SourcingAI
Try for free
Powered by Made-in-China.com
High Efficiency Dimmable LED Wall Lights and Ceiling Lights
US$15.00-20.00
100 Pieces
Sample price:US$32.00/piece.Request sample

Product profile

Customization

Available

Light Body Material

Stainless Steel

Emitting Color

White

Model NO.

JR-D27

IP Rating

IP40

Power Factor

0.9

Voltage Ranging

100-277V

Dimming

0-10V

Driver Solution

Isolated/Non-Isolated

Detachable

Yes

Efficiency

130lm/W

Warranty

3-5 Years

Transport Package

Carton

Specification

L*W*H: 1200mm*135mm*55mm

Trademark

Zuiki

Origin

Zhongshan, China

HS Code

9405409000

Production Capacity

100, 000pieces/Year

Key features

High Efficiency & Dimmable: 130lm/W efficiency with 0-10V dimming capability for energy saving.
Durable Stainless Steel: Light body made of stainless steel for long-lasting performance.
Wide Voltage Range: Supports 100-277V input voltage for versatile global application.
Multiple Certifications: Certified with CCC, CE, RoHS, and ETL for safety and compliance.
OEM/ODM Customization: Accepts customized orders including logo printing and design.
3-5 Years Warranty: Comprehensive warranty coverage for product reliability.
Commercial Application: Ideal for hotels, shops, and other commercial spaces.
Flexible Shipping: Supports DHL, UPS, FedEx, and sea freight options.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2009-05-01Nearest Port: Zhongshan Port, Shenzhen Port, Guangzhou PortAverage Response Time: ≤4.37hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, Others

AI-Powered supplier vetting

SummaryZhongshan Jurong Lighting Co., Ltd. is identified as a Chinese manufacturer/factory specializing in commercial and industrial LED lighting. The supplier reports ISO 9001 certification, 10 production lines, 11–20 quality-control staff, and 41–50 years of combined R&D engineer experience. Its listed annual output is 3,000,000 lighting pieces, and it has exported since 2009, with 51%–70% of sales from exports and markets across multiple regions. Product certifications listed include PSE, SAA, TUV, ETL, DLC, CB, CE, RoHS, and CCC. Evidence supports production, export, quality-management, and product-development capabilities. However, the provided information does not sufficiently establish after-sales service, financial credibility, customization capability, or specific customer cases.
Supplier typeThe supplier is consistently identified as a limited company and manufacturer/factory based in Zhongshan, Guangdong, China. Its stated business focuses on researching, producing, and selling LED lighting products and systems, particularly commercial and industrial lighting.
CertificationsThe supplier reports ISO 9001 certification and lists PSE, SAA, TUV, ETL, DLC, CB, CE, RoHS, and CCC certifications for its products. These statements provide explicit evidence of management-system and product-certification coverage, although the supplied slices do not include certificate numbers, validity dates, or scope details.
R&D capabilityThe supplier is described as a national high-tech enterprise engaged in R&D and reports 41–50 years of total R&D engineer experience. It also jointly developed and improved dimmable poultry lighting with a Japanese company, providing direct evidence of product-development activity.
Production capacityThe supplier reports 10 production lines, 11–20 quality-control staff, and annual output of 3,000,000 lighting pieces across tri-proof, batten, vapor, ceiling, and tube-light products. Its factory status and stated manufacturing focus further support established production capability.

Product Q&A

Q:Can I have a sample order for led light?
A:
Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q:What about the lead time?
A:
Quick delivery time 3-5 working days for sample order, 12-20 working days for bulk orders. The actual delivery time depends on order quantities and production plans.
Q:Do you have any MOQ limit for led light order?
A:
Low MOQ, 1pc for sample checking is available
Q:How do you ship the goods and how long does it take to arrive?
A:
We usually ship by sea, DHL, UPS, FedEx also optional, It usually takes 3-10 days to arrive.
Q:How to proceed with an order for led light?
A:
Step 1: Let us know your requirements or application. Step 2: We offer quotations or solutions for you according to your requirements. Step 3: You confirm the order and place deposit for formal order. Step 4: We arrange the production.

Send Inquiry

*To:Zhongshan Jurong Lighting company limitedZhongshan Jurong Lighting company limited
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like