Powered by Made-in-China.com

Customized Straight Durable Carbon Steel Pipe for Hydraulic Engineering
US$580.00-800.00
5 Pieces
Sample price:US$50.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
YesType
WeldedTechnique
LSAW Steel PipeMaterial
Carbon SteelSurface Treatment
VarnishingUsage
Pipeline Transport, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Chemical Industry, Mining, Construction & Decoration, Offshore & Marine EngineeringOuter Diameter (Od)
406.4mm-1420mmWall Thickness (Wt)
8mm-40mmStandard Length
6m/12mSteel Grade
Grade B, X42-X70, S275-S460, L245-L485Execution Standards
API 5L, ASTM A53, ASTM A572, En10219Welding Process
Double-Sided Submerged Arc Longitudinal WeldingTesting Method
Hydrostatic Test, Ultrasonic TestingSurface & Coating
Black Painted, Varnish, Galvanized, 3PE/2PE/FbeEnd Type
Plain End, Beveled End, Grooved EndTransport Package
Standard PackagingSpecification
customizedTrademark
juyiOrigin
ChinaHS Code
7305120000Production Capacity
30000pieces/YearCompany profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 8 Years CertifiedNearest Port: Yantian Port, Yantian Port, Nansha Port, Shekou Port,Shenzhen PortAverage Response Time: ≤6.69h
About Our Factory & Business Background
Address21 Beijiang Rd, Dawang Hi-Tech District, Sihui, Zhaoqing, Guangdong, China
Plant Area133333 square meters
Number of Employees235
Registered Capital200,000,000 RMB
Terms of PaymentLC, PayPal, D/P, T/T, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Minimum Order Quantity20 Tons
Supply Chain Partners17
Our Production Capability & Technical Expertise
Main ProductsHFW Pipe, LSAW Pipe, 3PE/3PP Coated Pipe
Production Lines5
Production MachinesHFW Production Workshop, LSAW Production Workshop
QA/QC inspectors33 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers3 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2017-11-21
Main MarketsSouth America, Southeast Asia/ Mideast, Australia, Domestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500Yes
Send Inquiry
*To:
JUYI STEELPIPE CO., LTD.
JUYI STEELPIPE CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Carbon Square Steel Pipe Manufacturers Tube Fittings Products Price Metal Pipes for Automotive Chassis
US$450.00-500.00
1 Ton(MOQ)
Durable Pre Galvanized Rectangular Steel Pipe for Pipeline Transport
US$580.00-700.00
1 Ton(MOQ)
Factory Direct ASTM A53 ASTM A500 ERW Black Steel Pipe Sch40 for Fence Post & Engineering
US$530.00-580.00
20 Tons(MOQ)
Durable Welded Hollow Section Steel Pipe for Frame Structure
US$2.00-5.00
10 Tons(MOQ)
Customized Size 10" Schedule 40 Carbon Steel Pipes for Building
US$430.00-450.00
5 Tons(MOQ)
Xsh Premium Durable Carbon Steel Seamless Pipe for Applications
US$520.00-540.00
1 Ton(MOQ)
Stable Dimension Steel Pipe for Strict Engineering Standards
US$5.00
10 Tons(MOQ)
Customizable Durable PE/Epoxy Steel Pipe for Oil and Mining
US$11.25-222.60
100 Meters(MOQ)
Reliable Carbon Steel Pipe for Durable Industrial Applications
US$550.00-650.00
1 Ton(MOQ)
Durable Pre Galvanized Rectangular Steel Pipe for Reliable Pipeline Systems
US$580.00-700.00
1 Ton(MOQ)
Customized Length Stainless Steel Seamless Pipe 316 316L for Industrial Engineering Construction Use Pipe
US$1,000.00-2,500.00
1 Ton(MOQ)
Customized Durable 201 Stainless Steel Welded Tube Pipe for Industry
US$950.00-1,850.00
1 Ton(MOQ)
Galvanized Straight Seam Welded Rectangular Steel Pipe/Tube for Mechanical Engineering
US$659.00-669.00
25 Tons(MOQ)
in Stock Straight Welded A53 Black Carbon Steel Pipe for Oil and Gas Pipeline
US$550.00-1,000.00
1 Ton(MOQ)
JIS G3454 G3455 G3456 Carbon Steel Tube Seamless/Welded Steel Pipe for Structural Mechanical General Engineering
US$420.00-490.00
25 Tons(MOQ)



















