Powered by Made-in-China.com
Large Data Transmission Fiber Optical Cable for Cloud Data Center Construction
US$0.02-8.00
1 km
Sample price:US$10.00/piece.Request sample
Product profile
Customization
AvailableApplication
CommunicationType
G.652/G.655Model NO.
GYTSConnection Structure
Fiber OpticMaterial Shape
Round WireAllowed Lateral Pressure
100(N/100mm)<1000(N/100mm)Allowed Tensile Strength
1000N<10000NCore
2-288Brand
OEMSheath Material
PE/CustomizeStrength Member
Steel WireOuter Sheath Color
BlackOperate Temperature
-40℃ to +70℃Brand OEM
AcceptableTransport Package
DrumSpecification
G. 652/G. 655Trademark
LFOTOrigin
Sichuan, ChinaHS Code
8544700000Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedNearest Port: Chengdu PortAverage Response Time: ≤3.82h CertifiedTerms of Payment: LC, T/T, D/P, etc.
AI-Powered supplier vetting
SummaryLFOT is described as a manufacturer of optical fibers and optical cables with integrated telecommunications solutions and multiple management-system certifications. It demonstrates broad customization, ODM, SDK, and OEM capabilities, supported by recent new-product activity and 48 quality inspectors. Production-related procedures are documented, but the supplier reports no valid manufacturing-capacity contract with associated subcontractors. International service infrastructure is limited: no overseas agents, branches, warehouses, showrooms, or offline trade-show participation are reported, although export sales account for 31%–40% and the supplier accepts several international quotation terms. Financial credibility cannot be confirmed because the provided financial fields contain zero values and do not establish meaningful performance. Sustainable-development execution is also limited by the stated absence of an AI-based data and decision-management model.
Supplier typeThe supplier is explicitly described as Sichuan Lefei Optoelectronic Technology Co., Ltd., a manufacturer of optical fibers and optical cables that provides integrated solutions for global telecommunications applications. Its stated production scope includes outdoor, indoor, and specialty optical cables.
CertificationsThe company description explicitly lists ISO9001, ISO14001, ISO45001, TL9000, ISO37001, and ISO28000 certifications. This is direct evidence of multiple quality, environmental, occupational-safety, governance, and supply-chain-related certification holdings.
R&D capabilityThe supplier reports new products during the past year, ODM service, an available SDK, and R&D capabilities covering various outdoor, indoor, and specialty optical cables. It also states that it has not established an AI model for big-data processing and decision-enabled management, indicating a limitation in the specified digital sustainability capability.
Production capacityThe supplier has cable forming and sheath production lines, 48 quality assurance and quality control inspectors, uniformly followed finished-product inspection instructions, and documented supplier-service procedures. Export sales are reported at 31%–40%, but the absence of a valid contract with associated subcontractors is a stated production-capacity governance weakness.
Customization capabilityBoth relevant slices list customization from samples, customization from designs, minor customization, flexible customization, and full customization. The supplier also reports ODM capability, providing explicit evidence of broad customization and original-design support.
Client casesThe supplier reports OEM service for well-known brands and exports accounting for 31%–40% of total sales, which supports experience serving brand customers and international markets. No specific customer names, projects, products, or verifiable case details are provided.
Send Inquiry
*To:
Sichuan Lefei Optoelectronics Technology Co., Ltd.
Sichuan Lefei Optoelectronics Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
High-Speed 400g Osfp Aoc Fiber Optic Cable for Data Centers and Networking Solutions
US$580.00-1,500.00
10 Pieces(MOQ)
High-Performance Double-Jacket Fiber Optic Cable for Data Centers
US$0.36-1.56
3,000 Meters(MOQ)
Durable Self-Supporting Optical Cable for Data Center Connectivity
US$0.11-0.25
3,000 Meters(MOQ)
12 Cores Multimode MPO Fiber Optic Patch Cord OM3 OM4 Optical Fiber Cables for Data Centre
US$3.20-5.30
30 piece(MOQ)
High-Performance Customized GYTA53 Armored Optical Fiber Optic Cable for Data Centers
US$1.80-2.00
1,000 Meters(MOQ)
High-Performance GYFTY33 Outdoor Optical Cable for Data Transmission
US$0.48-0.82
3,000 Meters(MOQ)
High-Performance Gel-Free Fiber Optic Cable for Fast Data Transmission
US$0.54-1.63
3,000 Meters(MOQ)
High-Performance Micro Optical Fiber Cable for Fast Data Transmission
US$0.5963-0.6221
1,000 Meters(MOQ)
High-Density LC Uniboot Dual-Core Single Mode LSZH Yellow Optical Fiber Patch Cable For Data Centers
US$1.50-2.20
100 piece(MOQ)
12 Cores MTP OM4 50/125 Optical Fiber Patch Cord Multimode Trunk Cable for Data Center
US$5.80-7.60
30 piece(MOQ)
Reliable Communication Optical Fiber Flat Flat Optical Cable for Data Transmission
US$0.185-0.187
1,000 Meters(MOQ)
Multimode Fiber Optic Patch Cord LC to Sc Optical Jumper Cable for Data Center Network
US$18.00
100 Rolls(MOQ)
Factory Direct Supply GYFTY 12 Core Non-Metallic Stranded Loose Tube Optical Cable for Data Centers
US$0.25
20,000 Meters(MOQ)
Best Selling Compact Stranded Optical Fiber Cable for Data Center Link Wiring
US$0.02-8.00
1 km(MOQ)
Data Center Interconnect Gcyfy Fiber Optical Cable for Server Room Duct Fiber Links
US$0.01-1.00
1 km(MOQ)
High-Performance 2-288 Core GYTA53 Armored Optical Fiber Optic Cable for Data Centers
US$1.80-2.00
1,000 Meters(MOQ)
MPO/MTP to LC Optical Fiber Cable Jumper for Data Center
US$21.80-25.00
1 Piece(MOQ)



















