SummaryQingdao Lianchengda Machinery Co., Ltd. is a China-based limited company established in 2017, with 56 employees and four production lines. It offers sheet metal fabrication, stamping, CNC, and tube parts, and states that it can customize single-piece products. The supplier reports a professional technical team, design drawing analysis, product control plans, third-party inspection acceptance, and a stated first mass-production lead time of 30–60 days. SGS is identified as the auditing organization, with a report period from May 17, 2025 to May 16, 2026; however, the audit result is recorded as “0,” without an explained interpretation. Management-system certification is listed as NIL. R&D, OEM/ODM, quality-assurance, traceability, sustainability, overseas service, and customer-case information is unavailable or marked unknown. The supplier’s primary export market is listed as domestic, so international delivery capability is not established by the provided data.
Supplier typeThe supplier is identified as Qingdao Lianchengda Machinery Co., Ltd., a Chinese limited company operating in Shandong. Its stated product scope covers sheet metal fabrication parts, stamping parts, CNC parts, and tube parts, while its primary export market is recorded as domestic.
CertificationsSGS is listed as the audit organization, with an audit report period from May 17, 2025 to May 16, 2026. However, the audit result is recorded as “0” without an explanation, and supplier management-system certification is explicitly listed as NIL; therefore, certified compliance cannot be confirmed.
After-Sales capabilityThe supplier states that it provides excellent after-sales service, maintains control plans for all products, accepts specified third-party inspections, and determines warranty terms according to the product and processing. These statements indicate a declared service approach, but do not establish measurable service performance or warranty coverage.
Production capacityThe supplier offers four stated manufacturing categories, operates four production lines, and reports a normal first mass-production lead time of 30–60 days, with an off-peak lead time of one month. It also states that control plans are used for all products, but detailed capacity validation, fulfillment performance, and quality-assurance systems are unavailable.
Customization capabilityThe supplier explicitly states that customization of one piece is acceptable and that its technical team can quickly analyze customer drawings to develop a solution. It also describes first-article provision after design and cost confirmation, directly supporting small-volume and drawing-based customization capability.