SourcingAI
Try for free
Powered by Made-in-China.com
Smart Main Transformer with Advanced Safety Features for Users
US$200,000.00-500,000.00
1 Piece

Product profile

Customization

Available

Application

Power, Rectifier

Phase

Three

Model NO.

110kV/220KV/330KV

Core

Silicon Steel Sheets

Cooling Method

Onan/Onaf/Ofaf/Odaf

Winding Type

Two-winding Transformer

Certification

ISO9001-2000, ISO9001, CCC, CE

Usage

Rectifier Transformer, Power Transformer, Distribution Transformer, Power Plant Step-up Transformer

Frequency Characteristics

50Hz/60Hz

Shape of Core

Three-Phase Laminated Core

Brand

Yuantong

Application Areas

Substations / Power Plants / Electrified Railways

Installation Meth

Outdoor Substation

Transport Package

Wooden Box (for Accessories)

Specification

2000*2000*2000cm

Trademark

YuanTong

Origin

China

Key features

High Efficiency Energy Saving: Uses high-permeability silicon steel sheets to meet Level 1 energy efficiency standards.
Safe and Reliable Performance: Exceptional short-circuit withstand capability ensures secure power supply during surges.
Environmentally Friendly Design: Fully sealed structure for maintenance-free operation with low noise and minimal impact.
Compact Structure: Optimized insulation and coil design reduce physical volume and footprint.
Intelligent Monitoring: IoT and digital twin integration enable real-time diagnostics and predictive alerts.
Full Customization Available: Offers full, flexible, and minor customization from samples or designs.
Wide Voltage Application: Suitable for 110kV, 220kV, and 330kV substations and power plants.

Company profile

Jiangsu Yuantong Electric Group Co., Ltd.
Importers and ExportersFast DeliveryQuality AssuranceProduct Certification
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Shanghai PortAverage Response Time: ≤5.42h

About Our Factory & Business Background

AddressNantong, Jiangsu, China
Plant Area15458 square meters
Terms of PaymentLC, T/T, D/P
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1
Supply Chain Partners86

Our Production Capability & Technical Expertise

Main ProductsPower Transformer, Oil Immersed Transformer, Dry Type Transformer, Pole Mounted Transformer, Amorphous Alloy Transformer, Compact Substation (European Type Prefabricated, New Energy Transformer, Special Transformer, Open Ventilated Dry Transfomer(Non-Encapsulated), Vpi Dry Transformer
Production Lines5
Production MachinesCross Cutting Production Line, Automatic Laminating Machine, Curing Oven, Pouring Machine, Slitting Cutter, Wire Wrapping Machine
QA/QC inspectors12 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers13 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Main MarketsDomestic
Repeat Buyers Choice10%~30%
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Product CertificationCE
Cooperated with Fortune 500Yes

Product Q&A

Q:What are the main application scenarios for this transformer?
A:
It is used in power plants, substations, rural grids, industrial enterprises, healthcare, and telecommunications for voltage step-up, step-down, and isolation.
Q:Does the product support customization?
A:
Yes, we offer full, flexible, minor, sample-based, and design-based customization options.
Q:What certifications does the transformer have?
A:
The product holds ISO9001-2000, ISO9001, CCC, CE, ISO45001:2018, and ISO14001 certifications.
Q:What is the lead time for production?
A:
Lead time is within 15 workdays or one month for both peak and off-peak seasons.
Q:What are the payment terms?
A:
We accept LC, T/T, and D/P payment methods.

Send Inquiry

*To:Jiangsu Yuantong Electric Group Co., Ltd.Jiangsu Yuantong Electric Group Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Reliable Smart Transformer with Advanced Insulation for Safety
Made-in-China.com
Advanced Dry Type Transformer with Enhanced Safety Features
Made-in-China.com