Powered by Made-in-China.com
Overhead Distribution Power Grid Preformed Helical Dead End Guy Tension Grip Fitting
US$18.50
100-499 Pieces
US$15.80
500-1,999 Pieces
US$12.50
2,000+ Pieces
Product specifications
Suitable Cable Type
Conductor Dia.
Sample price:US$18.00/piece.Request sample
Product profile
Customization
AvailableTechnics
Helical Cold-Forming & Hot-DIP GalvanizedStandard
IEEE 1138, IEC 61284Usage
ADSS/Opgw Tensioning, Dead-Ending SupportType
Preformed Dead-End / Helical Guy GripMaterial
High Tensile Galvanized Steel / Aluminum CladGrip Strength
Exceeds 95% of Conductor Rated Breaking LoadSurface Finish
Hot-DIP Galvanized (Min. 85μm Zinc Coating)Life Expectancy
Designed for 25+ Years Outdoor ServiceField Application
Overhead Distribution & Transmission LinesIdentity
111m RMB CapitalTransport Package
BoxSpecification
Customized for Cable RTS 10kN - 100kNTrademark
YongyibangOrigin
Guangzhou, ChinaKey features
High Tensile Strength: Exceeds 95% of conductor rated breaking load with flexible helical design.
Long Service Life: Designed for over 25 years of reliable outdoor service in harsh environments.
Manual Installation: Easy field application without requiring hydraulic tools or large equipment.
Vibration Management: Flexible helical structure reduces mechanical fatigue and vibration failures.
Comprehensive Compliance: Meets IEEE 1138, IEC 61284, GB/T 2314, and ANSI C119.4 standards.
ODM Customization: Tailored fittings available based on client technical drawings and samples.
Full Product Range: One-stop supply for tension clamps, connectors, and protective hardware.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Guangzhou Port, Shenzhen PortAverage Response Time: ≤0.57h
About Our Factory & Business Background
AddressGuangzhou, Guangdong, China
Plant Area13800 square meters
Number of Employees144
Registered Capital111,090,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity100 Pcs
Supply Chain Partners100
Our Production Capability & Technical Expertise
Main ProductsPower Fittings (IPC, PG, clamps, lugs), shrink cable accessories, insulating covers, grounding devices, operating rods, spool insulators, hardware, and safety helmets.
Production Lines4
Production MachinesInjection Molding Machine, Milling Machine, Punching Machine, CNC Wire Cut Machine, Packaging Machine, Bending Machine, Welding Robotic Arm, Laser Cutting Machine, Forging Press, CNC Machine
QA/QC inspectors3 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers35 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2008-11-14
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001, ISO50001
Cooperated with Fortune 500Yes
Product Q&A
Q:Do your products comply with IEC or ANSI standards?
A:
All fittings are designed and tested to IEC 61284, GB/T 2314 and ANSI C119.4. Full type-test reports from CNAS accredited labs or third parties are available to meet global grid access standards.
Q:How to guarantee mechanical load safety under strong wind, ice and external impact?
A:
All hardware passes tensile failure, vibration resistance and ice coating load tests. Breaking load exceeds design standard by over 1.5 times to avoid line breakage and fitting falling under extreme weather.
Q:What quality inspection procedures do you implement before goods delivery?
A:
Three-level inspection covering raw material incoming test, semi-finished patrol inspection and finished product sampling. Electrical & mechanical data are archived, and batch inspection reports can be supplied with shipments.
Q:Can you supply a full set of overhead line fittings for the whole distribution line?
A:
Complete product range includes tension clamps, parallel groove connectors, insulation fittings, suspension clamps and protective hardware. One-stop supply streamlines procurement and shortens project delivery cycle.
Q:Can you handle large-scale utility bids, and how do you ensure quality consistency?
A:
Supported by a self-owned factory with 111 million RMB registered capital and integrated MES system, all components are fully traceable. Every batch gets full mechanical & electrical testing for consistent mass production quality.
Send Inquiry
*To:
Guangzhou Yongyibang Electronic Technology Co., Ltd.
Guangzhou Yongyibang Electronic Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Distribution Power Grid Helical Preformed Dead End Guy Grip Overhead Tension Fitting
US$12.50-18.50
100 Pieces(MOQ)
Distribution Overhead Line Preformed Helical Guy Grip Dead End Tension Hardware Fitting
US$12.50-18.50
100 Pieces(MOQ)
Helical Preformed Tension Clamp Fitting
US$0.10-2.10
100 pcs(MOQ)
Robust Aluminum Clad Power Fitting for Transmission Line Strength
US$12.50-18.50
100 Pieces(MOQ)
Preformed Helical Guy Grip for Distribution Power Grid Dead End Tension Fitting
US$12.50-18.50
100 Pieces(MOQ)
Overhead Pole Line Preformed Fittings for ADSS Preformed Dead End Guy Grip
US$1.00-4.50
200 Pieces(MOQ)
Hardware Preformed Dead End Tension Clamp as Overhead Line Fitting
US$0.50-2.80
1,000 Pieces(MOQ)
OEM Sand Casting Overhead Power Transmission Distribution Hardware Pole Line End Fittings
US$1.20
2,000 Pieces(MOQ)
PAL2000 ABC Cable Dead End Insulated Strain Clamp Tension Clamp Electric Power Fitting
US$2.76-2.85
50 Pieces(MOQ)
Nxjg Series Hot DIP Galvanized Steel Overhead Line Fittings Power Fitting for Transmission and Distribution
US$2.70-8.50
1,000 Pieces(MOQ)
Preformed Guy Grip Hardware Line Fitting
US$0.10-2.10
100 pcs(MOQ)
Hot DIP End Fitting Sidewalk Guy Power Line Fitting
US$4.50-5.50
100 Pieces(MOQ)
Nxj Type Aluminum Alloy Wedge Dead End Strain Clamp Electric Power Fitting
US$2.55-2.60
30 Pieces(MOQ)
Pole Line Hardware Steel Dead End Thimble Clevis Transmission Overhead Line Fittings
US$1.25-1.29
200 Pieces(MOQ)
Overhead Line Hot DIP Galvanized Stay Guy Wire Rope Cable Electric Power Fittings
US$1.00-4.00
1,000 Pieces(MOQ)
Hot DIP Galvanized Line Power Fittings for High-Voltage Overhead Power Distribution Projects
US$0.50-5.00
1,000 Sets(MOQ)
Hardware Preformed Dead End Tension Clamp as Overhead Line Fitting
US$0.20-3.00
1,000 Pieces(MOQ)
Mgf 45-250mm Substation Fitting Dead-End Caps (Damper type) Electric Power Fittings
US$19.90-39.90
1 Piece(MOQ)
Mgz 45-250mm Dead-End Caps (Damper type) Electric Power Fittings Substation Fitting
US$1.16-4.90
100 Pieces(MOQ)



















