SourcingAI
Try for free
Powered by Made-in-China.com
Heavy-Duty Electrical Transformer for Reliable Power Supply Systems
US$298.51-2,985.07
1 Piece

Product profile

Customization

Available

Application

Power, Electronic

Phase

Three

Model NO.

SCB10

Core

Core-type Transformer

Cooling Method

Dry-type Transformer

Winding Type

Two-winding Transformer

Certification

ISO9001-2000, ISO9001, CCC

Usage

Power Transformer

Frequency Characteristics

Low Frequency

Shape of Core

Ring

Brand

Yuantong

Winding Material

Copper Winding

Input Voltage

10.5kv

Output Voltage

0.27kv*2

Transformer Connection Group

Yyd11d11

Transport Package

Wooden Box

Specification

2650kg/unit

Trademark

Yuantong

Origin

China

Key features

Dual-Split Design: Two isolated low-voltage windings prevent interference and limit short-circuit current.
Oil-Free Safety: Epoxy resin cast structure ensures zero leakage, fire resistance, and eco-friendly operation.
High Energy Efficiency: High-permeability silicon steel core reduces no-load and load losses for significant energy savings.
Fast Installation: Factory pre-assembled design reduces on-site installation time to just 1-2 days.
Space Saving: Indoor footprint saves over 30% compared to traditional oil-type transformers.
Low Noise Operation: Operating noise remains below 55 dB, suitable for sensitive environments.
Easy Maintenance: Maintenance-free design with no need for oil pits or complex daily upkeep.

Company profile

Jiangsu Yuantong Electric Group Co., Ltd.
Importers and ExportersFast DeliveryQuality AssuranceProduct Certification
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Shanghai PortAverage Response Time: ≤4.24h

About Our Factory & Business Background

AddressNantong, Jiangsu, China
Plant Area15458 square meters
Terms of PaymentLC, T/T, D/P
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1
Supply Chain Partners86

Our Production Capability & Technical Expertise

Main ProductsPower Transformer, Oil Immersed Transformer, Dry Type Transformer, Pole Mounted Transformer, Amorphous Alloy Transformer, Compact Substation (European Type Prefabricated, New Energy Transformer, Special Transformer, Open Ventilated Dry Transfomer(Non-Encapsulated), Vpi Dry Transformer
Production Lines5
Production MachinesCross Cutting Production Line, Automatic Laminating Machine, Curing Oven, Pouring Machine, Slitting Cutter, Wire Wrapping Machine
QA/QC inspectors12 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers13 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Main MarketsDomestic
Repeat Buyers Choice10%~30%
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Product CertificationCE
Cooperated with Fortune 500Yes

Product Q&A

Q:What to do if insulation resistance drops on an 1000kVA dry-type transformer?
A:
Main causes are moisture or dust. Dry the unit using hot air, clean surfaces and ducts, and measure the absorption ratio to check for moisture.
Q:How to troubleshoot core multi-point grounding?
A:
Measure the grounding current. If high, check for debris between the core and clamps. This usually requires lifting, cleaning, and insulating the core.
Q:Is a sudden increase in transformer noise normal?
A:
No, it is not normal. It likely indicates loose clamps or harmonics/overvoltage. Tighten bolts, check power quality, and install filters if needed.
Q:What is the standard lead time for this transformer?
A:
The standard lead time is 20 to 30 working days.
Q:What is the warranty period for this product?
A:
We provide a 1-year warranty period for this transformer.

Send Inquiry

*To:Jiangsu Yuantong Electric Group Co., Ltd.Jiangsu Yuantong Electric Group Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like