Powered by Made-in-China.com

Customized Eco-Friendly Industrial 3PE Coating Steel Pipe for Water Conservancy Engineering
US$700.00-800.00
100 Pieces
Sample price:US$20.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
YesType
WeldedTechnique
ExtrudedMaterial
3PE Coated SteelUsage
Pipeline Transport, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Chemical Industry, Mining, Construction & Decoration, Special Purpose, Power Industry,Municipal EngineeringBase Pipe Type
Hfw Steel Pipe, LSAW Steel PipeOuter Diameter (Od)
114.3mm-1219mmWall Thickness (Wt)
3mm-40mm3PE Coating Thickness
Fbe Layer:100-300μm;Adhesive Layer:100-200μmBase Pipe Steel Grade
Grade B, X42-X70, S275-S460, L245-L485Execution Standards
DIN30670, CSA Z245, ISO21809, Sy/T0413Length
6m-13mService Temperature
-40℃-80℃End Type
Plain End, Beveled End, Flange ConnectionTransport Package
Standard PackagingSpecification
customizedTrademark
juyiOrigin
ChinaHS Code
7305120000Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 8 Years CertifiedNearest Port: Yantian Port, Yantian Port, Nansha Port, Shekou Port,Shenzhen PortAverage Response Time: ≤0.58h
About Our Factory & Business Background
Address21 Beijiang Rd, Dawang Hi-Tech District, Sihui, Zhaoqing, Guangdong, China
Plant Area133333 square meters
Number of Employees235
Registered Capital200,000,000 RMB
Terms of PaymentLC, PayPal, D/P, T/T, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Minimum Order Quantity20 Tons
Supply Chain Partners17
Our Production Capability & Technical Expertise
Main ProductsHFW Pipe, LSAW Pipe, 3PE/3PP Coated Pipe
Production Lines5
Production MachinesHFW Production Workshop, LSAW Production Workshop
QA/QC inspectors33 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers3 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2017-11-21
Main MarketsSouth America, Southeast Asia/ Mideast, Australia, Domestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500Yes
Send Inquiry
*To:
JUYI STEELPIPE CO., LTD.
JUYI STEELPIPE CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Premium 3PP 3PE Coating Carbon Steel Pipe for Industrial Use
US$1,000.00
1 Ton(MOQ)
En10255 Pre-Galvanized Steel Pipe - Sch40 ERW Tube for Water with Zinc Coating
US$500.00-620.00
25 Tons(MOQ)
3PE Anti-Corrosion Coating Equipment for Water Oil Steel Pipe
US$650.00-750.00
20 Tons(MOQ)
Heavy Duty Anti Corrosion Carbon Steel Welded Pipe for Water Projects
US$490.00-890.00
1 Ton(MOQ)
API 5L ASTM A36 3PE Painted SSAW Black Round Low Carbon Steel Welded Pipe for Water Delivery
US$460.00-680.00
5 Tons(MOQ)
China Factory Architectural Eco-Friendly Flexible Carbon Steel Pipe Fitting for Industry
US$520.00-565.00
1 Ton(MOQ)
Corrosion Resistant Coated Welded Steel Pipe for Water and Gas Transportation
US$490.00-890.00
1 Ton(MOQ)
Grooved End Galvanized Steel Pipe for Industrial Cooling and HVAC Water Systems
US$500.00-620.00
25 Tons(MOQ)
Threaded Hot DIP Galvanized Steel Pipe with Couplings for Water, Gas and Industrial Projects
US$650.00-760.00
1 Ton(MOQ)
3PE Coated Carbon Steel Welded Pipe for Oil and Water Pipeline Engineering
US$490.00-890.00
1 Ton(MOQ)
Welded Galvanized Steel Pipe for Industrial Circulating Cooling Water System
US$500.00-620.00
25 Tons(MOQ)
Seamless Steel Pipe with Threaded Ends for Water Well Construction with Anti-Corrosion Treatment
US$700.00-1,200.00
1 Ton(MOQ)



















