SourcingAI
Try for free
Powered by Made-in-China.com
Reliable Stable Performance Automatic Blowing-Filling-Capping Machine for Carbonated Drinks
US$15,000.00-75,000.00
1 Set

Product profile

Customization

Available

Type

Pet Combi Block

Automatic Grade

Automatic

Model NO.

PET Combi Block

Material Type

Liquid

Filling Valve Head

Multi-Head

Feed Cylinder Structure

Multi-Room Feeding

Dosing Device

Capacity Cup

Filling Principle

Pressure

Packaging Container Lifting Structure

Pneumatic Lifting

Structure

Rotary

Packaging

Bottle

Packaging Material

Plastic

Efficiency Increase

2% to 4%

Operating Cost Reduction

8% to 12%

Heating Energy Saving

20% to 30%

Exhaust Gas Recovery

Approx. 40% Pressure

Mold Changeover Time

75 Seconds Per Cavity

Supported Beverages

Water, Juice, CSD, Dairy

Drive Mechanism

Servo Synchronous Control

Bottle Transfer

Robotic Gripper Handling

Transport Package

International Standards

Specification

Standard Specifications or Customized

Trademark

KING MACHINE

Origin

Jiangsu, China

Production Capacity

1000sets Per Year

Key features

8-12% Operating Cost Reduction: Reduces line costs by eliminating air conveyors and recovering 40% blowing pressure.
20-30% Heating Energy Saving: Uses 7-10 section IR heating with real-time monitoring to prevent thermal deformation.
75-Second Mold Changeover: Special aluminum alloy molds allow SKU switching in just 75 seconds per cavity.
2-4% Efficiency Increase: Integrated blow-fill-cap system boosts overall line efficiency by eliminating bottlenecks.
24-Hour Pre-shipment Validation: Every unit undergoes continuous 24-hour testing to ensure 100% mechanical stability.
Global Rapid Commissioning: English-speaking teams installed over 1,000 lines in 150+ countries for quick startup.
Customized Machine Design: Full customization available for material, power, filling type, and bottle specifications.
1-Year Warranty & Lifetime Support: Includes 1-year quality guarantee with free spare parts and lifelong technical assistance.

Company profile

Zhangjiagang King Machine Tech Co., Ltd.
Overseas ServicesProduct CertificationHigh Repeat Buyers ChoiceExperienced Team
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 7 years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤3.66h

AI-Powered supplier vetting

SummaryKing Machine presents itself as a professional technical supplier with R&D, 3D design, customization, ODM, and OEM capabilities. It reports manufacturing capacity of 5,000–54,000 bottles per hour, approximately 150 employees, more than 1,000 production lines in operation, and exports to over 100 countries. The supplier has stated quality-management practices, product patents, inspection instructions, and after-sales procedures. However, supplier-management certification is listed as NIL, complaint handling and corrective/preventive-action procedures lack written records, and no SDK, overseas warehouse, or overseas showroom is available. Financial records are indicated for 2021–2023, but the provided slices do not establish financial strength. Customer repurchase, export, and brand-service claims support market experience, although specific customer cases are not identified.
Supplier typeThe supplier is identified as a professional technical supplier and a combined company, while the company nature is listed as a trading company. Its profile includes manufacturing, service, quality-control, and R&D capabilities, but the provided data does not resolve the relationship between its trading-company classification and reported production resources.
CertificationsThe supplier states that it implements a comprehensive quality management system and has obtained many patent certificates. However, supplier management system certification is explicitly listed as NIL, so no formal supplier-management certification is evidenced.
After-Sales capabilityKing Machine reports a complete after-sales service system and has procedures for customer complaints, but the complaint-handling procedure has no written records. It also has in-stock service capacity, while lacking overseas warehouses and overseas showrooms.
R&D capabilityThe supplier reports R&D capability, recent new-product development, ODM services, product patents, and 3D software design services. However, it explicitly lacks an available SDK, limiting evidence of software-development extensibility.
Production capacityReported production capacity is 5,000–54,000 bottles per hour, with approximately 150 employees, more than 1,000 production lines running, exports to over 100 countries, and valid manufacturing contracts with associated subcontractors. It also reports over 85% production-line efficiency and in-stock service capacity, supporting substantial production capability.
Customization capabilityThe supplier explicitly offers customization from samples, full customization, customization from designs, minor customization, and flexible customization. Its R&D profile also includes ODM and OEM services, indicating broad product adaptation and design-manufacturing support.
Client casesThe supplier states that it provides OEM services for well-known brands, exports to over 100 countries, operates more than 1,000 production lines, and has a 75% customer repurchase rate. These claims indicate customer and market experience, but no named customers or specific case details are provided.

Product Q&A

Q:When can I get engineers from you?
A:
After you finish preparation conditions (water, electricity, air supply, materials) and contact sales, we will dispatch an engineer within 15 days to install and train your staff.
Q:When can I get my machine after I paid?
A:
Production time is normally 30-60 days depending on the machine type. Shipping time varies based on your destination port.
Q:How to install my machines when it arrives and how much is the cost?
A:
We send engineers to install and train staff. The customer pays for round-trip air tickets, accommodation, and USD 150 per day per person.
Q:How long does installation take?
A:
Depending on the order, we send one or two engineers. Installation typically takes 10 to 25 days.
Q:What about spare parts?
A:
We include one year's worth of easy-wear spare parts with the machine. During the warranty period, we supply spare parts at our cost including delivery fees.

Send Inquiry

*To:Zhangjiagang King Machine Tech Co., Ltd.Zhangjiagang King Machine Tech Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like