SourcingAI
Try for free
Powered by Made-in-China.com
Fire Fighting Pipe Fittings Fire Protection System Thread Brass Hose Connector
US$5.00
100 Pieces

Product profile

Customization

Available

Usage

Power Station, Gas, Sewage Treatment, Public Works

Customized

Yes

Model NO.

KL-47

Application

Pipe Lines Connect

Transport Package

Wooden Case by Sea

Specification

1/2"

Trademark

KL

Origin

Wenzhou, Zhejiang Province, China

HS Code

8481804090

Production Capacity

1000000

Key features

Wide Material Selection: Available in stainless steel, steel, bronze, brass, aluminum, zinc plated, and hot dip galvanized.
Advanced Machining: Utilizes CNC milling, grinding, laser, and turning machines for precision manufacturing.
Diverse Surface Finish: Offers anodizing, polishing, plating (zinc/nickel/chrome/gold), sandblasting, and DLC coating.
Custom Design Service: Welcome customized designs with experienced engineers to adjust parameters for perfect products.
High Production Capacity: Equipped with 40 CNC lathes and strict inspection by highly trained personnel.
Flexible Delivery Options: Supports shipping by air, sea, or courier based on customer request.
Fast Lead Time: 18-25 days for new orders and 15-20 days for repeated orders from confirmation.
OEM/ODM Support: Provides OEM and ODM services with customization from samples, designs, or full customization.

Company profile

Yueqing Karen Metal Co., Ltd.
Importers and ExportersFast DeliveryFlexible CustomizationR&D Capabilities
Business Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Ningbo PortAverage Response Time: ≤0.01h

About Our Factory & Business Background

AddressWenzhou, Zhejiang, China
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity3000 Pcs
Supply Chain Partners3

Our Production Capability & Technical Expertise

Main ProductsValve, Hose, Metal Parts, Joint Fittings, Electrical Power System Products
R&D Engineers1 people

Our Industry Experience & Global Business Record

Main MarketsSoutheast Asia/ Mideast
Number of Foreign Trading Staff7
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Product Q&A

Q:Where is your company or factory located?
A:
We are located in Yueqing county zhejiang province, We have our own factory.
Q:Can you make design?
A:
We'll be glad to design molds for you.
Q:What's the delivery method?
A:
We can arrange for the product to be shipped by air,by sea, by courier, etc by customer request.
Q:What's the delivery time?
A:
Generally, the lead time is 18-25 days for new orders and 15-20days for repeated orders from the confirmation date.
Q:What type of mould you can make?
A:
We can produce various plastic injection molds with rich experience.We have extensive experience in manufacturing products using these materials and know how to adjust parameters to get perfect products.

Send Inquiry

*To:Yueqing Karen Metal Co., Ltd.Yueqing Karen Metal Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Dismantling Joint Pipe Fittings Removable Connector
Made-in-China.com
Brass Connector (5 Way)

Brass Connector (5 Way)

Negotiable
50 Pieces(MOQ)
Made-in-China.com