Powered by Made-in-China.com
Steel Frame Formwork Early Stripping Head Table Formwork
US$140.00
100-499 Square Meters
US$120.00
500+ Square Meters
Product profile
Customization
AvailableAfter-sales Service
Online Technical Support, Onsite InstallationWarranty
1 YearModel NO.
FormworkCertification
ISO9001Material
Q235steelType
Slab FormworkMaterials
SteelApplication
Hotel, Wall, Column, Core Tube, etcPlace of Origin
Jiangsu, ChinaSurface Treatment
CustomisedTransport Package
Standard PackageSpecification
Standard & CustomizedTrademark
LianggongOrigin
Yancheng, ChinaKey features
Complete Formwork System: Includes wall, column, and angle formwork with complete accessories for convenient assembly.
High Stiffness & Durability: 15mm or 18mm plywood with hollow steel frame ensures perfect concrete shape and repeated turnover.
Wide Application Range: Suitable for building, bridge, tunnel, hotel, wall, column, and core tube construction.
Customized Surface Treatment: Surface treatment can be customized according to specific project requirements.
Professional Technical Support: Provides online technical support, onsite installation, and remote or on-site guidance.
Quality Assurance: ISO9001 certified with professional quality inspection team and test reports available.
Flexible Delivery Options: Delivery time is 5-30 days depending on quantity, shipped via Shanghai Port.
Manufacturer Direct Supply: Direct from manufacturer with large-scale production workshop and first-class production line.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤3.83h
AI-Powered supplier vetting
SummaryThe supplier is a limited company with combined company type and offers a broad range of construction formwork products. It demonstrates strong customization and R&D capabilities, including ODM services, recent new-product activity, and OEM service for known brands. Quality and management systems are supported by ISO9001:2015, ISO14001, ISO45001:2018, and CE certifications. After-sales capabilities include debugging, maintenance, repair, training, and equipment installation, supported by documented service procedures and complaint-handling records. Export experience is stated as 10 years, with exports representing 11%–20% of total sales. However, the supplier lacks a valid contract with related subcontractors, has no overseas warehouse or showroom, and does not have an available SDK. Financial evidence is present for 2022–2024, but the supplied information does not provide enough detail to assess financial strength.
Supplier typeThe supplier is identified as a limited company with a combined company type, and its stated product scope covers multiple construction formwork categories. The business scope includes activities requiring approval by relevant departments, indicating that applicable regulatory authorization should be verified for those activities.
CertificationsThe supplier reports ISO9001:2015, ISO14001, and ISO45001:2018 management-system certifications, as well as CE product compliance certification. These certifications provide explicit evidence of quality, environmental, occupational safety, and product-compliance systems.
After-Sales capabilityAfter-sales offerings include debugging, maintenance, repair, training, and equipment installation. The supplier also reports written and followed procedures for service assessment, corrective and preventive actions, and customer complaints, providing direct evidence of a structured service process.
R&D capabilityThe supplier reports new-product activity during the past year, provides ODM services, and has received one national science and technology progress award. It does not have an available SDK, but the other evidence supports a positive assessment of product-development and innovation capability.
Production capacityThe supplier offers a broad formwork product range, reports in-stock capability, uses written and uniformly followed finished-product inspection instructions, and states one-month lead times in both peak and off-season periods. A significant control weakness is that the factory and related subcontractors reportedly have no valid contract, while the production scale and capacity volume are not provided.
Customization capabilityThe supplier explicitly supports customization from samples, customization from designs, full customization, minor customization, and flexible customization. The repeated and comprehensive customization scope provides clear evidence of strong adaptation to customer design requirements.
Product Q&A
Q:Are you a trading company or manufacturer?
A:
We are a manufacturer.
Q:How long is your delivery time?
A:
Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock. It is according to quantity.
Q:Do you provide samples? Is it free or extra?
A:
Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q:What is your terms of payment?
A:
Payment<=1000USD,100% in advance. Payment>=1000USD,30% T/T in advance,balance before shippment.
Q:What materials are used for the formwork?
A:
The formwork is made of Q235 steel and covered with 15mm or 18mm thick plywood.
Send Inquiry
*To:
YANCHENG LIANGGONG FORMWORK CO., LTD.
YANCHENG LIANGGONG FORMWORK CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Doka Q355 Steel Metal Frame Aluminium Plastic Timber Beam Early-Stripping Drop Head Slab Concrete Formwork for Construction
US$55.00-60.00
1 Square Meter(MOQ)
Early Stripping Steel Frame Modular Table Formwork for High Rise Building
US$80.00-150.00
300 Square Meters(MOQ)
Steel Slab Formwork with Early Stripping Head
US$330.00-350.00
500 Square Meters(MOQ)
High-Quality Reusable Steel Frame Early Stripping Slab Formwork for Concrete Slab, Floor, Ceiling Construction
US$90.00-100.00
300 Square Meters(MOQ)
New Design Aluminum Frame Slab Formwork with Early Stripping Drop Head
US$89.00-170.00
500 Square Meters(MOQ)
Patent Certificate GF Packages Table Form Early Stripping Formwork with CE
US$80.00-180.00
1,000 Square Meters(MOQ)
Hot Sale Easy Install Skydeck Early Stripping Drop Head Waffle Slab Formwork for Concrete Construction Product
US$90.00-100.00
300 Square Meters(MOQ)
Lianggong Early Stripping Steel Drop Head Slab Formwork for Construction
US$899.00-1,299.00
10 Tons(MOQ)
Greenformwork Easy Disassembly Reusable Aluminum Frame Early Stripping Slab Formwork OEM Custom for Underwater Engineering Concrete Applications
US$80.00-150.00
300 Square Meters(MOQ)
Easy Install Early Stripping Head Concrete Construction Plywood Shuttering Slab Formwork
US$90.00-100.00
300 Square Meters(MOQ)
Durable Steel Formwork for Fast Early Stripping Slab Projects
US$52.00
10 Square Meters(MOQ)
Hot Sale Easy Install Waffle Slab Formwork Early Stripping Drop Head Slab Formwork for Concrete Construction Product
US$90.00-100.00
300 Square Meters(MOQ)
Hot Shandong, China Wall Concrete Table Form Panel Early Stripping Formwork with ISO
US$80.00-120.00
999 Square Meters(MOQ)
Durable Steel Panels for Concrete Formwork Early Stripping
US$52.00
10 Square Meters(MOQ)
Concrete Slab Green Formwork Panel with Early Stripping Head
US$80.00-125.00
100 Square Meters(MOQ)
SGS Certified Doka Supplier Light-Weight 150 Times Early-Stripping Drop Head Slab Formwork
US$70.00-75.00
1 Square Meter(MOQ)
Lianggong Manufacturer Aluminium/Steel Frame Slab Formwork with Early Stripping Head
US$58.00-60.00
10 Square Meters(MOQ)



















