SourcingAI
Try for free
Powered by Made-in-China.com
Affordable Modular Panelized Fast Assembly Prefabricated SIP House
US$40.00-65.00
300 Square Meters

Product profile

Customization

Available

Certification

CE, ISO9001, CE, ISO, SGS

Customized Or Not

Customized

Model NO.

KH-PH

Material

Sandwich Panel

Material

Steel Structure

Wall Panel

EPS/ Rock Wool/PU Sandwich Panel

Steel Frame

Gavalnized Square Tube Purlin

Door

Steel Door/Sandwich Panel Door

Usage

Dormitories, School, Villa, Temporary Offices

Customized

Customized

Transport Package

Bubble Foil and Plywood Based on Client Requireme

Specification

Customized

Trademark

K-HOME

Origin

Henan, China

HS Code

9406000090

Production Capacity

30000m2/Month

Key features

Fast Assembly Speed: 6 people can finish a standard 3K*10K house in 2 days; 20-30m2 per person daily.
Customizable Design: Customized material, steel frame, doors, and layout. Flexible window/door placement.
High Safety Standard: Resists 7-grade earthquakes and 100km/h winds. Light steel structure is safe and reliable.
Durable & Waterproof: Anti-corrosion lacquer coating ensures over 10 years service life. Rigorous waterproof design.
Eco-Friendly & Reusable: Components can be repeatedly disassembled and reinstalled. No industrial waste generated.
Certified Quality: Products certified with CE, ISO9001, and SGS standards for global compliance.
Versatile Applications: Suitable for dormitories, schools, villas, temporary offices, and disaster resettlement housing.
Easy Maintenance: Simple terrain requirements. Repainting every 1-2 years extends life and keeps appearance.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-11-04Nearest Port: Tianjin & QingdaoAverage Response Time: ≤11.24hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DDP, EXW

AI-Powered supplier vetting

SummaryThe supplier is a combined company located in Xinxiang, offering various prefabricated and modular structures. It holds ISO9001:2015 and CE certifications, indicating a focus on quality and compliance. Despite a lack of inventory and overseas facilities, it demonstrates strong R&D and customization capabilities, providing OEM and ODM services. The supplier has a clear procedure for handling customer complaints and service capability assessment. Financial data shows consistency over the past three years, but specific contract validity for manufacturing capacity is lacking.
CertificationsThe supplier holds ISO9001:2015 and CE certifications, indicating compliance with quality management and European standards.
After-Sales capabilityThe supplier has clear procedures for handling customer complaints and corrective and preventive actions.
Financial creditFinancial data, including cash flow and profit indices, is available for the past three years, indicating stable financial management.
R&D capabilityThe supplier has R&D capabilities, providing customization and ODM services, and released new products last year.
Production capacityThe supplier lacks valid manufacturing contracts and does not have inventory or overseas facilities.
Customization capabilityThe supplier offers a range of customization services, including full and flexible customization options.

Product Q&A

Q:How to install the houses on site?
A:
We offer three options: 1. Provide manual, photos, drawings, or videos for local installation (93% of clients). 2. Send our team to guide or install (requires covering travel, accommodation, and salary; usually for orders >$100,000). 3. Send your engineers to our company for training.
Q:What are the advantages of this prefab house?
A:
Key advantages include: 1. Recyclable and reusable. 2. Lower cost than traditional buildings. 3. Quick installation (150 sq.m/day for 6 skilled workers). 4. High safety (resists 7-grade earthquakes and 100km/h winds).
Q:What are the main uses of this prefab house?
A:
It is mainly used as a temporary building on sites, such as temporary offices and labor accommodations. It is also widely used for resettlement housing in disaster areas.
Q:How to maintain the prefab house?
A:
Avoid structural changes like adding partitions or cutting walls after installation. Repaint every 1-2 years to extend service life. Do not tie wires to the house to prevent uneven force and electric shock risks.
Q:How to prepare the foundation?
A:
We provide foundation drawings. Typically, the K-style house uses a strip foundation. You should prepare the foundation according to these provided designs.

Send Inquiry

*To:Henan K-Home Steel Structure Co., Ltd.Henan K-Home Steel Structure Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Fast Assembly Site Office Mobile Modular Container House
Made-in-China.com
Construction Site Steel Building Prefabricated Modular House
Made-in-China.com