SourcingAI
Try for free
Powered by Made-in-China.com
Glass Encapsulated Ntc Thermistor Sensor with Long Lead Wire
US$0.20-3.00
1,000 Pieces

Product profile

Customization

Available

Resistance

Sensitive Resistor

Function for Resistance

Protective Resistor

Model NO.

MF59

Installation

Duct Type

Material

Glass-Sealed

Packaging

Package

Type

Thermal Resistor

Quantity

Duplex

Shape

Diode Type

Resistance change scale

Linear Scale

Application

Household Appliance

Brand

Jingpu Sensor

Production Process

Glass Encapsulated

Measuring Medium

Temperature

Company

Jingpu Sensor

Resistance Value

Custom

Transport Package

Neutral Packing

Trademark

J. P. Sensor

Origin

Hefei, Anhui

Production Capacity

500, 000PCS/Year

Key features

Custom Resistance Value: Resistance value can be customized to meet specific application requirements.
High Stability and Reliability: ROHS compliant with solid glass structure for harsh environments.
Versatile Material Options: Cable materials include PVC, PTFE, and Silicon latex Fiberglass.
Fast Response Time: High sensitivity and rapid respond time for precise temperature control.
Compact and Lightweight: Small size suitable for automatic plug-in installation and mass production.
Flexible Lead Time: Off-season lead time within 15 workdays; peak season one month.
Multiple Payment Terms: Supports LC, T/T, and Western Union for convenient transactions.

Company profile

Hefei Jingpu Sensor Technology Co., Ltd.
Importers and ExportersPatents AwardedIn-stock CapacityFast Delivery
Business Type: Manufacturer/FactoryExport Year: 2019-04-17Nearest Port: ShanghaiAverage Response Time: ≤4.00hTerms of Payment: LC, T/T, Western UnionInternational Commercial Terms(Incoterms): FOB, EXW, CFR, DAP, FCA

AI-Powered supplier vetting

SummaryThe supplier is a combined company with activities covering electronic and electromechanical equipment, electronic components, instruments, software, system services, and technical services. It provides full customization, ODM, and OEM services for recognized brands, and reports three production lines, 6–10 quality-control staff, and stated NTC thermistor and temperature-sensor output. Quality procedures include finished-product inspection instructions, quality assurance, corrective and preventive actions, and complaint-handling records. However, it reports no new products in the past year, no SDK, no overseas warehouse, overseas agents or branches, showroom, or offline trade-show participation. Manufacturing capacity also lacks a valid contract with related subcontractors. Financial-period records are present, but their quality or performance cannot be assessed from the provided data.
Supplier typeThe supplier is identified as a combined company. Its stated business scope spans electronic and electromechanical equipment, electronic components, instruments and meters, software development and sales, computer system services, and technical services, indicating a diversified technology-oriented supplier profile.
CertificationsThe supplier reports one national science and technology progress award and quality assurance in its quality-control processes. However, no specific certification names or certification details are provided, so formal certification coverage cannot be fully verified.
After-Sales capabilityThe supplier has a documented and followed procedure for handling customer complaints and offers quotation terms including FOB, CIF, CFR, and EXW. Conversely, it has no overseas warehouse, overseas showroom, overseas agents or branches, and reports zero countries with overseas services, limiting documented overseas after-sales infrastructure.
R&D capabilityThe supplier provides ODM services and has R&D engineers with 6–10 years of total experience, supporting established development capability. However, it reports no new products in the past year and no available SDK, which are explicit limitations in recent product innovation and development-tool support.
Production capacityThe supplier reports three production lines, stated output of 15,000,000 NTC thermistors and 1,500,000 NTC temperature sensors, in-stock capability, and standardized finished-product inspection instructions. A material manufacturing-control weakness is that no valid contract exists between the factory and related subcontractors.
Customization capabilityThe supplier explicitly offers customization from designs and full customization, and also provides ODM services. These statements directly support the ability to develop or manufacture customized products according to customer requirements.
Client casesThe supplier states that it provides OEM services for recognized brands and has exported goods for seven years, with exports representing 21%–30% of total sales. These are relevant customer and market-experience indicators, although no customer names, product cases, or independently verifiable project details are provided.

Product Q&A

Q:What cable materials are available?
A:
We offer PVC, PTFE, and Silicon latex Fiberglass as cable material options.
Q:Is the resistance value customizable?
A:
Yes, the resistance value can be customized to suit your specific application needs.
Q:What is the accuracy tolerance?
A:
The accuracy tolerance ranges from 0.5% to 5%.
Q:What are the typical applications for this sensor?
A:
It is widely used in rice cookers, electronic ovens, disinfectors, water fountains, dishwashers, and mobile battery chargers.
Q:What are the payment terms?
A:
We accept LC, T/T, and Western Union as terms of payment.

Send Inquiry

*To:Hefei Jingpu Sensor Technology Co., Ltd.Hefei Jingpu Sensor Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Ntc Temperature Sensor Thermometer Resistance
Made-in-China.com
Current Sensor with 100A/100mv

Current Sensor with 100A/100mv

US$4.80-5.90
200 Pieces(MOQ)
Made-in-China.com
Z Contelec D2310 5K0 5A 127MB Industrial Control Sensor
Made-in-China.com
Fuel Level Sensor Tfr

Fuel Level Sensor Tfr

US$0.50-0.60
1,000 Pieces(MOQ)
Made-in-China.com