Powered by Made-in-China.com
Construction Galvanized Scaffolding Boards Walking Platform Metal Deck Steel Plank for Building
US$2.00-10.00
100 Pieces
Sample price:US$10.00/piece.Request sample
Product profile
Customization
AvailableMaterial
MetalType
FixedModel NO.
JS Steel PlanksStructural Style
Soffit ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Full ScaffoldingErection Position
External ScaffoldingMove Method
Integral Lifting ScaffoldingScaffolding Part Type
Scaffolding PlanksConstruction Properties
Building ScaffoldModel Number
Walk PlankSurface Treatment
GalvanizedColor
SilverThickness
1.5mm-4mmHigh
50mmWidth
250mmLength
0.5-5mTransport Package
Wooden TraySpecification
2m/3m/4mTrademark
JoysunOrigin
Hebei ChinaHS Code
73144900Production Capacity
5000 Piece Per DayKey features
Comprehensive Customization: Tailored dimensions, surface treatments, and designs available with dedicated drawing services.
Superior Durability: Triple the durability of LVL boards with robust Q195/Q235 steel construction.
Enhanced Safety Features: Anti-slip perforations and slip-resistant design ensure worker safety on decks.
Corrosion Resistance: Hot-dip or pre-galvanized surface treatments offer exceptional resistance to corrosion.
Lightweight Design: Boasts a 20% weight reduction compared to traditional LVL scaffold boards.
Fire Retardant Material: Non-combustible steel construction ensures safety in high-risk environments.
BS-EN12811 Compliance: Tested and compliant with BS-EN12811 standards including Load Class 6.
Versatile Applications: Ideal for Oil and Gas industries and suitable for hot climates like the Middle East.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2022-10-01 CertifiedNearest Port: Tianjin PortAverage Response Time: ≤3.26h CertifiedTerms of Payment: LC, T/T, PayPal, etc.
About Our Factory & Business Background
AddressNo. 9 Jing7 Road, Economic Development Zone, Anping County, Hengshui, Hebei, China
Plant Area2000 square meters
Number of Employees20
Registered Capital1,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsPerforated Metal Sheet/Stainless Steel Wire Mesh/Drop Safe Cable Net/Wire Rope Net/Walkway Sheet/Expanded Metal Sheet/Welded Wire Mesh
Production MachinesPunching Facility, Roll Forming Facility, Punching Facility
R&D Engineers2 people
Our Industry Experience & Global Business Record
Year of Establishment2023-03-14
Main MarketsNorth America, South America, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
Product Q&A
Q:What customization options are available for the scaffolding boards?
A:
We offer unlimited customization including tailored widths (210-500mm), heights (40-76mm), lengths (500-4000mm), and wall thicknesses (1.0-2.0mm). We also provide drawing services and craft new products based on your specific designs.
Q:What materials are used to construct these scaffolding decks?
A:
Our decks are constructed from high-strength Q195 and Q235 steel materials, ensuring robustness and resilience for heavy-duty performance.
Q:How does the surface treatment affect the product's lifespan?
A:
The boards undergo galvanization (pre-galvanized or hot-dip) to offer enhanced durability and effortless resistance against corrosion.
Q:Are these scaffolding boards compliant with international safety standards?
A:
Yes, our products are tested and compliant with BS-EN12811 standards, featuring Load Class 6 for sturdily engineered heavy-duty performance.
Q:What are the lead times for production?
A:
The average lead time is within 15 workdays for both peak season and off-season production.
Send Inquiry
*To:
Anping Joysun Wire Mesh Product Company Limited
Anping Joysun Wire Mesh Product Company Limited*Content:
Supplier replies will be sent to your registered email
You may also like
Steel Walk Board Metal Scaffolding Platform Boards Scaffold Planks
US$45.00-48.00
30 Sets(MOQ)
Glavanized Construction Metal Walk Board Plank with O Hook for Multidirectional Scaffolding
US$10.00-35.00
100 Pieces(MOQ)
Construction Scaffold Boards Walking Platform Metal Deck Steel Plank for Scaffolding System
US$4.00-12.00
100 Pieces(MOQ)
China Steel Scaffolding Exporter 210 250 300 320mm Galvanized Scaffold Steel Plank for Construction
US$2.00-10.00
100 Pieces(MOQ)
Catwalk Plate Scaffold Walk Boards Steel Plank with Hooks Building Scaffolding Used for Construction
US$1,000.00-1,200.00
30 Tons(MOQ)
Hot DIP Galvanized Steel Walking Board/Decks/Plank with O Hooks for Ringlock Scaffolding Formwork Construction
US$7.00-30.00
100 Pieces(MOQ)
Factory Direct Supplier Metal Walk Board Construction Scaffolding Platform 225mm 320mm Steel Plank with Hook
US$1,000.00-1,200.00
5 Tons(MOQ)
Modern Design Galvanized Construction Steel Plank 1-4m Walk Board Plank for Scaffolding
US$45.00-48.00
30 Sets(MOQ)
Galvanized Metal Layher Scaffold Deck / Planks for Steel Ringlock Scaffolding
US$3.00-20.00
100 Pieces(MOQ)
Heavy-Duty Metal Deck Scaffolding Plank for Safe Work Platforms
US$1,050.00-1,100.00
20 Tons(MOQ)
Metal Scaffold Steel Plank Manufacturer Q235 Construction Metal Plank Board with Hooks
US$6.00-7.90
500 Pieces(MOQ)
BS En12811 Steel Walk Board Metal Scaffolding Platform Boards Scaffold Planks
US$500.00-1,860.00
1 Ton(MOQ)
China Factory Scaffold Walking Platform Metal Deck Walking Scaffolding Board Planks
US$7.90
100 Pieces(MOQ)
Galvanized Construction Materials Steel Scaffolding Steel Plank for Building
US$2.00-10.00
100 Pieces(MOQ)



















