SourcingAI
Try for free
Powered by Made-in-China.com
Multilayer Sandwich Running Track System 13mm Thickness
US$18.00
800-999 Square Meters
US$10.00
1,000+ Square Meters
Sample price:US$80.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

5-8

Warranty

5-8

Model NO.

13mm Composite runway

Game

Athletics/Running/Training

Thickness

13mm

Shock Absorption Rate

>53%

Friction Factor

0.57

Pattern

Composite Type

Color

Classic Red

Installation Ways

Need for Craftsmanship

Vertical Deformation

Resistant to Deformation

Usage

Outdoor

Environmental Protection Level

Environmentally Friendly

Durable Years

More Than 5 Years

Feature

Waterproof

Material

Rubber

Function

Waterproof, Soundproof, Anti-Static

Scope of Application

Schools, Professional Sports Venues, Track and Fie

Transport Package

Bagged Granules/Drum Glue

Specification

Package by bucket/package by bags

Trademark

MASTER QIAO

Origin

Guangdong

HS Code

3918909000

Production Capacity

5000000sqm

Key features

Dual-layer composite construction
High-elasticity base + wear-resistant top layer
Excellent shock absorption protects athletes' joints
Superior energy return for enhanced running efficiency
Balanced permeability and moisture resistance
Adaptable to various sub-base conditions

Company profile

Hubei Jinbang New Materials Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceExperienced TeamSelf-branded
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 8 Years CertifiedNearest Port: Wuhan PortAverage Response Time: ≤2.17h

About Our Factory & Business Background

AddressN/a, Guangzhou, Guangdong, China
Plant Area21071.04 square meters
Number of Employees60
Registered Capital22,857,200 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity100㎡
Supply Chain Partners100

Our Production Capability & Technical Expertise

Main ProductsEPDM Rubber Granules, Artificial Grass, Prefabricated Athletic Track, Outdoor Padel Court, PVC Flooring
Production Lines2
Production MachinesAdhesive tape production line, Tufting machine, Polymerization stirring reactor, Storage tank
QA/QC inspectors3 people
Inspection Type for Finished ProductsRandom inspection(Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers10 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2010-12-14
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff9
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What is a "composite" running track, and how is it different from a breathable or full-solid track?
A:
Excellent question. A composite track features a dual-layer structure: Base layer (9-10mm): Porous rubber granules bound with PU adhesive, providing shock absorption and allowing vapor release. Top layer (3-4mm): Dense, fine EPDM granules mixed with high-strength PU, forming a wear-resistant, spike-proof surface.
Q:What sub-base preparation is required for installing a 13mm composite track?
A:
We recommend a stable asphalt or concrete base with a thickness of at least 80-100mm, properly compacted and cured. The base should have a slight slope (0.5%-1%) for drainage and must be clean, dry (moisture content <5%), and free from oil or loose particles. A primer coat is essential to ensure optimal adhesion between the base and the rubber layer.
Q:Does this 13mm composite track meet international athletic standards?
A:
Yes. When installed on a proper sub-base, our 13mm composite track meets World Athletics (IAAF) performance requirements for impact absorption (35-50%), vertical deformation (0.6-2.5mm), and skid resistance. It is suitable for official competitions, professional training, and educational institutions.
Q:What are the installation temperature and curing time requirements?
A:
deal installation conditions are 5 to 35 degrees with relative humidity below 80%. Avoid installation during rain, heavy fog, or strong winds. The surface typically cures within 24-48 hours, and the track can be fully opened for use after 7 days of proper curing. For cold climates, we recommend using winter-grade adhesive to extend the working time.
Q:How does the composite track perform in wet or rainy conditions?
A:
The porous base layer allows water to drain quickly through the system, while the dense top layer prevents water from penetrating deeper. This hybrid design ensures rapid drying (typically within 20-30 minutes after rain) and eliminates puddles, allowing athletes to resume training almost immediately after rainfall.

Send Inquiry

*To:Hubei Jinbang New Materials Co., Ltd.Hubei Jinbang New Materials Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Custom Athletic Running Track: Eco-Friendly Sandwich System Benefits
Made-in-China.com
Innovative Track System with SGS Certified Rubber Sandwich Material
Made-in-China.com