SourcingAI
Try for free
Powered by Made-in-China.com
Durable Steel Building Materials for Green Energy Factories
US$20.00-45.00
100 Square Meters

Product profile

Customization

Available

Feature

Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable

Install

Support Installation

Component

Steel Column, Beam Purlin, Bracing etc.

Surface Treament

Hot DIP Galvanized or Painting

Standard

GB/ASTM..

Certification

CE&Aisc

Shipping

Standard Seaworthy Packing

Installation

Crane and Other Tools

Kind

Factory, Warehouse...

Trademark

MINWELL

Origin

China

Key features

High Construction Efficiency: Prefabrication and assembly are 30%-50% faster than concrete; 300m2 factory built by 5 workers in 30 days.
Flexible Large-Span Design: Spans over 30 meters with fewer load-bearing walls, allowing free space division and high utilization.
Superior Safety Performance: Withstands seismic intensity 8+, hurricanes up to 70m/s, and offers anti-corrosion for 50+ year lifespan.
Energy-Efficient and Recyclable: 100% recycled steel materials; energy-saving walls improve heat and sound performance by 50%.
Customized Color Options: Color is fully customizable to meet specific project aesthetic and branding requirements.
Comprehensive Certifications: Products certified by CE, AISC, EN1090, and GOST for international quality and safety standards.
Versatile Surface Treatment: Available with Hot DIP Galvanized or Painting options for enhanced durability and corrosion resistance.
Long Design Life: Engineered for a design life of 50 years with minimal maintenance due to moisture and corrosion resistance.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2025-09-20Nearest Port: LIANYUNGANG, QINDGAOAverage Response Time: ≤5.18hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, DDP, DAP, CFR

About Our Factory & Business Background

AddressShop of Wuyue Huafu Phase I, Siyang County, Suqian, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Structure Factory, Steel Structure Bridge, Steel Structure Stadium

Our Industry Experience & Global Business Record

Main MarketsSouth America, North America, Mid East

Product Q&A

Q:How do you ensure product quality?
A:
We follow strict quality control procedures throughout the entire production process. Regular inspections are conducted to make sure every product meets our internal standards and client expectations.
Q:What is your normal production lead time?
A:
Production lead time depends on order quantity and project complexity. We will provide a clear timeline after confirming your specific requirements and production schedule.
Q:Do you provide installation support?
A:
We can provide installation guidance and detailed assembly drawings. For larger projects, onsite support may be arranged based on your needs and project location.
Q:How are your products packaged for delivery?
A:
Products are properly packaged to prevent damage during transit. Different packaging methods are used depending on product size, weight, and shipping distance.
Q:Do you offer after sales support?
A:
Yes, we provide after sales support to address any questions or concerns after delivery. Our team is available to assist with product related issues as needed.

Send Inquiry

*To:Jiangsu Minwell Steel Structure Co., LtdJiangsu Minwell Steel Structure Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Durable Steel Building Materials for Efficient Project Execution
Made-in-China.com
Steel Frame Warehouse Lowcost & Durable Building Material
Made-in-China.com
Cost Effective Building Material for Steel Warehouse Construction
Made-in-China.com