Powered by Made-in-China.com
Quick Assembly PP Hollow Formwork for Short Construction Schedule with CE ISO Certification and Easy Connection
US$15.00-28.00
1 Piece
Sample price:US$15.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online Technical Support, on-Site Inspection, FreeWarranty
1 YearModel NO.
PP Hollow Formwork-01Certification
ISO, CEMaterial
PPType
Plastic Formwork / Hollow Building FormworkReuse Times
100-300 CyclesFeature
Waterproof,Anti-Corrosion,Light WeightSurface
Smooth, Fair-Faced ConcreteProcessing
Can Be Cut, Drilled, NailedApplication
Concrete Construction FormworkTransport Package
Pallet or Woven Bag PackingSpecification
Custom sizes availableTrademark
KuanhongOrigin
Shandong, ChinaProduction Capacity
10000pieces/YearKey features
Light-weight, easy transportation and on-site handling.
100-300 times reusable, greatly cut comprehensive construction cost.
Waterproof, no water absorption, no swelling or delamination.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 0.2 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h
About Our Factory & Business Background
AddressNo.308, Bohong Mansion, East Xinhuan Road, Zhangdian District, Zibo 255000, Shandong, P.R.China
Plant Area59783 square meters
Number of Employees86
Registered Capital5,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners3
Our Production Capability & Technical Expertise
Main ProductsPP Hollow Board, Plastic Formwork, Commercial Plywood, Decorative Base Paper
Production Lines5
Production MachinesProduct processing line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers2 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2026-06-15
Main MarketsDomestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:Are you a trading company or manufacturer?
A:
We are a manufacturer and trading company.
Q:How long is your delivery time?
A:
Generally it is 3-5 days if the goods are in stock, or it is according to your order quantity.
Q:Is a sample available?
A:
Yes. We can provide the free sample but the freight is in the receiver's account.
Q:What are your terms of payment?
A:
T/T (Telegraphic Transfer): 30% paid as the deposit, balance against the Shipping.
Q:What is the warranty period for the formwork?
A:
We provide a 1-year warranty for our products.
Send Inquiry
*To:Shandong Kuanhong New Materials Co., Ltd.
*Content:
Supplier replies will be sent to your registered email
You may also like
Lianggong Reusable Quick Assembly Wall Column Steel Aluminum Frame Formwork for Construction
US$65.00-69.00
300 Square Meters(MOQ)
Modern Design Waterproof Hollow PP Plastic Formwork Panels Concrete Shuttering PVC Plywood Sheet for Construction
US$16.50-23.50
200 Pieces(MOQ)
Consmos Hollow PP Plastic Sheet Formwork PVC Shuttering Board Concrete Formwork for Construction
US$16.50-23.50
200 Pieces(MOQ)
Quick Assemble Durable Formwork for Wall Construction with Technical Support
US$1,200.00-1,500.00
20 Tons(MOQ)
Reuse 100 Times Hollow Plastic Concrete PP Construction Formwork Panel for Slab Wall Column
US$99.00-130.00
4,999 Pieces(MOQ)
Durable Adjustable Concrete Construction Steel Slab Formwork for Quick Assembly and Versatile Use
US$900.00-1,300.00
10 Tons(MOQ)
Quick Assembly H20 Timber Beam Formwork Solutions Table Formwork for Durable Slab and Beam Construction
US$70.00-80.00
300 Square Meters(MOQ)
Hot GF Aluminum Price Quick Release Slab Panel Concrete Construction Formwork with CE
US$80.00-120.00
999 Square Meters(MOQ)
Hot GF Slab Panel Concrete Construction Table Form Quick Release Formwork with CE
US$80.00-120.00
999 Square Meters(MOQ)
Hot Patent Certificate GF Scaffold Construction Material Quick Release Flatslab Formwork with CE
US$80.00-120.00
999 Square Meters(MOQ)
Comaccord Hollow PP Round Holes Concrete Slab 20mm Plastic Formwork for Construction Site
US$36.70
972 Pieces(MOQ)
Comaccord Hollow PP Concrete Plastic Plywood Slab Formwork for Construction 80-100 Times
US$35.28
800 Pieces(MOQ)
Quick Assembly OEM ODM Custom Steel Frame Green Formwork for Industrial Construction
US$80.00-150.00
300 Square Meters(MOQ)



















