SourcingAI
Try for free
Powered by Made-in-China.com
Reliable Three-Phase Transformer for Efficient Energy Transformation Solutions
US$2,000.00-20,000.00
1 Piece

Product profile

Customization

Available

Application

Power

Phase

Three

Model NO.

SL13-M-300kVA

Core

Core-type Transformer

Cooling Method

Oil-immersed Type Transformer

Certification

ISO9001-2000, ISO9001, CCC, CE,

Usage

Distribution Transformer

Frequency Characteristics

50/60Hz

Shape of Core

Ring

Brand

Yuantong

Winding Material

Aluminum

Transport Package

Wooden Box

Specification

2000*2000*2000cm

Trademark

YuanTong

Origin

Zhejiang, China

Key features

3D Core Design: Removes air gaps and aligns windings with magnetic paths for superior efficiency.
Level 1 Energy Efficiency: Premium cold-rolled silicon steel and 3D design minimize losses and waste.
Sealed Maintenance-Free Design: Prevents air and moisture ingress for high reliability and overload capacity.
Robust Environmental Adaptability: Built for extreme temperatures and altitudes with optional biodegradable oil.
Noise Reduction: 3D structure design significantly reduces operational noise levels.
Comprehensive Certifications: ISO9001, ISO45001, ISO14001, CCC, and CE certified for global compliance.
Flexible Customization: Offers full, minor, sample, and design-based customization options.
100% Product Inspection: Visual and functional inspection performed on all finished products.

Company profile

Jiangsu Yuantong Electric Group Co., Ltd.
Importers and ExportersFast DeliveryQuality AssuranceProduct Certification
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Shanghai PortAverage Response Time: ≤4.49h

About Our Factory & Business Background

AddressNantong, Jiangsu, China
Plant Area15458 square meters
Terms of PaymentLC, T/T, D/P
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1
Supply Chain Partners86

Our Production Capability & Technical Expertise

Main ProductsPower Transformer, Oil Immersed Transformer, Dry Type Transformer, Pole Mounted Transformer, Amorphous Alloy Transformer, Compact Substation (European Type Prefabricated, New Energy Transformer, Special Transformer, Open Ventilated Dry Transfomer(Non-Encapsulated), Vpi Dry Transformer
Production Lines5
Production MachinesCross Cutting Production Line, Automatic Laminating Machine, Curing Oven, Pouring Machine, Slitting Cutter, Wire Wrapping Machine
QA/QC inspectors12 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers13 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Main MarketsDomestic
Repeat Buyers Choice10%~30%
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Product CertificationCE
Cooperated with Fortune 500Yes

Product Q&A

Q:What is the lead time for orders?
A:
Peak and off-peak season lead times are both within 15 workdays or one month.
Q:What payment terms are accepted?
A:
We accept LC, T/T, and D/P for international transactions.
Q:Do you offer OEM and ODM services?
A:
Yes, both OEM and ODM services are available for our transformers.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 unit.
Q:What certifications does the product have?
A:
The product holds ISO9001, ISO45001, ISO14001, CCC, and CE certifications.

Send Inquiry

*To:Jiangsu Yuantong Electric Group Co., Ltd.Jiangsu Yuantong Electric Group Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like