SourcingAI
Try for free
Powered by Made-in-China.com
Semi-Auto Waste Tire Recycling Machine/ Strip Cutter Machine
US$1,500.00
1 sets

Product profile

Customization

Available

After-sales Service

After Services 24 Hours on Line

Warranty

2 Years

Model NO.

QTJ-380

Service Life

≥15 Years

Certification

CCC, CE, ISO

Voltage

380V

Structure

Vertical

Advantage

Easy to Operate

Transport Package

Standard Export Package

Trademark

JUNFAN

Origin

China

HS Code

84778000

Production Capacity

200sets/Year

Key features

High Automation Production: Reduces production costs efficiently with few operators required.
Versatile Material Processing: Converts waste tires, rubber, and plastic into valuable resources.
Multiple Model Options: Available in XKP-400, 450, 560, and 610 models for different capacities.
Wide Mesh Applications: Rubber powder suitable for 5 to 200 mesh applications in various industries.
Long Service Life: Designed for a service life of 15 years or more.
Comprehensive Certifications: Certified with CCC, CE, and ISO standards for safety and quality.
Factory Pre-Testing: Machines undergo 3-5 hours of full load operation testing before shipment.
Global Export Experience: Selling to 126 countries across 6 continents with 30 years of experience.

Company profile

Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization CertifiedExport Year: 8 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤3.31h

AI-Powered supplier vetting

SummaryQingdao Junfan Machinery Co., Ltd. is a China-based limited company described in one slice as a trading company, supplying rubber and related machinery. The supplier reports professional R&D capability, 3D design, full customization, ODM, OEM for known brands, and new products within the past year. It reports more than 10 production lines and 21–30 quality-control staff in one record, although another record states only two employees, creating a material inconsistency requiring verification. The supplier cites ISO9001, measurement-system, and CE certifications, but its certification-management entry is listed as “Others.” Export activity is documented, including self-operated import/export rights and exports beginning in 2018. Service-control documentation is weak: there are no written procedures or records for service assessment or corrective/preventive actions, and complaint handling has a procedure without written records. No inventory, overseas warehouse, or overseas showroom capability is reported....
CertificationsThe supplier states that it obtained ISO9001 quality assurance, ISO9001 measurement-system certification, and CE certification. However, its supplier-management certification entry is recorded only as “Others,” so the complete certification status and supporting validity details are not established.
After-Sales capabilityThe supplier has a complaint-handling procedure, but no written records are available; service-capability assessment and corrective/preventive-action procedures also lack written procedures or records. It additionally reports no inventory, overseas warehouse, or overseas showroom capability, indicating limited documented service infrastructure.
R&D capabilityThe supplier identifies itself as a professional technical supplier, provides 3D software design services, and reports new products within the past year. Its stated nearly 20 years of experience and ability to design machinery for differing technical requirements further support technical development capability.
Customization capabilityThe supplier explicitly offers customization from designs and full customization, 3D design services, ODM services, and OEM services for known brands. It also states that machinery can be designed and manufactured according to customers’ technical requirements and delivery times.

Product Q&A

Q:What is the delivery time for rubber machines?
A:
It takes about 25 to 35 days from engineer designing to production completion.
Q:How do you ensure quality control?
A:
We focus on quality from start to finish. Every machine is fully assembled and carefully tested before shipment.
Q:What is the machine quality guarantee period?
A:
The quality guarantee time is one year after installation.
Q:Do you provide overseas installation and commissioning?
A:
Yes, we supply overseas service and technical support, but the customer needs to pay for the installation cost. Small machines take 2-3 days, while big plants take about 30 days.
Q:How can I trust you to deliver the right machine?
A:
We deliver high-quality machines as discussed and confirmed in the order. Our core culture is innovation, quality, integrity, and efficiency.

Send Inquiry

*To:QINGDAO JUNFAN MACHINERY CO., LTD.QINGDAO JUNFAN MACHINERY CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Advanced Waste Rubber Scrap Tyre Recycling Machinery

Advanced Waste Rubber Scrap Tyre Recycling Machinery

US$585,000.00-1,500,000.00
1 Set(MOQ)
Made-in-China.com
Rubber Strip Cutting Machine for Waste Tyre
Made-in-China.com
Waste Tyre Tire Strip Cutter Machine for Tires
Made-in-China.com