SourcingAI
Try for free
Powered by Made-in-China.com
Innovative Steel Stadium Structures for Modern Sports Facilities
US$500.00-800.00
100 Square Feet

Product profile

Customization

Available

Feature

Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable

Install

Support Installation

Trademark

MINWELL

Origin

China

Key features

Large-Span Capability: High-strength steel enables spans up to 350 meters for open stadium spaces.
Earthquake & Wind Resistance: Withstands extreme weather including strong winds and seismic activity.
Fast Construction Speed: Pre-fabricated components allow rapid on-site assembly and shortened timelines.
Customizable Design: Diverse shapes and spatial forms adaptable to complex architectural requirements.
Long Service Life: Designed for 50 years with anti-corrosion treatment preventing rust and decay.
Eco-Friendly & Recyclable: High recycling rate reduces waste and improves building energy efficiency.
Versatile Usage: Flexible layout suitable for sports, concerts, exhibitions, and workshops.
Global Certifications: Certified by CE, AISC, EN1090, and GOST standards for quality assurance.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2025-09-20Nearest Port: LIANYUNGANG, QINDGAOAverage Response Time: ≤5.82hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, DDP, DAP, CFR

About Our Factory & Business Background

AddressShop of Wuyue Huafu Phase I, Siyang County, Suqian, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Structure Factory, Steel Structure Bridge, Steel Structure Stadium

Our Industry Experience & Global Business Record

Main MarketsSouth America, North America, Mid East

Product Q&A

Q:How do you ensure product quality?
A:
We follow strict quality control procedures throughout the entire production process. Regular inspections are conducted to make sure every product meets our internal standards and client expectations.
Q:What is your normal production lead time?
A:
Production lead time depends on order quantity and project complexity. We will provide a clear timeline after confirming your specific requirements and production schedule.
Q:Do you provide installation support?
A:
We can provide installation guidance and detailed assembly drawings. For larger projects, onsite support may be arranged based on your needs and project location.
Q:How are your products packaged for delivery?
A:
Products are properly packaged to prevent damage during transit. Different packaging methods are used depending on product size, weight, and shipping distance.
Q:Do you offer after sales support?
A:
Yes, we provide after sales support to address any questions or concerns after delivery. Our team is available to assist with product related issues as needed.

Send Inquiry

*To:Jiangsu Minwell Steel Structure Co., LtdJiangsu Minwell Steel Structure Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

High-Quality Steel Stadium Structure for Modern Sports Facilities
Made-in-China.com
Advanced Innovative Stadium Steel Structures for Energy Savings
Made-in-China.com
Innovative Steel Factory Structures for Modern Warehousing Needs
Made-in-China.com
Sustainable Steel Structures for Modern Stadium Energy Needs
Made-in-China.com
Innovative Precast Steel Frame Structures for Modern Industrial Needs
Made-in-China.com
Innovative Steel Structure for Supermarkets and Hotel Facilities
Made-in-China.com
Modern Design Steel Metal Structures for Sport Halls
Made-in-China.com