Powered by Made-in-China.com

Lightweight Panel Beam Prop Formwork with Revolutionary Early Stripping Function
US$1.00-9,999.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
Online Technical SupportWarranty
24-Hour Online ServiceCertification
ISOMaterial
AluminumType
Stair FormworkPlace of Origin.
ChinaMinimum Order Quantity
ContainersProduct Name
Aluminum Filling FormworkMaterial.
AluminumTransport Package
BoxTrademark
KitsenOrigin
ChinaKey features
Revolutionary Early Stripping: Removes formwork significantly earlier than traditional methods without affecting structural integrity.
Lightweight Panel-Beam-Prop System: Reduces construction time and saves costs with innovative slab formwork design.
24-Hour Online Support: Provides continuous technical assistance and warranty service for all customers.
ISO Certified Quality: Manufactured under ISO9001:2015 standards with 100% finished product inspection.
Flexible Customization Options: Offers full, minor, and design-based customization to meet specific project needs.
Aluminum Material Construction: Durable and lightweight aluminum formwork ensures high performance and longevity.
Fast Stock Availability: Formwork and scaffolding systems available in warehouse with 20-25 day loading prep.
Multiple Patent Protection: Holds patents in France, Germany, and China for formwork and scaffolding technology.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Export Year: 1995-03-07 CertifiedNearest Port: Shenzhen PortAverage Response Time: ≤24h
About Our Factory & Business Background
AddressKitsen Industrial Park, Beiguan Town, Yangdong, Yangjiang, Guangdong, China
Plant Area36617.8 square meters
Number of Employees421
Registered Capital30,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)EXW, CFR, FOB, CIF
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsRinglock Scaffolding, Formwork, Aluminum Scaffolding, Self Climbing Platform, Concrete Formwork
Production Lines10
Production MachinesAutomatic Welding Machine, Lathe, Punching Machine, Punching Machine, Spray Painting Line, Testing Platform, Testing Platform, Testing Platform, Welding Machine
QA/QC inspectors14 people
Inspection Type for Finished Products100% inspection(Function inspection & Visual inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers36 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2009-07-07
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia
Number of Foreign Trading Staff40
Overseas Agent/BranchYes
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015
Product Q&A
Q:How to get a quotation?
A:
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:What is the lead time?
A:
For Formwork, self-climbing platform, Scaffolding, Shoring we have stock in our warehouse. The preparation of loading will be within 20 to 25 days. For other systems, the lead time is from 30 to 45 days. For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.
Send Inquiry
*To:
Kitsen Technologies Co., Ltd.
Kitsen Technologies Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
China GF Aluminum Scaffolding Props Details Panel Early Stripping Formwork with CE in
US$80.00-120.00
999 Square Meters(MOQ)
Lightweight Slab Formwork with Aluminum Panel Filler Beam Truss Construction
US$1.00-9,999.00
1 Piece(MOQ)
Greenformwork OEM Custom Early Stripping Aluminum Frame Slab Formwork with Drop Head Steel Prop Reusable Low-Carbon Panel for Concrete Building
US$80.00-150.00
300 Square Meters(MOQ)
Lightweight Aluminum Alloy Formwork Panel for Beam-Less Structure with Adjustable Steel Prop and Drop Hea Easy to Install
US$80.00-150.00
300 Square Meters(MOQ)
China Lianggong Skydeck Steel Frame Dropped Head Slab Formwork T-Form for Slab, Floor and Beam Construction with Early Stripping Head
US$44.00-50.00
300 Square Meters(MOQ)
Green Formwork with Invention Patent with Panel-Prop Early Stripping System
US$100.00
500 Pieces(MOQ)
Quick Early Stripping Slab Formwork with Three Basic Components Panel Crown Prop
US$1.00-9,999.00
1 Piece(MOQ)
Green Formwork-Slab Early Stripping Formwork Panel Props with Early Stripping Head Infill Beam Approved Construction
Negotiable
1,000 Square Meters(MOQ)
Hot Green Formwork-Slab Formwork Slab Formwork Early Stripping Formwork Panel; Props with Early Stripping Head; Infill Beam Approved
US$80.00-120.00
999 Square Meters(MOQ)
Green Formwork Steel Panel-Prop Formwork System with Early Stripping Mechanism
Negotiable
1,000 Square Meters(MOQ)
Advanced Panel -Prop Formwork System with Early Stripping Process
US$100.00
500 Pieces(MOQ)
Formwork System with Panel&Prop Early Stripping
US$100.00
500 Pieces(MOQ)
Early Stripping Form with Steel Plywood Plastic Metal Formwork Panel for Slab Ceiling Concrete Mould Construction
US$90.00-100.00
300 Square Meters(MOQ)
China Lightweight Skydeck Aluminium Table Formwork with Plywood Props Modular Panel for Concrete Construction
US$100.00-200.00
100 Square Meters(MOQ)
Early Stripping Slab Formwork Green Panel and Adjustable Prop System
US$80.00-125.00
100 Square Meters(MOQ)
Concrete Early-Stripping High-Strength Light Aluminum Slab Formwork with High-Reuse HDG Filler Beam
US$100.00-120.00
500 Square Meters(MOQ)
Early Stripping Formwork with Steel Plywood Plastic Metal Shuttering Panel for Slab Ceiling Concrete Mould Construction
US$90.00-100.00
300 Square Meters(MOQ)
Adto Construction 6061-T6 Aluminum Formwork System Forms Column Shuttering Wall Slab Beam Panel Concrete Forms Early Stripping Formwork
US$120.00-130.00
1,000 Square Meters(MOQ)



















