SourcingAI
Try for free
Powered by Made-in-China.com
Powerful Hydraulic Gyratory Crusher for Primary Crushing
US$500,000.00-1,000,000.00
1 Piece

Product profile

Customization

Available

Type

Gyratory Crusher

Motor Type

AC Motor

Model NO.

PX5485

Motor Power

630

Application

Mine

Materials

Rock&Ore

Outlet Size

150-300mm

Inlet Size

1400

Condition

New

Warranty

12 Months

After-sales Service

All Life

Transport Package

Export Standard

Specification

PX5845

Trademark

Kinglink

Origin

China

HS Code

84742090

Production Capacity

300

Key features

High Production Capacity: Output is more than twice that of jaw crushers with the same feed mouth width.
Low Power Consumption: Power consumption per ton of ore is 50% - 80% lower than that of jaw crushers.
Stable Operation: Light vibration and stable work require only 2-3 times the machine mass for foundation.
Direct Feeding Capability: Large rotary crusher can directly feed raw ore without needing an additional ore bin.
Easy Start Mechanism: Can be started without auxiliary tools like flywheels, even with full bin and load.
Long-term Cost Efficiency: Higher overall benefit in the long term despite higher initial cost compared to jaw crushers.
12 Months Warranty: Comprehensive warranty coverage for 12 months with all-life after-sales service.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2014-11-05Nearest Port: SHANGHAI PORT CHINAAverage Response Time: ≤3.34hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, DDP, CIP, CPT

AI-Powered supplier vetting

SummaryShanghai Kinglink Industry Co., Ltd. is identified as a China-based limited company and manufacturer/factory in Shanghai, although another record classifies its associated-company industry as wholesale and retail. The supplier holds CE and ISO9001:2015 certifications and reports documented procedures for service assessment, corrective actions, and complaint handling. It provides extensive customization and ODM services, has OEM experience with popular brands, and has exported for 10 years, with exports representing 51%–70% of total sales. Its limitations include no available SDK, no reported new products in the past year, no in-stock capability, no overseas warehouse or showroom, and no cooperation with Fortune 500 companies. Financial records are indicated for 2021–2023, but the provided data does not establish financial strength.
Supplier typeThe supplier is identified as a limited company named Shanghai Kinglink Industry Co., Ltd., located in Shanghai, China, and classified as a manufacturer/factory. However, the associated-company industry is also listed as wholesale and retail, so the exact operational balance between manufacturing and trading is not fully established.
CertificationsThe supplier reports passing the EU CE Certificate and lists CE product compliance certification together with an ISO9001:2015 management-system certificate. These records explicitly support compliance and quality-management certification.
After-Sales capabilityKinglink reports an efficient after-sales service team, a network covering more than 30 provinces in China, and documented procedures and records for service assessment, corrective and preventive actions, and customer complaints. This provides explicit evidence of structured after-sales support.
Customization capabilityKinglink explicitly provides customization from designs and samples, full, minor, and flexible customization, and also offers ODM services. These records demonstrate broad customization capability.

Product Q&A

Q:What is the warranty period?
A:
The product comes with a 12-month warranty.
Q:What is the after-sales service policy?
A:
We provide all-life after-sales service for the equipment.
Q:How does the production capacity compare to jaw crushers?
A:
The production capacity is more than twice that of jaw crushers with the same feed mouth width.
Q:Is power consumption lower than jaw crushers?
A:
Yes, power consumption per ton of ore is 50% - 80% lower than that of jaw crushers.
Q:What are the lead times for delivery?
A:
Peak season lead time is 1-3 months, while off-season lead time is one month.

Send Inquiry

*To:Shanghai Kinglink Industry Co., Ltd.Shanghai Kinglink Industry Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like