Powered by Made-in-China.com
Made in China Crane-Free Bridge Construction Climbing Formwork for Super High-Rise Building
US$2,888.00-4,999.00
1 Set
Sample price:US$2.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
One-Stop ServiceWarranty
1 YearModel NO.
Hydraulic Auto-climbing SystemCertification
ISOMaterial
SteelType
Climbing FormworkColor
CustomizedSurface Treatment
Powder CoatedCertificate
ISO9001Feature
Modular and ReusablePerformance
Fast & Safe Hydraulic FormworkTransport Package
Standard PackageSpecification
CustomizedTrademark
Lianggong FormworkOrigin
ChinaHS Code
7308400000Production Capacity
4000sets/MonthKey features
Crane-Free Operation: Hydraulic auto-climbing system climbs steadily without requiring any external lifting devices.
Fast Construction Speed: Average climbing speed of 5 days per floor, significantly accelerating the whole construction work.
Modular and Reusable: Designed as a modular system that is fully reusable for multiple high-rise projects.
One-Stop Service: Comprehensive service covering consulting, design, manufacture, delivery, and after-sales support.
Customized Color: Color options are fully customizable to meet specific project requirements.
Powder Coated Surface: Surface treatment is powder coated for enhanced durability and protection.
ISO9001 Certified: Manufacturing process and products certified under ISO9001 quality standards.
On-Site Supervision: Professional on-site supervision service available for most projects worldwide.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤4.00h
AI-Powered supplier vetting
SummaryThe supplier is a limited company with extensive customization capabilities and a strong service offering. They hold several certifications, including ISO and CE, which reflect their commitment to quality and sustainable practices. However, the supplier lacks overseas warehousing and showroom capabilities, which could limit their international reach. They have a proven track record in OEM services for well-known brands and a history of introducing new products. Financially, they have maintained consistent reporting over the past three years.
CertificationsThe supplier holds ISO9001:2015, ISO14001, ISO45001:2018, and CE certifications, showcasing their adherence to quality, environmental, and safety standards.
After-Sales capabilityThe supplier offers comprehensive after-sales services, including debugging, maintenance, repair, training, and equipment installation.
Financial creditFinancial reporting has been consistent over the last three years, indicating stable financial capacity.
R&D capabilityThe supplier has demonstrated R&D capabilities and offers ODM services, suggesting a strong innovative ability.
Customization capabilityThey offer extensive customization options, including full and flexible customization from samples and designs.
Product Q&A
Q:Are you a factory or trading company?
A:
We are a factory.
Q:How to get a quotation?
A:
You can send us your project structural drawing or the material list for a quotation. Our engineer team will give your formwork solution.
Q:What is the payment term?
A:
By T/T or L/C.
Q:What is the lead time?
A:
Generally, it takes 25-30 days according to the quantity.
Q:What is the package method?
A:
We have standard package such as steel pallets, ton bags etc. , which suits to container transportation.
Send Inquiry
*To:
YANCHENG LIANGGONG FORMWORK CO., LTD.
YANCHENG LIANGGONG FORMWORK CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Building Material Made-in China Factory Price Peri Aluminium Frame Wall and Column Construction Formwork for Concrete
US$100.00-200.00
200 Square Meters(MOQ)
China Lianggong Manufacture Cantileve Climbing Formwork for Wall/Bridge/Dam Building Construction
US$479.00-499.00
50 Sets(MOQ)
Lianggong Customized Steel Cantilever Climbing Formwork for Wall Bridge Dam Building Construction
US$399.00-499.00
300 Sets(MOQ)
Lianggong Concrete Hydraulic Auto Climbing Formwork for High Rise Building Pier Construction
US$4,588.00-4,988.00
20 Sets(MOQ)
Lianggong Manufacture High-Performance Cantilever Climbing Formwork for Building Construction
US$480.00-1,200.00
1 Piece(MOQ)
Lianggong Manufacture Advanced Cantilever Climbing Formwork System for High-Rise Concrete Construction
US$480.00-1,200.00
1 Piece(MOQ)
China Total Contec Concrete Automatic Climbing Formwork for High-Rise Building Construction
US$2,587.00-2,887.00
10 Meters(MOQ)
Advanced Cantilever Climbing Formwork for Bridge Construction Projects
US$1,100.00-1,300.00
10 Tons(MOQ)
Heavy-Duty Truss Formwork System for Bridge and High-Rise Construction
US$450.00-1,150.00
1 Set(MOQ)
Single-Side Climbing One Side Formwork for High-Rise Bridge and Tower Concrete Shutting
US$98.87-100.87
100 Meters(MOQ)
Concrete Construction Steel Metal Climbing Wall Jump Formwork for Pier Bridge Dam Shear Retaining Wall
US$220.00-380.00
200 Square Meters(MOQ)
Steel H20 Timber Beam Metal Cantilever Shear Wall Bridge Pier Elevator Shaft Core Wall Climbing Formwork for Construction Concrete
US$2,587.00-2,887.00
10 Meters(MOQ)
Suspension Cantilever Climbing Formwork for Bridges and Dams Concrete Construction
US$220.00-380.00
200 Square Meters(MOQ)
Easy China Made Quality High Precision Aluminum Formwork for Construction
US$100.00-135.00
500 Square Meters(MOQ)
High Pier Steel Formwork Climbing System for Railway Bridge Construction
US$16.00-35.00
20 Pieces(MOQ)
Adjustable Self Climbing Steel Wall Formwork Square Concrete Columns Formwork for Villa Construction
US$710.00-730.00
10 Pieces(MOQ)
Concrete Construction Steel Metal Adjustable Climbing Wall Jump Formwork for Bridge Dam Shear Wall Retaining
US$220.00-380.00
200 Square Meters(MOQ)



















