SourcingAI
Try for free
Powered by Made-in-China.com
Fast Speed Suspension E Scooter for off Road Riding with APP
US$225.00
1-199 Pieces
US$219.00
200-999 Pieces
US$212.00
1,000-9,999 Pieces
US$205.00
10,000-49,999 Pieces
US$199.00
50,000+ Pieces
Sample price:US$300.00/piece.Request sample

Product profile

Customization

Available

Wheels

2 Wheels

Battery Type

Lithium Battery

Model NO.

T4

Certification

ISO9001, EN15194, CE, BSCI, RoHS, En14619 Abe (Ekfv) FCC Weee

Frame Material

Aluminum Alloy

Foldable

Foldable

Model No.

T4

Motor

48V 600W-1200W

Battery

48V 12.5ah-17.5ah

Tire

10'' Tubeless Tire

Suspension

Front+Rear

Display

LED Display

Light

Front Bottom Light + Rear Brake Light + Side

Brake

Dual Disc Brake

Fold Function

Foldable

Max Speed

25km/H (40km/H Unlocked Speed)

Max Loading

120 Kg

Waterproof

IP54

Charger

1.5A-2A

Charging Time

About 6-8h

Scooter Size

117X25X55 Cm

Transport Package

100% Packed

Trademark

Maxwheel

Origin

China

HS Code

8711600010

Production Capacity

60000PCS Per Week

Key features

High Speed & Long Range: Max speed 40km/h unlocked, range up to 65km with 48V18Ah battery.
Dual Motor Off-Road Power: Up to 1000W dual motor with 10-inch tubeless tires for all terrains.
Advanced Suspension System: Front and rear shock suspension with 2 or 4 front options for T4.
Full Customization Support: ODM & OEM available for almost all parts including model and battery.
Global Certifications: ISO9001, BSCI, CE, RoHS, FCC, ABE, TUV, SGS, and EN14619 certified.
High Production Capacity: 50,000 pieces per week capacity with 6 production lines.
IP54 Waterproof Design: Waterproof rating IP54 ensures durability in various weather conditions.
Fast Overseas Delivery: Stock available in EU warehouse with 3-10 days normal delivery.

Company profile

Wuyi Jinyue Engine Science and Technology Co., Ltd.
Cooperated with Fortune 500Quality AssuranceR&D CapabilitiesManagement Certification
Business Type: Manufacturer/FactoryExport Year: 2005-07-20Nearest Port: Ningbo, ZhapuAverage Response Time: ≤5.81hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, DAP, Others, FCA

AI-Powered supplier vetting

SummaryThe supplier is a professional technique provider with a strong market presence in Europe and the USA. It offers extensive customization options but lacks overseas warehouse and showroom capabilities. It holds significant certifications, ensuring quality assurance but shows limited innovation with no new products in the past year. Financial data is confidential, and it does not provide 3D software design services. Its production capability is robust, with a large output of electric scooters annually and a high export percentage.
Supplier typeThe supplier is identified as a professional technique provider and occupies a significant share of the European and USA markets.
CertificationsThe supplier holds ISO9001, SGS, BSCI certifications, and has passed the TUV audit. They also have UL2272, CE, RoHS, and ABE certifications.
R&D capabilityThe supplier has not introduced new products in the past year and does not offer SDK for R&D.
Production capacityThe supplier operates more than 10 production lines with an annual output of 500,000 pieces, indicating strong production capacity.
Customization capabilityIt provides extensive customization options including full and minor customization from samples and designs.
Client casesWalmart in Europe and Target in the USA are notable customers, indicating a strong customer base and trust.

Product Q&A

Q:How do you guarantee quality?
A:
Top electric parts suppliers cooperation, 16 years experience on e-scooters, always a pre-production sample before mass production; Third party inspection before packing.
Q:What advantages do you have compared to other suppliers?
A:
Self-production for metal parts(frame, folding tube, stem, etc.) BEST QUALITITY in this price range, we carry out the controls and manages of ISO9001 system strictly; affordable price.
Q:What service do you offer?
A:
Both are ok, we have few standard spec samples in warehouses, mainly OEM/ODM service, quick sample production time(10-15 days normally)
Q:What is the production time and delivery time?
A:
Depends on the QTY, normally 30-45 days for mass production; normally 15-25 days by air, 45-60 days by sea.
Q:What certifications do you have?
A:
We have BSCI, ISO9001 (factory) ,CE, ABe(eVFK), EAC, EN14619/17128, WEEE, etc

Send Inquiry

*To:Wuyi Jinyue Engine Science and Technology Co., Ltd.Wuyi Jinyue Engine Science and Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like