Powered by Made-in-China.com
Concrete Steel Formwork Building Material for Construction Factory Direct Sale
US$80.00
100-499 Square Meters
US$65.00
500-999 Square Meters
US$45.00
1,000+ Square Meters
Product profile
Customization
AvailableCertification
ISOMaterial
SteelModel NO.
High-Strength Alloy Steel FormworkType
Wall FormworkSurface
Painted,GalvanizedThickness
According to DesignApplication
Slab/Beam/Wall/ColumnTransport Package
Standard PackageSpecification
Variety of sizes according to project drawingTrademark
KITSENOrigin
ChinaProduction Capacity
200 Twenty-Foot Containers/MonthKey features
High Strength Material: Made of Q700 high-strength alloy steel for superior load-bearing capacity.
Customizable Design: Thickness and surface (Painted/Galvanized) customized according to project drawings.
Smooth Surface Quality: Precision-machined surface ensures smooth concrete molding and reduces repair work.
Versatile Application: Suitable for high-rise buildings, bridges, tunnels, and complex environments.
OEM/ODM Service: Supports full customization from designs or samples with flexible options.
ISO Certified Quality: Manufactured under ISO9001:2015 with 100% finished product inspection.
Factory Direct Sale: Direct from manufacturer with 10 production lines and 421 employees.
Global Export Experience: Exporting since 1995 to North America, Europe, Asia, and Africa.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Export Year: 1995-03-07 CertifiedNearest Port: Shenzhen PortAverage Response Time: ≤24h
About Our Factory & Business Background
AddressKitsen Industrial Park, Beiguan Town, Yangdong, Yangjiang, Guangdong, China
Plant Area36617.8 square meters
Number of Employees421
Registered Capital30,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)EXW, CFR, FOB, CIF
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsRinglock Scaffolding, Formwork, Aluminum Scaffolding, Self Climbing Platform, Concrete Formwork
Production Lines10
Production MachinesAutomatic Welding Machine, Lathe, Punching Machine, Punching Machine, Spray Painting Line, Testing Platform, Testing Platform, Testing Platform, Welding Machine
QA/QC inspectors14 people
Inspection Type for Finished Products100% inspection(Function inspection & Visual inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers36 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2009-07-07
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia
Number of Foreign Trading Staff40
Overseas Agent/BranchYes
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015
Product Q&A
Q:What is the material specification of the formwork?
A:
The formwork is made of Q700 high-strength alloy steel, offering significantly higher strength and load-bearing capacity than ordinary steel.
Q:Can the formwork be customized for specific projects?
A:
Yes, we offer flexible customization including thickness according to design, surface treatment (Painted or Galvanized), and full customization from drawings or samples.
Q:What are the main advantages of this steel formwork?
A:
Key advantages include high strength, high load-bearing capacity, smooth surface for better concrete quality, and adaptability to complex environments like high temperatures or humidity.
Q:What is the lead time for production?
A:
The average lead time is one month for both peak season and off-season.
Q:Does the manufacturer provide OEM or ODM services?
A:
Yes, we provide both OEM and ODM services, allowing for customization from designs or samples.
Send Inquiry
*To:
Kitsen Technologies Co., Ltd.
Kitsen Technologies Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Quick Release Concrete Formwork System Shoring Beam Steel Building Material
US$99.00-299.00
10 Pieces(MOQ)
Hot Sale Zulin Different Width Concrete Form Construction Formwork Price Material Lifting
US$6,000.00-7,000.00
4 Sets(MOQ)
Steel Scaffold Ground Steel Beam Beam Formwork Building Material
US$41.00-47.00
1 Piece(MOQ)
Customized Steel Different Width Zulin Concrete Form Construction Formwork Price Material Lifting
US$6,000.00-7,000.00
4 Sets(MOQ)
Aluminum Prop Building Material for Concrete Formwork
US$100.00
500 Pieces(MOQ)
Steel Formwork Building Material for Primary Integral Lifting Scaffold Frames
US$100.00-150.00
100 Pieces(MOQ)
HDG Scaffolding Construction Steel Beam Waler Beam Building Material
US$41.00-45.00
1 Piece(MOQ)
Zulin Different Width Concrete Form Construction Formwork Material Lifting
US$6,000.00-7,000.00
4 Sets(MOQ)
Building Materials Vigas H20 for Construction
US$6.00-15.00
500 Meters(MOQ)
ISO Formwork and Scaffolding Steel Best System Building Materials
US$99.00-161.00
1 Piece(MOQ)
Across Floors Zulin Concrete Form Construction Formwork Material Lifting with Good Price
US$6,000.00-7,000.00
4 Sets(MOQ)
Eco-Friendly Formwork System - Recyclable Material for Green Construction Hot Sell
US$13.70-37.80
50 Piece(MOQ)
Construction Plastic Concrete Building Materials
US$22.00-29.00
100 Pieces(MOQ)
Plastic Building Material for The Engineering Construction
US$40.00-50.00
100 Square Meters(MOQ)
Building and Construction Materials Equipment Green Concrete Floor Wall Pillar Mould Formworksystems with Accessories
US$79.00-109.00
500 Pieces(MOQ)



















