Powered by Made-in-China.com

Standard H20 Timber Beam Modern Concrete Formwork Wood I-Joist for Building Sf
US$500.00
100 Pieces
Sample price:US$10.00/piece.Request sample
Product profile
Customization
AvailableConnection Type
Clamp ConnectionFinish
PaintedModel NO.
fsfssfsfMaterial
TimberType
Scaffold FramesTransport Package
LooseSpecification
H20Trademark
yihuiOrigin
ChinaProduction Capacity
200000m2/MonthKey features
High stiffness
Simple assembly and disassembly
All connectors with high standardization
Low cost
Company profile
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs CertifiedExport Year: 11 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤4.25h CertifiedTerms of Payment: LC, T/T, PayPal, etc.
About Our Factory & Business Background
Address1102, Building 1, N0.2 Jinxinrongcheng, Chengdu Road, Lanshan Distric, Linyi, Shandong, China
Plant Area80 square meters
Number of Employees5
Registered Capital10,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity20 cubic meters
Supply Chain Partners7
Our Production Capability & Technical Expertise
Main ProductsQuartz Board
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2014-09-22
Main MarketsSouth America
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What are the available lengths for the H20 beam?
A:
Lengths range from 1000mm to 6050mm, with standard options including 2.45m, 5.65m, 2.90m, 3.30m, 3.60m, 3.90m, 4.50m, 4.90m, and 5.90m.
Q:Can the product be customized?
A:
Yes, customization options are available based on customer samples and specific design requirements.
Q:What is the delivery time?
A:
Delivery is completed within 2-3 weeks after receiving the down payment or upon opening of the L/C.
Q:What materials are used for the flange and web?
A:
The flange is made of solid fir wood (Larch & Spruce Pine/Plywood), and the web is made of poplar LVL (Poplar Plywood/OSB).
Q:What is the minimum order quantity?
A:
The minimum order quantity is 20 cubic meters.
Send Inquiry
*To:Shandong Jinteli New Materials Co., Ltd.
*Content:
Supplier replies will be sent to your registered email
You may also like
Standard H20 Timber Beam Modern Concrete Formwork Wood I-Joist for Building Gdgdd
US$500.00
100 Pieces(MOQ)
Standard H20 Timber Beam Modern Concrete Formwork Wood I-Joist for Building Jtg
US$500.00
100 Pieces(MOQ)
Easy Multi-Functional H20 Wood Joist for Various Formwork Works
US$13.20-13.80
500 Pieces(MOQ)
I Joist Wood Beams LVL OSB Formwork Material I-Joist for Construction Material
US$4.60-6.90
1,000 Meters(MOQ)
Standard H20 Timber Beam Modern Concrete Formwork Wood I-Joist for Building HDF
US$500.00
100 Pieces(MOQ)
Joist Pine LVL I Joists with OSB Board Flooring and Roofing I Joist Wood Beam
US$4.60-6.90
1,000 Meters(MOQ)
Standard H20 Timber Beam Modern Concrete Formwork Wood I-Joist for Building Gfhhfgd
US$500.00
100 Pieces(MOQ)
Comaccord I Joist I Joist 45*63 mm for Australia
US$7.00-8.00
1 Piece(MOQ)
Classic H20 Structural Wood Joist for Civil Engineering
US$21.30-22.60
500 Pieces(MOQ)
I-Joists to The USA and Austrial
US$5.95
1 Meter(MOQ)
Easy Recycle Reusable H20 Wooden Formwork Joist
US$24.60-25.60
500 Pieces(MOQ)
Scaffolding Accessories Octagonal Ringlock Ledger End D48 Head
US$0.80-1.00
5,000 Pieces(MOQ)
High Quality Scaffolding Formwork Adjustable Scaffold Leveling Jacks China Supplier
US$2.00-2.50
100 Piece(MOQ)
Scaffolding Formwork Adjustable Scaffold Leveling Jacks Global Sell
US$2.00-2.50
100 Piece(MOQ)
Building Material Formwork Panel Clamp Locking Wedge Clamp for Scaffolding
US$6.10-6.30
2,000 Pieces(MOQ)
High Quality Scaffolding Formwork Adjustable Scaffold Leveling Jacks Global Sale
US$2.00-2.50
100 Piece(MOQ)
Safe Durable Layher Allround Scaffolding with SGS Certificate for Construction
US$1,100.00-1,200.00
5 Tons(MOQ)
Frame Scaffolding for European Construction Scaffolding/Impalcature System
US$1.00-40.00
18,000 kg(MOQ)
Building Construction Materials Metal Plank Concrete Galvanized Base Jack for Scaffolding
US$2.00-4.00
1,000 Pieces(MOQ)



















