Powered by Made-in-China.com
Lianggong Manufacturer Skydeck Slab Formwork with Early Stripping Head
US$60.00
100-499 Pieces
US$55.00
500+ Pieces
Product profile
Customization
AvailableAfter-sales Service
Online Technical Support, Onsite InstallationWarranty
1 YearModel NO.
formworkCertification
ISO9001Material
Q235steelMaterials
SteelApplication
Hotel, Wall, Column, Core Tube, etcPlace of Origin
Jiangsu, ChinaSurface Treatment
CustomisedTransport Package
Standard PackageSpecification
Standard & CustomizedTrademark
LianggongOrigin
Yancheng, ChinaHS Code
730840000Production Capacity
30000 PCS Per MonthKey features
Early Stripping Mechanism: Shortens construction period and reduces panel count for lower cost and storage.
High Erection Speed: Installation speed reaches 60-100 square meters per person per day.
Customized Surface Treatment: Surface treatment options are available for customization.
ISO9001 Certified: Manufacturing process adheres to ISO9001 quality management standards.
1 Year Warranty: Comprehensive 1-year warranty coverage for mechanical defects.
Online Technical Support: Remote guidance and support available for all product inquiries.
Versatile Panel Sizes: Available in multiple sizes from 600x600mm to 1800x1200mm.
OEM/ODM Services: Full customization and design support available for specific projects.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤4.00h
AI-Powered supplier vetting
SummaryThe supplier is a limited company with extensive customization capabilities and a strong service offering. They hold several certifications, including ISO and CE, which reflect their commitment to quality and sustainable practices. However, the supplier lacks overseas warehousing and showroom capabilities, which could limit their international reach. They have a proven track record in OEM services for well-known brands and a history of introducing new products. Financially, they have maintained consistent reporting over the past three years.
CertificationsThe supplier holds ISO9001:2015, ISO14001, ISO45001:2018, and CE certifications, showcasing their adherence to quality, environmental, and safety standards.
After-Sales capabilityThe supplier offers comprehensive after-sales services, including debugging, maintenance, repair, training, and equipment installation.
Financial creditFinancial reporting has been consistent over the last three years, indicating stable financial capacity.
R&D capabilityThe supplier has demonstrated R&D capabilities and offers ODM services, suggesting a strong innovative ability.
Customization capabilityThey offer extensive customization options, including full and flexible customization from samples and designs.
Product Q&A
Q:Are you trading company or manufacturer?
A:
We are manufacturer for formwork for years.Our main products: steel formwork,steel frame formwork,aluminum frame formwork,wooden formwork,climbing formwork,tunnel formwork ,bridge formwork,Culvert formwork etc.
Q:How long is your delivery time?
A:
Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q:Do you provide samples? Is it free or extra?
A:
Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q:What can you do for us?
A:
We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects. B:We sell our products to the contractors, building companies, material supplier or trading companies. C:We support our worldwide peer companies with our outstanding formwork or scaffolding products. D:We provide remote or on-site instruction to the builders.
Q:Why should you buy from us not from other suppliers?
A:
1. Professional team ; 12 years market experience. 2. Big factory for long term business relationship,300000 tons capacity / year 3. One-stop service center for all formwork needs. 4.24 hours on line service
Send Inquiry
*To:
YANCHENG LIANGGONG FORMWORK CO., LTD.
YANCHENG LIANGGONG FORMWORK CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Lianggong Early Stripping Slab T-Form Metal Formwork Plastic Formwork for Slab
US$100.00-130.00
40 Pieces(MOQ)
2024 Aluminium Slab Formwork Light Weight with Early Stripping Head
US$100.00-120.00
500 Square Meters(MOQ)
Doka Q355 Steel Metal Frame Aluminium Plastic Timber Beam Early-Stripping Drop Head Slab Concrete Formwork for Construction
US$55.00-60.00
1 Square Meter(MOQ)
Aluminum Slab Formwork Building Material with Early Stripping Head for Concrete Building Construction
US$68.00-90.00
200 Square Meters(MOQ)
China Manufacturer Aluminum Skydeck Slab Formwork with Aluminum Prop Similar to Peri
US$230.00-300.00
1,000 Square Meters(MOQ)
Speedeck Advanced Slab Formwork with Early Stripping Capability Function
US$1.00-9,999.00
1 Piece(MOQ)
Steel Frame Formwork Slab Formwork with Early Stripping Device for Slab Concrete
US$330.00-350.00
500 Square Meters(MOQ)
New Design Aluminum Frame Slab Formwork with Early Stripping Drop Head
US$89.00-170.00
500 Square Meters(MOQ)
Hot Sale Easy Install Skydeck Early Stripping Drop Head Waffle Slab Formwork for Concrete Construction Product
US$90.00-100.00
300 Square Meters(MOQ)
LG China Scaffolding Props Details Steel Early Stripping Formwork with CE
US$120.00-140.00
100 Square Meters(MOQ)
Green Formwork Modular Light Weight Building Materials Formwork with Early Stripping Head
Negotiable
1,000 Square Meters(MOQ)
Hot Sale Easy Install Waffle Slab Formwork Early Stripping Drop Head Slab Formwork for Concrete Mould Construction
US$90.00-100.00
300 Square Meters(MOQ)
China Lianggong Concrete Slab Formwork with Drop Head for Building Construction
US$47.00-49.00
300 Pieces(MOQ)
Concrete Slab Green Formwork Panel with Early Stripping Head
US$80.00-125.00
100 Square Meters(MOQ)
Lianggong Early Stripping Slab Formwork for Beam-Less Concrete Structure Projects
US$69.00-75.00
100 Pieces(MOQ)
Early Stripping Form with Steel Plywood Plastic Metal Formwork Panel for Slab Ceiling Concrete Mould Construction
US$90.00-100.00
300 Square Meters(MOQ)
Early Stripping Head Steel Frame Plywood Shuttering Slab Formwork for Concrete Construction Skydeck
US$90.00-100.00
300 Square Meters(MOQ)
Slab Steel Frame Formwork T-Form with Early Stripping Device for Slab Concrete
US$65.00-75.00
500 Square Meters(MOQ)



















