SourcingAI
Try for free
Powered by Made-in-China.com
High-Strength ABS Engineering Plastic Formwork with Smooth Finish for Fair-Faced Concrete
US$40.00-50.00
500 Square Meters

Product profile

Customization

Available

After-sales Service

on Line Service

Warranty

180 Days

Model NO.

Plastic Formwork

Certification

ISO9001, RoHS, CE

Surface Treatment

Nature

Position

Building

Material

Plastic

Project Solution Capability

Total Solution for Projects

Application

All Architectural Scenes

Design Style

Industrial

Length

Customized

Model Number

Plastic Formwork

Compressive Strength

Stronger

Transport Package

Standard Packaging

Specification

Customized

Trademark

JIUYING

Origin

China

HS Code

3925900000

Production Capacity

10000 Pieces/Each Month

Key features

Customized Length: Length is fully customized to fit specific project structural drawings.
Total Project Solution: Provides complete design, forming, and shoring proposals via Auto-CAD.
High Turnover Rate: PP version offers 50+ turnovers; ABS version offers 30-50+ reuses.
Smooth Concrete Finish: ABS material ensures fair-faced concrete with no secondary plastering needed.
Lightweight Design: Weighs only 1/7 of steel, allowing easy cutting, nailing, and drilling.
Eco-Friendly Material: Made from 100% recyclable materials including Regrind, ABS, and PP.
No Release Agent Needed: PP formwork allows easy demolding without requiring release agents.

Company profile

Qingdao Jiuying Formwork & Scaffolding Co., Ltd.
Exhibition ExperienceHigh Repeat Buyers ChoiceImporters and ExportersQuality Assurance
Business Type: Manufacturer/FactoryExport Year: 2015-01-30Nearest Port: qingdaoAverage Response Time: ≤2.59hTerms of Payment: LC, T/T, PayPalInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP

AI-Powered supplier vetting

SummaryThe supplier is a China-based building formwork and lifting-frame company providing R&D, design, manufacturing, sales, leasing, installation, and after-sales services. It reports two production lines, 31–40 years of combined R&D engineer experience, 50 quality-control staff, and multiple management-system certifications. Customization from designs and documented finished-product inspection procedures are available. However, the available information indicates no new products in the past year, no ODM, SDK, or recognized-brand OEM services, no in-stock capacity, no overseas warehouse or showroom, and no valid manufacturing-capacity contract with affiliated subcontractors. Written procedures and records exist for service assessment, but not for corrective and preventive actions or customer-complaint handling. No specific customer cases are provided.
Supplier typeThe supplier is a China-based combined company focused on building formwork and lifting frames, with integrated R&D, design, manufacturing, sales, leasing, installation, and after-sales operations. Its registered scope also covers construction machinery, metal structures, building materials, hardware, waterproof products, and import/export agency services.
CertificationsThe supplier reports holding or operating under a broad range of certifications and management systems, including OHSAS/OHSMS 18001, TS 16949, ISO 9000, ISO 9001, ISO 14001, ISO 14000, ISO 20000, ISO 14064, HSE, and QC 080000. The provided information does not include certificate numbers, issuing bodies, or validity dates.
After-Sales capabilityAfter-sales support is explicitly included in the supplier’s integrated service offering, and written procedures with follow-up records exist for assessing service capability. However, the supplier reports no written procedures or records for corrective and preventive actions or effective customer-complaint handling, indicating a documented weakness in service-quality escalation and remediation.
R&D capabilityThe supplier reports 31–40 years of combined R&D engineer experience and describes R&D as part of its operations. Nevertheless, it reports no new products during the past year and does not provide ODM services or an SDK, which limits evidence of current product innovation and development-platform capability.
Production capacityProduction resources include milling, pipe-welding, and punching equipment, two production lines, 50 quality-control staff, and documented instructions that are uniformly followed for finished-product inspection. The supplier reports no in-stock capacity and no valid manufacturing-capacity contract with affiliated subcontractors, so production scale and fulfillment flexibility are mixed.
Customization capabilityThe supplier explicitly offers customization from designs and integrates design, manufacturing, installation, and after-sales services for building templates and lifting frames. This supports project-specific customization, although the information does not provide examples, technical limits, or delivery performance for customized orders.

Product Q&A

Q:What customization options are available?
A:
We offer customized length and total project solutions including design and forming proposals based on your structural drawings via Auto-CAD.
Q:How many times can the formwork be reused?
A:
The PP version supports over 50 turnovers, while the ABS version supports 30 to 50+ reuses.
Q:What is the warranty period?
A:
We provide an 180-day warranty for our plastic formwork systems.
Q:Do you offer technical support?
A:
Yes, we provide remote or on-site instruction to ensure customers feel satisfied throughout the process.
Q:What certifications do you have?
A:
Our products are certified under ISO9001, RoHS, and CE standards.

Send Inquiry

*To:Qingdao Jiuying Formwork & Scaffolding Co., Ltd.Qingdao Jiuying Formwork & Scaffolding Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like