Powered by Made-in-China.com
Early Removal Drophead Steel Table Formwork for Accelerated Building Construction
US$900.00-1,300.00
10 Tons
Product profile
Customization
AvailableAfter-sales Service
Technical Support, CAD/3D Design, on-Site GuidancWarranty
1 YearModel NO.
T-FormCertification
ISO, CEMaterial
Steel WoodType
Slab FormworkColour
Red, Blue, CustomizedAdvantage
Quick AssembleFunction
Reusable, Adjustable, High Pressure ResistanceApplication
High-Rise Building, Infrastructure, Bridge, MassTransport Package
Standard PackageSpecification
CustomizedTrademark
LianggongOrigin
ChinaKey features
Early Stripping Mechanism: Enables rapid removal of non-load-bearing components to significantly enhance construction speed.
High Efficiency Operation: A 4-person team can achieve up to 400 square meters of daily operation area for rush projects.
Customizable Colors: Available in Red, Blue, or fully customized color options to meet specific project requirements.
Reusable and Durable: Steel and wood components designed for multiple reuses to reduce long-term investment costs.
Built-in Safety Features: Equipped with handrails and guardrails to ensure safety during high-altitude operations.
Lightweight and Portable: Maximum weight of 44 kg with handheld design for convenient transportation and flexible operation.
Flexible Adaptability: Compatible with various plate configurations and thickness requirements without frequent adjustments.
Comprehensive Technical Support: Includes CAD/3D design, remote guidance, and on-site instruction for customer satisfaction.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤2.12h
AI-Powered supplier vetting
SummaryThe supplier is a limited company with extensive customization capabilities and a strong service offering. They hold several certifications, including ISO and CE, which reflect their commitment to quality and sustainable practices. However, the supplier lacks overseas warehousing and showroom capabilities, which could limit their international reach. They have a proven track record in OEM services for well-known brands and a history of introducing new products. Financially, they have maintained consistent reporting over the past three years.
CertificationsThe supplier holds ISO9001:2015, ISO14001, ISO45001:2018, and CE certifications, showcasing their adherence to quality, environmental, and safety standards.
After-Sales capabilityThe supplier offers comprehensive after-sales services, including debugging, maintenance, repair, training, and equipment installation.
Financial creditFinancial reporting has been consistent over the last three years, indicating stable financial capacity.
R&D capabilityThe supplier has demonstrated R&D capabilities and offers ODM services, suggesting a strong innovative ability.
Customization capabilityThey offer extensive customization options, including full and flexible customization from samples and designs.
Product Q&A
Q:Are you trading company or manufacturer?
A:
We are a factory.
Q:How long is your delivery time?
A:
Delivery typically ranges from 5-15 days for in-stock items or 15-20 days for non-stock items, contingent on quantity.
Q:Do you provide samples? Is it free or extra?
A:
Absolutely, we provide free samples; however, you need to cover freight costs.
Send Inquiry
*To:
YANCHENG LIANGGONG FORMWORK CO., LTD.
YANCHENG LIANGGONG FORMWORK CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Early Stripping Steel Frame Modular Table Formwork for High Rise Building
US$80.00-150.00
300 Square Meters(MOQ)
Doka Q355 Steel Aluminium Building Materials Early-Stripping Drop Head Slab Formwork for Construction
US$70.00-75.00
1 Square Meter(MOQ)
Reliable Construction Slab Table Formwork for High Performance Steel Structures
US$900.00-1,300.00
10 Tons(MOQ)
Lianggong High-Efficiency Steel Drophead Slab Formwork for Concrete Construction
US$900.00-1,300.00
10 Tons(MOQ)
Steel Frame Slab Formwork with Early Stripping Drop Head for Building Construction
US$330.00-350.00
500 Square Meters(MOQ)
Doka Supplier Building Materials Early Stripping Steel Frame Construction Formwork for Concrete
US$70.00-75.00
100 Square Meters(MOQ)
China Lianggong Building Material Concrete Slab Table Shuttering Formwork for Construction with Factory Price
US$69.00-89.00
500 Square Meters(MOQ)
Doka Q355 Steel Aluminium Building Materials Early-Stripping Drop Head Slab Formwork for Construction
US$79.00-109.00
50 Square Meters(MOQ)
Green Formwork Table Panel Formwork for Building Concrete Construction
Negotiable
1,000 Square Meters(MOQ)
Aluminum High Strength Early Stripping Drophead Green Formwork for Large-Scale Building
US$15.99
5,000 Pieces(MOQ)
Early Stripping Head Steel Panel Floor Formwork for Building Concrete Construction
US$130.00-200.00
1,000 Square Meters(MOQ)
Factory Concrete Steel Formwork Panel Early-Stripping Drophead Slab Formwork for Construction
US$28.00-30.00
100 Meters(MOQ)
Aluminum Slab Formwork Building Material with Early Stripping Head for Concrete Building Construction
US$79.00-109.00
50 Square Meters(MOQ)
Hot China Slab Building Material Panel Construction Scaffolding Wall Concrete Table Form Steel Formwork
US$80.00-120.00
999 Square Meters(MOQ)
Fineform Manufacture Early Stripping Panel Table Shuttering Slab Formwork for Concrete Construction Product
US$90.00-100.00
300 Square Meters(MOQ)
Lianggong Manufacturer Drop Head Slab Table Formwork for Building Construction
US$80.00-90.00
900 Square Meters(MOQ)
Q355b Table Formwork for Building Construction
US$100.00
500 Pieces(MOQ)



















