SummaryZhangjiagang King-MACC Machinery Manufacturing Co., Ltd. is a China-based manufacturing factory and Sino-Italy foreign joint venture producing pipe and tube processing equipment, including bending, cutting, and end-forming machines. The supplier reports a manufacturing area of 18,000 m², approximately 148–150 employees, eight production lines, and annual capacity of 600 bending machines and 6,000 cutting machines. It states that it maintains advanced processing and testing equipment, quality-control and after-sales systems, and holds ISO9001 and CE certifications; ISO9001:2008 is specifically identified. The company reports broad export coverage and a lead time of within 15 working days during off-peak periods. Evidence confirms manufacturing and production scale, but does not sufficiently verify financial credibility, proprietary innovation, detailed customization processes, or named customer cases.
Supplier typeThe supplier is identified as a manufacturing factory in China, operating in Jiangsu and producing industrial equipment and components. Its listed products include bending, cutting, tube-bending, pipe-cutting, and end-forming machinery, while its legal/ownership description identifies a foreign joint venture.
CertificationsThe supplier explicitly states that it holds an ISO9001 quality-system certificate and a CE certificate; ISO9001:2008 is specifically listed. These statements provide direct evidence of certification holdings, although no certificate validity dates or issuing details are provided.
After-Sales capabilityThe company states that it has a complete after-sales service system alongside quality-control capabilities. This is direct evidence of an established after-sales framework, but the slices do not provide service staffing, response times, spare-parts arrangements, or warranty terms.
Production capacityProduction capability is supported by an 18,000 m² plant, eight production lines, approximately 148–150 employees, reported annual capacity of 600 bending machines and 6,000 cutting machines, and an off-peak lead time within 15 working days. The supplier also lists dedicated QA/QC personnel and a broad equipment range, indicating substantial manufacturing capacity.