SourcingAI
Try for free
Powered by Made-in-China.com
Plastic Soft PE HDPE Pipe Corrugated Hose Tube Winder for Making Coil Machine
US$4,000.00-8,000.00
1 Set

Product profile

Customization

Available

Warranty

2 Years

Product Type

PE Pipe

Model NO.

LB-63

Screw No.

Multi-screw

Automation

Automatic

Computerized

Computerized

Certification

CE, ISO9001:2008

Customized

Customized

Condition

New

After-sales Service

Engineer Commssion The Machine at Site.

Electrical Components

Siemens

Motor

Torque or Servo Motor

Coiling Range

16-160mm

Packing

Film or Wooden Box

Final Product

HDPE Pipe in Roll

Transport Package

Exported Standard Package.

Specification

4500*2450*2700

Trademark

LANGBO

Origin

China

HS Code

84778000

Production Capacity

! 5 Sets Per Month

Key features

Fully Automatic Operation: Automated coiling process saves manpower and ensures evenly tied pipe rolls.
Wide Diameter Compatibility: Suitable for HDPE/LDPE/PERT pipes ranging from 16mm to 160mm in diameter.
Solid Frame & Servo Drive: Features a strong frame with servo or torque motor for stable and efficient performance.
CE and ISO9001 Certified: Machines meet international safety and quality standards with CE and ISO9001:2008 certifications.
Customizable Configuration: Options for electrical components, motors, coiling range, and packing methods are available.
Overseas Installation Support: Engineers are available to provide installation and commissioning services at your site.
Energy Efficient Design: Lower powder consumption and stable performance ensure long-term value and efficiency.
Convenient Transportation: Coiled pipe rolls are easy to handle and transport, reducing logistics complexity.

Company profile

ZHANGJIAGANG LANGBO MACHINERY CO., LTD.
Importers and ExportersHigh Repeat Buyers ChoiceYears of Export Experience
Business Type: Manufacturer/Factory, Group Corporation CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.91h

About Our Factory & Business Background

AddressNo. 2 Changshu Road, Changyinsha town, Zhangjiagang, Suzhou, Jiangsu, China.
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 set
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsPVC/HDPE/PP-R Pipe Extrusion Line, PVC Profile/ WPC Profile Extrusion Line, PVC/PE/PPR Granulating Line., PE Pipe Coiler Machine, PVC/PP Pipe Belling Machine, PVC Pipe Slotting Machine, PVC Pipe Threading Machine, PC LED Light Cover Extrusion Line, Mixer Combination, Crusher and Shredder Machine
Production Lines3
Production MachinesAssembly Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Main MarketsSoutheast Asia/ Mideast
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Product Q&A

Q:Are you a trading company or factory?
A:
We are a factory that produces machines for customers directly.
Q:Can I visit your factory?
A:
Yes, our production plant can be visited at any time. We are in Zhangjiagang, Jiangsu Province, close to Shanghai and Wuxi. Pick-up service is available if you are near us.
Q:Is the shipping cost included in the quotation?
A:
Usually, our quotation contains FOB Shanghai as a shipment condition. This means the shipping cost between the delivery and destination ports will not be included. Langbo can help customers get the latest shipping price.
Q:Do you have CE Certification?
A:
Yes. Both our extrusion machine and plastic recycling machine have CE Certification.
Q:What is the delivery time?
A:
Usually 45 days. Depending on the certain project, the exact delivery time will be written on the contract.

Send Inquiry

*To:ZHANGJIAGANG LANGBO MACHINERY CO., LTD.ZHANGJIAGANG LANGBO MACHINERY CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

16-32mm Automatic Pipe Winder for HDPE Pipe Making Line
Made-in-China.com
Plastic Winder for Soft PVC PE PPR Pipe

Plastic Winder for Soft PVC PE PPR Pipe

US$3,000.00-7,000.00
1 Piece(MOQ)
Made-in-China.com
Double Disk Pipe Winder for PE HDPE Pipe

Double Disk Pipe Winder for PE HDPE Pipe

US$3,000.00-7,000.00
1 Piece(MOQ)
Made-in-China.com
Automatic Double Disk Winder for HDPE PPR LDPE Pipe
Made-in-China.com
HDPE PPR LDPE Plastic Pipe Winder with Double Disk
Made-in-China.com
Servo Type Plastic Pipe Hose Double Disc Winder
Made-in-China.com
Double Two Disk 16/20/32/50/63mm PVC PPR PE Hose Winder
Made-in-China.com