SourcingAI
Try for free
Powered by Made-in-China.com
Multi-Storey Steel Structure Residential Buildings Maximizing Urban Land Utilization
US$899.00-1,099.00
1 Ton

Product profile

Customization

Available

Feature

Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable

Install

Support Installation

Trademark

MINWELL

Origin

China

Key features

High Construction Efficiency: Prefabricated assembly reduces construction period by 30%-50% compared to traditional buildings.
Superior Seismic Performance: Designed for high-intensity earthquake areas with strong wind resistance capabilities.
Flexible Open Space Design: Steel beams allow large-span open spaces without protruding columns for high utilization.
Eco-Friendly & Energy Efficient: Recyclable steel and walls improving insulation by 50% reduce construction waste.
Long Design Life: Structures are designed for a 50-year lifespan with low maintenance costs.
Customizable Color Options: Color is fully customizable to meet specific project aesthetic requirements.
PV Integration Support: Roof system supports photovoltaic tiles integration to improve energy efficiency by 40%.
Lightweight Foundation System: Low self-weight reduces foundation costs, often requiring only strip foundations.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2025-09-20Nearest Port: LIANYUNGANG, QINDGAOAverage Response Time: ≤4.96hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, DDP, DAP, CFR

About Our Factory & Business Background

AddressShop of Wuyue Huafu Phase I, Siyang County, Suqian, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Structure Factory, Steel Structure Bridge, Steel Structure Stadium

Our Industry Experience & Global Business Record

Main MarketsSouth America, North America, Mid East

Product Q&A

Q:How do you ensure product quality?
A:
We follow strict quality control procedures throughout the entire production process. Regular inspections are conducted to make sure every product meets our internal standards and client expectations.
Q:What is your normal production lead time?
A:
Production lead time depends on order quantity and project complexity. We will provide a clear timeline after confirming your specific requirements and production schedule.
Q:Do you provide installation support?
A:
We can provide installation guidance and detailed assembly drawings. For larger projects, onsite support may be arranged based on your needs and project location.
Q:How are your products packaged for delivery?
A:
Products are properly packaged to prevent damage during transit. Different packaging methods are used depending on product size, weight, and shipping distance.
Q:Do you offer after sales support?
A:
Yes, we provide after sales support to address any questions or concerns after delivery. Our team is available to assist with product related issues as needed.

Send Inquiry

*To:Jiangsu Minwell Steel Structure Co., LtdJiangsu Minwell Steel Structure Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like