Powered by Made-in-China.com
Internal Combustion Engine Exhaust Gas Heat Recovery Boiler Power Generation System
US$30,000.00-150,000.00
1 Piece
Product profile
Customization
AvailableFunction
Steam BoilersFuel
Waste HeatModel NO.
KNFTInstallation
Packaged BoilerStructure
Water TubeMedia
SteamWater Circulation
Forced CirculationDrum Placement
Vertical BoilerPressure
Low PressureManufacturing Level
ABurning Style
Chamber Combustion BoilerUsage
Industrial, Power StationTransport Package
Standard Export PackageTrademark
KainengOrigin
ChinaHS Code
8402120090Production Capacity
1000 Sets /YearKey features
High Heat Transfer Efficiency: Welding fusion rate up to 95% with low contact resistance for superior performance.
H Finned Tube Design: Zigzag structure extends heating area 37% more than spiral pipes in same space.
Compact and Lightweight: Small size and light weight design with strong turbulence for reduced soot.
Customization Available: Full customization from designs and OEM/ODM services available.
Long Working Life: Safe, reliable features with simply maintenance and durable construction.
Low Flow Resistance: Optimized design reduces dust accumulation and wear and tear.
24/7 Online Support: Close contact during production to ensure on-time delivery.
Free Maintenance: One year free maintenance and repair plus lifelong service support.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization CertifiedExport Year: 25 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤3.48h
AI-Powered supplier vetting
SummaryKaineng is an established manufacturer of pin tubes, H-finned tube heat-transfer components, exhaust gas boilers, and related energy-saving and environmental-protection equipment. It reports more than 25 years of export experience, over 200 employees including 50 engineers, a 73,000 m² factory, and more than 300 production equipment units. The supplier holds ISO9001, ISO14001, ISO45001, CE, and multiple classification-society approvals, and reports cooperation with Fortune 500 companies. It provides OEM, ODM, design-based customization, and full customization, but reported no new products during the past year. Production evidence is substantial, although the absence of a valid manufacturing contract with related subcontractors is a documented weakness. After-sales procedures and complaint-handling records are established, while overseas warehouse and showroom capabilities are unavailable. Financial credibility cannot be assessed because the provided financial fields contain only years rather than...
Supplier typeThe supplier is a specialized industrial manufacturer producing pin tubes, H-finned tubes, exhaust gas boilers, and related equipment. It also provides OEM, ODM, design-based customization, and full customization services, indicating a manufacturer with integrated design and production offerings rather than a trading-only profile.
CertificationsThe supplier reports ISO9001, ISO14001, and ISO45001 management-system certifications, CE product compliance certification, and approvals from ABS, BV, CCS, DNV, and LR. It also reports an environmental impact assessment and regular fire drills, providing explicit evidence of quality, environmental, occupational-safety, and product-compliance controls.
After-Sales capabilityClear procedures and followed records are reported for corrective and preventive actions, customer complaint handling, supplier-service assessment, and approved-supplier management. However, the supplier has no overseas warehouse or overseas showroom, so its documented service infrastructure is stronger in process control than in overseas physical support.
Production capacityProduction resources include a 73,000 m² factory, more than 300 production equipment units, 10 pin-tube welding lines, 12 H-finned-tube welding lines, and multiple processing machines. The supplier also reports in-stock capability and standardized finished-product inspection. A deficiency is that no valid contract exists between the factory and related subcontractors, creating a documented manufacturing-governance weakness.
Customization capabilityThe supplier explicitly provides customization from customer designs and full customization, and also offers ODM services. These statements directly demonstrate the ability to support both design-based and more extensive customized product requirements.
Client casesThe supplier reports providing OEM services to well-known brands, collaborating with Fortune 500 companies, and holding one national science and technology progress award. These are explicit customer and recognition indicators, although the provided information does not identify the companies, projects, or award details.
Product Q&A
Q:What is the warranty period?
A:
We provide free maintenance and repair for one year and offer lifelong service.
Q:Can the boiler be customized?
A:
Yes, we offer full customization from designs, along with OEM and ODM services.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 set.
Q:What are the payment terms?
A:
We accept LC and T/T as terms of payment.
Q:How long is the lead time?
A:
Lead time is one month in off-season and 1-3 months during peak season.
Send Inquiry
*To:
Qingdao Kaineng Environmental Protection Technology Co., Ltd
Qingdao Kaineng Environmental Protection Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Enerrgy Saving Boiler Gas Turbine Waste Heat Recovey Power Generation System
US$50,000.00-100,000.00
1 Piece(MOQ)
30MW 40MW Gas Turbine Exhaust Gas Waste Heat Recovery Steam Generation Boiler System
US$50,000.00-100,000.00
1 Piece(MOQ)
Continuous Stable Heat Vertical Environmental Gas Winery System
US$20,000.00
1 Piece(MOQ)
100MW~200MW Hfo Power Plant Vertical Hrsg Waste Heat Recovery Boiler System
US$20,000.00-50,000.00
1 Piece(MOQ)
Waste Heat Recovery System Whrb for 40MW~200MW Hfo Engines Combined Cycle Power Plant
US$50,000.00-100,000.00
1 Piece(MOQ)
Natural Gas Boiler Multi Safety Protection System
US$20,000.00
1 Piece(MOQ)
Advanced Greenhouse Gas Humidification System for Optimal Growth
US$20,000.00
1 Piece(MOQ)
Versatile Heating Boiler System with Efficient Medium Outlet Temperature
US$48,000.00-49,000.00
1 Piece(MOQ)
Advanced Silent Combustion Vertical Gas Mushroom Spawn System
US$20,000.00
1 set(MOQ)
Diesel Fired Thermic Fluid Boiler System for Bitumen Plant
US$300,000.00
1 Piece(MOQ)
Engine Waste Heat Recovery System for Gas Generator Set Hot Water & Steam CHP Cogeneration 500kw
US$11,800.00
1 Piece(MOQ)
450m² of Rotary Kiln with Full-Loop Cooling System for Waste Heat Recovery and Multi-Stage Utilization, Zero-Emission Treatment of Exhaust Gas Project
US$1,000,000.00-5,000,000.00
1 Piece(MOQ)
Custom Built Industrial Boiler Systems for Pharmaceutical Factories
US$799.00
1 Unit(MOQ)
High Quality Low Consumption Power Generation System for Blast Furnaces
US$1,400,000.00-5,000,000.00
1 Piece(MOQ)
Vertical Biomass Fired Thermal Oil Heater System
US$18,000.00
1 Piece(MOQ)
Efficient Burnham Steam Boiler I - Ntj Industrial Hot Water Boiler System
US$999.00
1 Piece(MOQ)
Reliable EPS Production Definition 500kg Gas Oil Boiler System
US$3,000.00-15,000.00
1 Set(MOQ)
High-Efficiency 12 Million Kcal Heat Transfer System for Asphalt
US$1,500.00-5,000.00
1 Set(MOQ)
Cost Effective Pressure Resistant Power Generation System for Metallurgy Firms
US$1,400,000.00-5,000,000.00
1 Piece(MOQ)
Best Selling Environmental Friendly Whr Power Generation System for Chemical Factories
US$1,400,000.00-5,000,000.00
1 Piece(MOQ)



















