SourcingAI
Try for free
Powered by Made-in-China.com
Labor Saving Easy Pull Round Structure GYFTY Fiber Optical Cable Accelerating Mass Outdoor Broadband Construction Schedules
US$0.02-1.15
1 Piece
Sample price:US$10.00/piece.Request sample

Product profile

Customization

Available

Application

Communication

Type

G.652/G.655

Model NO.

GYFTY

Connection Structure

Fiber Optic

Material Shape

Round Wire

Allowed Lateral Pressure

100(N/100mm)<1000(N/100mm)

Allowed Tensile Strength

1000N<10000N

Core

2-144

Brand

OEM

Sheath Material

PE/Customize

Strength Member

FRP

Customized

Yes

Outer Sheath Color

Black

Operate Temperature

-40℃ to +70℃

Brand OEM

Acceptable

Transport Package

Drum

Specification

G. 652/G. 655

Trademark

LFOT

Origin

Sichuan, China

HS Code

8544700000

Key features

Global Certification Standards: Holds ISO9001, ISO14001, ISO45001, TL9000, ISO37001, and ISO28000 certifications.
CNAS Certified Laboratory: Equipped with advanced testing equipment for precise fiber and cable performance analysis.
Robust R&D Capabilities: Secured multiple patents and collaborates with universities for cutting-edge optical tech.
Wide Application Scenarios: Serves 5G, data centers, submarine communications, and global telecom networks.
Proven Industry Partners: Supplies major operators like China Mobile and exports to Southeast Asian markets.
Comprehensive Quality Control: Strict inspection from raw materials to finished products ensures batch quality.
High Production Capacity: Annual output exceeds 22 million fiber-km with 100 production lines.
Flexible Customization Options: Offers full customization, design-based, and sample-based customization services.

Company profile

Sichuan Lefei Optoelectronics Technology Co., Ltd.
Cooperated with Fortune 500Fast DeliveryODM ServicesManagement Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedNearest Port: Chengdu PortAverage Response Time: ≤0.42h CertifiedTerms of Payment: LC, T/T, D/P, etc.

AI-Powered supplier vetting

SummaryLFOT is described as a manufacturer of optical fibers and optical cables with integrated telecommunications solutions and multiple management-system certifications. It demonstrates broad customization, ODM, SDK, and OEM capabilities, supported by recent new-product activity and 48 quality inspectors. Production-related procedures are documented, but the supplier reports no valid manufacturing-capacity contract with associated subcontractors. International service infrastructure is limited: no overseas agents, branches, warehouses, showrooms, or offline trade-show participation are reported, although export sales account for 31%–40% and the supplier accepts several international quotation terms. Financial credibility cannot be confirmed because the provided financial fields contain zero values and do not establish meaningful performance. Sustainable-development execution is also limited by the stated absence of an AI-based data and decision-management model.
Supplier typeThe supplier is explicitly described as Sichuan Lefei Optoelectronic Technology Co., Ltd., a manufacturer of optical fibers and optical cables that provides integrated solutions for global telecommunications applications. Its stated production scope includes outdoor, indoor, and specialty optical cables.
CertificationsThe company description explicitly lists ISO9001, ISO14001, ISO45001, TL9000, ISO37001, and ISO28000 certifications. This is direct evidence of multiple quality, environmental, occupational-safety, governance, and supply-chain-related certification holdings.
R&D capabilityThe supplier reports new products during the past year, ODM service, an available SDK, and R&D capabilities covering various outdoor, indoor, and specialty optical cables. It also states that it has not established an AI model for big-data processing and decision-enabled management, indicating a limitation in the specified digital sustainability capability.
Production capacityThe supplier has cable forming and sheath production lines, 48 quality assurance and quality control inspectors, uniformly followed finished-product inspection instructions, and documented supplier-service procedures. Export sales are reported at 31%–40%, but the absence of a valid contract with associated subcontractors is a stated production-capacity governance weakness.
Customization capabilityBoth relevant slices list customization from samples, customization from designs, minor customization, flexible customization, and full customization. The supplier also reports ODM capability, providing explicit evidence of broad customization and original-design support.
Client casesThe supplier reports OEM service for well-known brands and exports accounting for 31%–40% of total sales, which supports experience serving brand customers and international markets. No specific customer names, projects, products, or verifiable case details are provided.

Product Q&A

Q:Can I have the sample?
A:
Yes you can.
Q:Can I use my own logo or design on the products?
A:
Yes, we offer OEM/ODM services; your logo and design can be made on the products.
Q:Do you have a factory?
A:
Yes, we have a factory in Sichuan Province, China. You are welcome to visit our company and factory. We are a professional manufacturer providing OEM/ODM services to clients.
Q:What is your factory's production capacity?
A:
Our annual optical cable production capacity is more than 22 million fibre-km.
Q:When will my order be shipped?
A:
Regular products are in stock and will be shipped within 5 days. Delivery time for customized products will be longer depending on the complexity of the customization requirements. The specific time will be discussed and determined with you upon order confirmation. All goods undergo rigorous quality inspection to ensure they meet customer requirements. We cooperate with multiple international logistics companies to provide efficient and secure transportation services. Specific shipping costs and

Send Inquiry

*To:Sichuan Lefei Optoelectronics Technology Co., Ltd.Sichuan Lefei Optoelectronics Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Competitive Prices 48 Core Sm Fiber Optical Cable GYFTY
Made-in-China.com
Indoor Outdoor Fiber Optic Optical Cable GYFTY
Made-in-China.com
8f Optical Fiber Dry Structure Indoor Cable

8f Optical Fiber Dry Structure Indoor Cable

US$0.32-0.38
1,000 Meters(MOQ)
Made-in-China.com