Powered by Made-in-China.com

Early Stripping Formwork Panel Steel Frame Drophead Slab Formwork
US$35.00
100-199 Pieces
US$34.00
200-499 Pieces
US$33.00
500+ Pieces
Product profile
Customization
AvailableAfter-sales Service
Online Technical Support, Onsite InstallationWarranty
1 YearModel NO.
formworkCertification
ISO, ISO9001Material
Q355steelType
Slab FormworkMaterials
SteelApplication
Hotel, Wall, Column, Core Tube, etcPlace of Origin
Jiangsu, ChinaSurface Treatment
CustomisedUsage
Slab FormworkMOQ
50 SetsTransport Package
Standard PackageSpecification
Standard & CustomizedTrademark
LianggongOrigin
Yancheng, ChinaHS Code
730840Key features
Early Stripping Mechanism: Shortens construction period and reduces the number of panels needed for cost savings.
High Erection Speed: Efficient solutions allow erection rates up to 100 square meters per person per day.
Lightweight Hand-held Design: Largest panel size 1800x1200mm weighs only 44kg for easy manual handling.
Minimal Crane Requirement: Manual erection and movement reduce crane dependency and eliminate bottlenecks.
Self-Lock Clamp System: Pre-designed panel layout ensures correct installation and high strength safety.
Customized Surface Treatment: Surface treatment options are available to meet specific project customization needs.
1-Year Warranty Coverage: Comprehensive 1-year warranty provided for all mechanical equipment and parts.
ISO9001 Certified Quality: Manufactured with ISO and ISO9001 certifications ensuring high quality standards.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤2.56h
AI-Powered supplier vetting
SummaryThe supplier is a limited company with extensive customization capabilities and a strong service offering. They hold several certifications, including ISO and CE, which reflect their commitment to quality and sustainable practices. However, the supplier lacks overseas warehousing and showroom capabilities, which could limit their international reach. They have a proven track record in OEM services for well-known brands and a history of introducing new products. Financially, they have maintained consistent reporting over the past three years.
CertificationsThe supplier holds ISO9001:2015, ISO14001, ISO45001:2018, and CE certifications, showcasing their adherence to quality, environmental, and safety standards.
After-Sales capabilityThe supplier offers comprehensive after-sales services, including debugging, maintenance, repair, training, and equipment installation.
Financial creditFinancial reporting has been consistent over the last three years, indicating stable financial capacity.
R&D capabilityThe supplier has demonstrated R&D capabilities and offers ODM services, suggesting a strong innovative ability.
Customization capabilityThey offer extensive customization options, including full and flexible customization from samples and designs.
Product Q&A
Q:Are you a trading company or manufacturer?
A:
We are manufacturer for 12 years.
Q:What do you do?
A:
We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q:What can you do for us?
A:
We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects. We sell our products to the contractors, building companies, material supplier or trading companies. We support our worldwide peer companies with our outstanding formwork or scaffolding products. We provide remote or on-site instruction to the builders.
Q:Do you provide samples? is it free or extra?
A:
Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:
Structural drawing and section drawing.
Send Inquiry
*To:
YANCHENG LIANGGONG FORMWORK CO., LTD.
YANCHENG LIANGGONG FORMWORK CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Early Stripping Steel Frame Modular Table Formwork for High Rise Building
US$80.00-150.00
300 Square Meters(MOQ)
Doka Q355 Steel Aluminium Building Materials Early-Stripping Drop Head Slab Formwork for Construction
US$70.00-75.00
1 Square Meter(MOQ)
Advanced Steel Panel Formwork for Early Stripping in Concrete
US$90.00-110.00
500 Square Meters(MOQ)
Patent Green Formwork Concrete Construction Early Stripping Efficient Slab Formwork
US$80.00-180.00
1,000 Square Meters(MOQ)
Lianggong Early Stripping Slab T-Form Metal Formwork Plastic Formwork for Slab
US$100.00-130.00
40 Pieces(MOQ)
Professional Early Stripping Aluminum Slab Formwork with Drophead for High-Strength Concrete Slabs
US$50.00-70.00
1,000 Pieces(MOQ)
Slab Formwork High Efficiency with Early Stripping Head
Negotiable
1,000 Square Meters(MOQ)
Hot Green Patent Certificate GF Panel Concrete Construction Table Form Early Stripping Formwork
US$80.00-120.00
999 Square Meters(MOQ)
Doka Supplier Slab Concrete Construction Early Stripping Drop Head Formwork
US$70.00-75.00
1 Square Meter(MOQ)
Hot Sale Easy Install Skydeck Early Stripping Drop Head Waffle Slab Formwork for Concrete Construction Product
US$90.00-100.00
300 Square Meters(MOQ)
Durable Drophead Slab Formwork Panel with High Strength for Fast Construction Site
US$28.00-30.00
100 Meters(MOQ)
New Design Aluminum Frame Slab Formwork with Early Stripping Drop Head
US$89.00-170.00
500 Square Meters(MOQ)
China Manufacturer Reliable Steel Frame Drophead Slab Formwork for Heavy-Duty Flooring Projects
US$58.00-60.00
10 Square Meters(MOQ)
Concrete Slab Early-Stripping Panel Aluminum Formwork for Light High-Strength High-Reuse with Toe Board CE
US$100.00-120.00
500 Square Meters(MOQ)
High-Quality Reusable Steel Frame Early Stripping Slab Formwork for Concrete Slab, Floor, Ceiling Construction
US$90.00-100.00
300 Square Meters(MOQ)



















