Powered by Made-in-China.com

Advanced Silencer Technology for Optimal Performance by Jinboss
US$12.00-15.00
100 Pieces
Product profile
Customization
AvailableCertification
CCCStandard Component
Standard ComponentModel NO.
SILENCERType
SilencerN.W.
5.213Transport Package
Paper Box/Carton/Air Bubble FilmTrademark
KAINIUOrigin
Chongqing, ChinaKey features
CCC Certification: Product holds CCC certification ensuring compliance with safety standards.
Standard Component: Designed as a standard component for easy integration and replacement.
T/T Payment Terms: We accept Telegraphic Transfer (T/T) for secure and efficient payments.
Flexible Delivery Terms: Supports EXW and FOB terms to accommodate various logistics needs.
Fast Lead Time: Off-season lead time is within 15 workdays for quick turnaround.
Carton Packaging: Goods are generally packed in cartons to ensure safety during transit.
Global Reach: Serving main markets in South America, Southeast Asia, and Africa.
Tricycle Parts Expert: Manufacturer specializing in tricycle parts and motorcycle engine components.
Company profile
Business Type: Manufacturer/FactoryExport Year: 2024-04-01Nearest Port: chongqing, guangzhouAverage Response Time: ≤2.34hTerms of Payment: T/TInternational Commercial Terms(Incoterms): FOB, CFR
AI-Powered supplier vetting
SummaryChongqing Jinboss Import & Export Co., Ltd. supplies tricycles and aftermarket accessories, with stated OEM, ODM, and broad customization capabilities. It exports 90% of total sales, has exported for four years, and serves several African countries through overseas agents or branches. Its service offering includes installation, debugging, and repair, while average peak- and off-season lead times are both one month. The supplier reports written service-capability procedures and records and has participated in the Canton Fair. However, it has no overseas warehouse, showroom, private molds, 3D design services, or SDK, and reports no new products in the past year. Raw-material traceability, digitalization, ERP integration, sustainable-practice implementation, and certification status are not sufficiently evidenced. An audit by BV is documented, but the audit type and evaluation result are not interpretable from the provided values.
After-Sales capabilityThe supplier states that it provides equipment installation, debugging, and repair in Nigeria, Benin, Côte d'Ivoire, Togo, Tanzania, and Kenya through overseas agents or branches. It reports no overseas warehouse or showroom, but its company description also states that it has established a pre-sale and after-sales service system.
R&D capabilityThe supplier offers ODM services and multiple forms of customization, but reports no new products in the past year, no available SDK, no private molds, and no 3D software design services. These explicit limitations indicate weak evidence of recent product innovation and supporting technical development.
Production capacityThe supplier reports four years of export experience, 90% export sales, one-month average lead times in both peak and off seasons, 100 qualified service-capability suppliers, and written procedures with follow-up records. Its company description claims accumulated production experience, but raw-material traceability, digitalization, ERP integration, and sustainable-production implementation remain unknown.
Customization capabilityBoth general design-service and R&D information list customization from samples, designs, full customization, minor customization, and flexible customization. The supplier also reports ODM availability, providing explicit evidence of broad customization support despite the absence of private molds and 3D software design services.
Product Q&A
Q:What are your terms of packing?
A:
Generally, we pack our goods in carton.
Q:What are your terms of payment?
A:
We accept T/T.
Q:What are your terms of delivery?
A:
EXW, FOB.
Q:How about your delivery time?
A:
Generally, it will take 30 to 45 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q:What is the off-season lead time?
A:
Off Season Lead Time: within 15 workdays.
Send Inquiry
*To:
CHONGQING NEW KAINIU INDUSTRY CO., LTD
CHONGQING NEW KAINIU INDUSTRY CO., LTD*Content:
Supplier replies will be sent to your registered email
You may also like
912 Diesel Engine Spare Parts Exhaust Silencer 02160568 for Deutz
US$60.00-70.00
1 Piece(MOQ)
Original Wheel Loader Spare Parts Silencer 860130769 for Wheel Loader
US$45.70-50.00
1 Piece(MOQ)
Genuine Silencer A229900005317 for Crane
US$115.00-120.00
1 Piece(MOQ)
Heat-Resistant Exhaust Silencer for Gasoline Engine Water Pump
US$4.00-5.00
10 Pieces(MOQ)
Industrial Residential Muffler Silencer for Diesel Engine Generator Set Natural Gas Generator Biogas Genset
US$800.00-1,500.00
1 Piece(MOQ)
Good quality Water Cooled Diesel Engine Spare Parts Silencer
US$20.00-25.00
100 Pieces(MOQ)
Premium Long Silencer for Ultimate Noise Reduction and Comfort
US$12.00-15.00
100 Pieces(MOQ)
High-Efficiency Industrial Muffler for Generator Sets, Gas/Diesel Generator Silencer
US$300.00-800.00
1 pcs(MOQ)
Spare Parts for Zs195 12HP Hand-Start Diesel Engine
US$40.00
100 Bags(MOQ)
Diesel Engine Parts for Hand-Start Zs1115 22HP Model
US$10.00
100 Bags(MOQ)
Premium Zs1115 Engine Parts for Optimal Vehicle Functionality and Longevity
Negotiable
1,000 Pieces(MOQ)
Mitsubishi 4m50 Genuine Engine Part Fuel Injection Common Rail Me228861
US$321.17
1 Piece(MOQ)
Cylinder Piston Liner Kit 2881748f 5258754f 4089258f Isf 3.8 Foton Truck Engine Spare Parts for Cummins
US$100.00-120.00
1 Piece(MOQ)



















