Powered by Made-in-China.com

Screw Pump Long-Lead Series Applied to Low-Pressure Large-Flow
US$500.00-50,000.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
Help CheckWarranty
1 YearModel NO.
ZAGMax.Head
136mMax.Capacity
1600m3/HDriving Type
MotorImpeller Number
Single-Stage PumpWorking Pressure
Low Pressure PumpInfluent Type of Impeller
Double-Suction PumpPosition of Pump Shaft
Vertical PumpPump Casing Combined
Verticaljoint Surface PumpMounting Height
Since Irrigation Centrifugal PumpsImpeller
ClosedUsage
Pump, Pumps, Condensate Pump, Slurry Pump, Circulating PumpStandard
API610 / Vdma24297Package
Plywood BoxMotor Power
0.5~280kwFlow Range
2.8~1600m3/HLift Range
2.5~136mTransport Package
Plywood BoxTrademark
kqOrigin
Jiangsu, ChinaHS Code
8413709990Production Capacity
20000 PCS/YearCompany profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.94h CertifiedTerms of Payment: T/T
AI-Powered supplier vetting
SummaryThe supplier demonstrates documented R&D, customization, quality-control, service, and management processes. It has six R&D engineers, three production lines, 11–20 quality-control staff, recent product development, and certifications including ISO 9001:2015, ISO 14001, and ISO 45001:2018. It can provide customization from samples or designs and full, minor, or flexible customization. However, it does not offer ODM services, has no overseas warehouse, showroom, agent, or branch, and reports no available SDK. Production oversight has a stated weakness because ongoing quantity reconciliation is not performed for every batch or volume production. Export experience is reported as one year, with domestic markets identified as primary. Financial records are indicated for recent years, but the provided data does not establish financial strength or credibility.
Supplier typeThe supplier operates manufacturing capacity with three production lines and provides customization and export services, while domestic markets are identified as primary. The available information supports classifying it as a manufacturer with customization capability, but does not identify a more specific legal or business type.
CertificationsThe supplier reports ISO 45001:2018, ISO 9001:2015, and ISO 14001 certifications. These explicitly demonstrate certifications covering occupational health and safety, quality management, and environmental management.
After-Sales capabilityR&D engineers are responsible for technical support during production and after-sales service, and the supplier has documented complaint-handling and corrective/preventive-action procedures with records. It also reports participation in an offline industry exhibition, but no overseas service countries and no overseas agents or branches are identified.
R&D capabilityThe supplier reports new products during the past year, six R&D engineers, technical and new-product-development responsibilities, and auditable design input, output, review, verification, and validation documents. However, no SDK is available and ODM service is not offered; these limitations do not negate the documented internal R&D activity.
Production capacityThe supplier reports three production lines, 11–20 quality-control staff, one quality-control test-equipment quantity entry, and peak-season order fulfillment of two to three months. A stated deficiency is that the factory does not conduct ongoing quantity reconciliation for every batch or volume production, indicating a production-control weakness despite established manufacturing capacity.
Customization capabilityThe supplier explicitly provides customization from samples, customization from designs, full customization, minor customization, and flexible customization. These repeated entries establish broad customization coverage, although ODM service is specifically unavailable.
Send Inquiry
*To:
Taizhou Kangqiao Electromechanical Equipment Co., Ltd.
Taizhou Kangqiao Electromechanical Equipment Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Food Sanitation Pump Low Speed Large Flow Big Head and Long Suction Distance
US$500.00-50,000.00
1 Piece(MOQ)
Hw Series Large Capacity Low Pressure Horizontal Mixed Flow Water Pump
US$290.00-300.00
1 Set(MOQ)
High Performance Large Flow Low Head Stainless Steel Magnetic Drive Pump for -20 ~ 150 Degree Chemical Medium
US$500.00-8,000.00
1 Piece(MOQ)
Large Flow Low Pressure Mixed Flow Pump
US$1,200.00
1 Piece(MOQ)
Hfm5bm 1.1kw 1.5HP 2inch Hfm Series Copper Motor Centrifugal Pump Large Flow Low Noise Clean Water Pump
US$54.00-56.00
100 Pieces(MOQ)
High Pressure Large Flow Centrifugal Gravel Sand Dredging Pump Sg Series
US$8,000.00
1 Piece(MOQ)
China High Pressure Large Flow Centrifugal Gravel Sand Dredging Pump Sg Series
US$8,000.00
1 Piece(MOQ)
Long Service Life Marine Large Flow Non-Clogging Submersible Pump
US$300.00
1 Piece(MOQ)
Long Warranty Pwz Series Large Tank Automatic Self-Priming Pump, Stable and Powerful
US$27.00-98.00
50 Pieces(MOQ)
High Pressure Large Flow Centrifugal Gravel Sand Dredging Pump Sg Series China
US$8,000.00
1 Piece(MOQ)
Large Flowrate Submersible Axial Flow Pump Low Pressure Submersible Axial Flow Pump
US$3,869.00-3,889.00
1 Piece(MOQ)
High Pressure Large Flow Centrifugal Gravel Sand Dredging Pump Sg Series
US$180,000.00-190,000.00
1 Piece(MOQ)



















