SourcingAI
Try for free
Powered by Made-in-China.com
Act 220/440V 100kw Dummy Load Bank for Generator Testing
US$3,500.00
1 Piece

Product specifications

Power

Product profile

Customization

Available

After-sales Service

3months-1year

Application

Electrical & Electronics

Model NO.

220/440V 100kW

Power Factor

1

Workplace

Indoor

Voltage

220V 440V

Max Load Power

100kw

Customized Support

OEM

Key Word

Load

Function

Generator Testing

Frequency

50/60Hz

Specification

About 40kg

Trademark

Triumph Load

Origin

China

Key features

Dual Voltage Support: Supports 220V and 440V AC three-phase three-wire systems with 50/60Hz frequency.
Portable Design: Compact size (666x292x597mm) and light weight (40kg) with fork lift pocket and castors.
Multi-Mode Control: Supports manual control panel, remote controller box, and PC software programmable control.
Comprehensive Protection: Features overload, overheat, short circuit protection, and emergency stop switch for safety.
Customizable Options: Offers OEM support, custom paint colors, stainless steel casings, and tailored technical solutions.
Certified Quality: Certified with ISO9001:2008 and CCS, backed by 10 patents and independent R&D technology.
Versatile Applications: Ideal for generator testing, shipbuilding, data centers, and offshore platform commissioning.

Company profile

Hebei Kaixiang Electrical Technology Co., Ltd.
Importers and ExportersYears of Export ExperienceExperienced TeamExhibition Experience
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤6.35h

About Our Factory & Business Background

AddressNo79 Wangshan Road,Luquan District, Shijiazhuang, Hebei, China
Plant Area25681 square meters
Number of Employees193
Registered Capital65,205,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners21

Our Production Capability & Technical Expertise

Main ProductsPortable Load Bank, Load Banks, Battery Discharger, AC Load Bank, DC Load Bank, Resistive Load Bank, Generator Load Bank, Reactive Load Bank, High Voltage Load Bank, Dummy Load
Production Lines4
Production MachinesAssembly Production Line, CNC Engraving Machine, Laser Engraving Machine, Punching Machine, Movable Universal Radial Drilling Machine, CNC Hydraulic Bending Machine, Multi-Station Busbar Machine, Automatic Wire Stripper, Mute Terminal Machine, Automatic Computer Strip Machine, Laser Marking Machine, Steel Plate Shearer, High Power Resistance Parameter Tester, Three Table Calibrator, Voltage-Stabilized Source, High-low Temperature Test Chamber, Salt Spray Test Chamber, Generator, Portable Power, Medium-frequency Power Supply
QA/QC inspectors13 people
Inspection Type for Finished Products100% inspection(Function inspection & Visual inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers6 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2005-01-11
Main MarketsEurope, Southeast Asia/ Mideast, Australia
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff14
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What is the maximum load power of this dummy load bank?
A:
The maximum load power is 100kW, with 5 adjustable steps: 5, 10, 20, 25, and 40kW.
Q:What voltage and frequency options are available?
A:
It supports AC three-phase three-wire 220/440V with 50Hz or 60Hz frequency options.
Q:Can this load bank be customized?
A:
Yes, we offer OEM support, custom paint colors, stainless steel casings, and tailored technical solutions.
Q:What is the minimum order quantity (MOQ)?
A:
The minimum order quantity is 1 Set.
Q:What is the lead time for production?
A:
Peak season lead time is one month, while off-season lead time is within 15 workdays.

Send Inquiry

*To:Hebei Kaixiang Electrical Technology Co., Ltd.Hebei Kaixiang Electrical Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

AC440V 700kw Load Bank for Generator Testing
Made-in-China.com
AC 450V 3000kw Load Bank for Generator Set Testing

AC 450V 3000kw Load Bank for Generator Set Testing

US$150,000.00-250,000.00
1 Piece(MOQ)
Made-in-China.com
500kw-1000kw Load Bank Generator Testing Customized

500kw-1000kw Load Bank Generator Testing Customized

US$15,000.00-25,000.00
1 Piece(MOQ)
Made-in-China.com