SourcingAI
Try for free
Powered by Made-in-China.com
A234 Wpb DN400 Welded Ecc Reducer and Con Black Reducer,
US$10.00
1-49 Pieces
US$1.00
50+ Pieces

Product profile

Customization

Available

Type

Concentric

Material

Carbon Steel

Model NO.

WAN196

Technics

Forged

Standards

Asme B16.9

Customized

Non-Customized

Size

1/2" -72"

Wt

Sch10--Sch160

Connection

Welding

Certificate

ISO9001

Delivery Time

20-35 Days Ex Mill

Keyword

Carbon Steel Psl 2 Welded Ecc Reducer

Product Name

Pipe Fitting Reducer

Testing Way

TUV, BV, SGS, The Third Party Test

MOQ

1 PCS

Surface

Black Paint, Rust Oiled

Transport Package

Plastic Film,Wooden Cases ,Wooden Pallet,or on Cus

Specification

CE, TUV, API

Trademark

kingmetal

Origin

China

HS Code

730491000

Production Capacity

500tons Per Month

Key features

Wide Size Range: Seamless 1/2'-32', Welding 6'-60', DN15-DN1500, up to 200mm thickness.
Multiple Material Options: Carbon Steel, Alloy Steel, Stainless Steel, Low Temp, and High Performance Steel.
Global Standards Compliance: Meets ASME B16.9, GB/T, DIN, JIS, ISO, and other international standards.
Versatile Application: Used for fluid flow change, pump inlet cavitation prevention, and instrument connectors.
Flexible Customization: Supports customization from samples, designs, full or minor adjustments.
Rigorous Testing: Certified by TUV, BV, SGS, and third-party tests for quality assurance.
Low MOQ: Minimum Order Quantity is just 1 PCS, suitable for small batch needs.
Fast Delivery: Delivery time is 20-35 days ex mill, with off-season lead time within 15 days.

Company profile

Guangzhou Kingmetal Steel Industry Co., Ltd.
High Repeat Buyers ChoiceYears of Export ExperienceExhibition ExperienceImporters and Exporters
Business Type: Manufacturer/Factory, Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 13 years CertifiedNearest Port: Guangzhou Port, Shenzhen PortAverage Response Time: ≤3.40h

About Our Factory & Business Background

AddressRoom 703, Jinbi Lingxiu International Center, No. 3 North Junya Street, Guangzhou, China
Terms of PaymentLC, T/T, D/P, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month, 1-3 months Off Season Lead Time: within 15 workdays, one month
Supply Chain Partners200

Our Production Capability & Technical Expertise

Main ProductsSteel Pipes, Pipes Fittings, Socket Fittings, Flange, Angle Bar, C Chanel, Steel Coils, Steel Plate, Valves, Grooved Fittings
R&D Engineers3 people

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa
Number of Foreign Trading Staff10
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Product Q&A

Q:What is the difference between concentric and eccentric reducers?
A:
Concentric reducers are used on vertical pipes, while eccentric reducers are used for horizontal pipes.
Q:What materials are available for the pipe reducer?
A:
Available materials include Carbon Steel (A234 WPB-WPC), Alloy Steel, Stainless Steel (304, 316, etc.), Low Temperature Steel, and High Performance Steel.
Q:What are the size and thickness specifications?
A:
Seamless: 1/2'-32' (DN15-DN800); Welding: 6'-60' (DN150-DN1500). Wall thickness ranges from 4mm to 200mm.
Q:What standards does the product comply with?
A:
It complies with ASME B16.9, GB/T12459, DIN2616, JIS B2311, ISO3419, and many other international standards.
Q:What is the minimum order quantity (MOQ)?
A:
The MOQ is 1 PCS.

Send Inquiry

*To:Guangzhou Kingmetal Steel Industry Co., Ltd.Guangzhou Kingmetal Steel Industry Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

GOST 17378-2001 CT20 Carbon Steel Con & Ecc Reducer
Made-in-China.com