. However, it has no written procedures or records for customer complaint handling or corrective and preventive actions, and it reports no overseas warehouse, showroom, agent, or branch.
R&D capabilityThe supplier reports seven R&D engineers responsible for customer-request confirmation, new-product design, and technical support, and offers ODM services and multiple design customization modes. Against this, it states that no new products were developed in the past year and no SDK is available, indicating limited recent product innovation evidence.
Production capacityThe supplier lists manufacturing equipment and an assembly line, has seven quality-control inspectors, and reports lead times within 15 workdays in both peak and off-season. Nevertheless, its quality-control test-equipment count is stated as zero, finished-product inspections have instructions but no written records, and warehouse procedures lack relevant records.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, and flexible customization. These capabilities are stated consistently for both design services and R&D services, providing clear evidence of broad customization support.
Client casesThe supplier states that it provides OEM services for well-known brands, which is an explicit customer-experience indicator. However, no brand names, project details, product examples, or verifiable case descriptions are provided, so the depth of its customer-case evidence is limited.
Send Inquiry
*To:
CHANGZHOU JKONGMOTOR CO., LTD.
CHANGZHOU JKONGMOTOR CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
NEMA 17 Leaded Screw Linear Motor Cheap Ball Screw Stepper Motor
US$13.00-15.00
1 pieces(MOQ)
China Low Price 57ebp105alc+Hbs57 2phase NEMA23 Closed Loop Stepper Motor with High Quality Driver Kit 2.5nm
US$62.00-65.00
1 pieces(MOQ)
High Torque NEMA17 NEMA23 NEMA34 42mm-86mm Flange Size Stepper Motor
US$3.90-36.00
1 Piece(MOQ)
Manufacturer Hybrid 60X60X67mm NEMA 24 Stepper Motor Kit and Driver
US$6.21-15.80
500 Pieces(MOQ)
High Torque 57mm NEMA 23 Two Phase Hybrid Stepper Motor
US$10.00
1 Piece(MOQ)
2 Phase 1.8 Degree Hybrid Bipolar NEMA 17 Stepper Motor for 3D Printer and CNC Machine
US$4.78-10.00
2 Pieces(MOQ)
86mm 1.8 Degree Customized Hybrid Stepper Motor (MP086NA101)
US$19.00-70.00
1 Piece(MOQ)
Hollow Shaft Stepper Motors 35stc -H Size 35 mm NEMA 14
US$5.50-50.00
100 Pieces(MOQ)
24VDC NEMA23 SANYO Denki Hybrid Stepper Motor 103h7123/5640
US$38.00-45.00
30 Pieces(MOQ)
Manufacturer Customization 1: 64 Reduction Ratio DC 5V/12V/24V Mini Stepper Motor 28byj
US$0.80-1.50
500 Pieces(MOQ)
NEMA 52 130mm 50n. M Big Torque Stepper Motor/Step/Stepping Motor
US$90.00-220.00
1 Piece(MOQ)
High-Torque 86ebp147alc-Tk0 2-Phase Closed Loop Stepper Motor Kit
US$58.00-68.00
1 pieces(MOQ)
Closed Loop Servo Stepper Motor with Motion Controller
US$25.00-35.81
1 Piece(MOQ)
High-Quality 3V 5V 2-Phase Hybrid Stepper Motor 42*42*60mm with Brake 24V for ATM
US$14.29-18.91
500 Pieces(MOQ)
NEMA High Torque Driving DC Stepper Motors
US$35.00-48.39
1 Piece(MOQ)



















