SourcingAI
Try for free
Powered by Made-in-China.com
Heavy-Duty Truss Formwork System for Bridge and High-Rise Construction
US$450.00-1,150.00
1 Set

Product profile

Customization

Available

After-sales Service

on Line Service

Certification

ISO, ROHS, CE

Model NO.

CB240 Climbing Formwork System

Material

Steel

Type

Climbing Formwork

Color

Customized

Application

High Rise Building

Feature

Modular Formwork

Length

Customized

HS

7308400000

Project Solution Capability

Graphic Design, 3D Model Design, Total Solution

Usage

Bridge or Tall Building

Transport Package

Standard Package

Specification

Customized

Trademark

JIUYING

Origin

China

Production Capacity

1000 Set/Each Month

Key features

Dual Climbing Unit Options: Offers pull-push prop and truss climbing units for varied load and height requirements.
Anchor-Based Pressure Resistance: Integrated anchor system and tie-rods support concrete lateral pressure without extra reinforcement.
Customized Color and Length: Color and length are fully customizable to meet specific project design needs.
High-Performance Pouring: Achieves significant single-pour heights with a flawless, finished concrete surface.
Rapid and Economical Construction: Streamlined assembly enables faster project turnaround and lower overall costs.
Graphic Design Capability: Provides 3D model design and total solution services for project planning.
ISO, ROHS, CE Certified: Meets international safety and quality standards with comprehensive certifications.
Steel Material Construction: Built with robust steel for durability and high load-bearing capacity.

Company profile

Qingdao Jiuying Formwork & Scaffolding Co., Ltd.
Exhibition ExperienceHigh Repeat Buyers ChoiceImporters and ExportersQuality Assurance
Business Type: Manufacturer/FactoryExport Year: 2015-01-30Nearest Port: qingdaoAverage Response Time: ≤2.85hTerms of Payment: LC, T/T, PayPalInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP

AI-Powered supplier vetting

SummaryThe supplier, Qingdao Jiuying Formwork & Scaffolding Co., Ltd., is a Chinese company based in Shandong, specializing in building formwork and lifting frames. It integrates various services from R&D to after-sales. Their export sales comprise 51% to 70% of total sales, though they lack ODM and OEM capabilities. They hold multiple certifications, including ISO standards, and have a robust quality control team. However, there are no recent innovations or new product developments. The company also lacks in-stock service capacity, overseas warehouse management, and effective customer complaint handling procedures.
Supplier typeThe supplier is a combined type company, focusing on building formwork and lifting frames, integrating R&D, design, manufacturing, sales, and services.
CertificationsThe supplier holds a wide array of certifications, including OHSAS 18001, ISO 9001, and ISO 14001, indicating compliance with international standards.
R&D capabilityThe company has not developed new products in the past year and does not provide ODM services, indicating limited innovation capability.
Production capacityThe supplier operates two production lines with a significant annual output exceeding US$100 million.
Customization capabilityThe supplier offers customization based on designs, demonstrating capability in tailored manufacturing.

Product Q&A

Q:What design services are offered?
A:
We offer consulting, design, and quotation services including Auto-CAD proposals based on your structural drawings.
Q:How is quality controlled during manufacturing?
A:
We use large-scale production workshops with professional inspection teams and provide test reports according to regional norms.
Q:What packaging is used for shipment?
A:
Standard export packages are used from fabrication to loading to ensure quick and safe delivery to your site.
Q:Is technical support available after purchase?
A:
Yes, we provide remote or on-site instruction to ensure customers feel at ease and satisfied throughout the process.
Q:What are the lead times for production?
A:
Peak season lead time is one month, while off-season lead time is within 15 workdays.

Send Inquiry

*To:Qingdao Jiuying Formwork & Scaffolding Co., Ltd.Qingdao Jiuying Formwork & Scaffolding Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Heavy-Duty Skydeck Formwork System for Quick Installation Solutions
Made-in-China.com