Powered by Made-in-China.com

Low Failure Rate Excavator Reliable Quality to Avoid Construction Delay
US$23,800.00
2 Pieces
Product profile
Arm Length
3000mmBucket Capacity
0.8 cubic metersEngine Power
150 hpModel NO.
DX140Operating Weight
14 TonsTrack Shoe Width
400 mmYear of Manufacture
2024Excavation
Excavation, Loading, Site Leveling and Clearing.Road and Infrastructure Construction
Roadbed Excavation, Slope Shaping, Ditch Digging,Mines and Quarries
Ore Loading, Stockyard Cleaning, and Auxiliary WorMunicipal and Public Utilities
Municipal Pipeline Networks, Small Excavation PitsTransport Package
ContainerSpecification
Medium-sized hydraulic excavatorTrademark
DOOSANOrigin
South KoreaCompany profile
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Shanghai PortAverage Response Time: ≤3.68h CertifiedTerms of Payment: LC, T/T, D/P, etc.
AI-Powered supplier vetting
SummaryThe supplier is a limited company with a focus on providing excavator products, possessing capabilities in R&D and 3D design services. They offer a range of customization options but have limited financial data and a small team. With no established after-sales service procedure and no overseas presence, they do not collaborate with Fortune 500 companies and lack a strong financial record. However, they emphasize quality and service in their operations.
After-Sales capabilityThe supplier lacks written procedures or records for handling customer complaints, indicating a potential gap in after-sales service capability.
Financial creditThe supplier's financial data shows zero revenue, costs, and profits over the past two years, raising concerns about financial credibility.
R&D capabilityThe supplier has R&D capabilities with one R&D engineer, focusing on sample-based customization and 3D design services.
Production capacityThe supplier has limited production capacity with no in-stock service, overseas warehouse, or showroom capabilities.
Customization capabilityThe supplier offers extensive customization services, including full and minor customization, which is a strong aspect of their service offerings.
Client casesThe supplier does not collaborate with any Fortune 500 companies, indicating limited high-profile customer engagements.
Send Inquiry
*To:
Hefei Liangzhu Construction Machinery Co., Ltd.
Hefei Liangzhu Construction Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Low Failure Rate Crawler Used Heavy Excavator for Construction Site
US$22,000.00-26,000.00
1 Piece(MOQ)
Low Failure Rate Excavators Ensure Continuous Construction Progress
US$28,000.00
1 Piece(MOQ)
Used Excavator Low Failure Rate Construction Digger for Stone Quarry Pit Excavation Operations
US$28,000.00-30,000.00
1 Piece(MOQ)
Shipment-Ready Used Excavator to Avoid Delay of Your Construction Timeline
US$19,000.00-43,900.00
1 Piece(MOQ)
Well Maintained Caterpillar 329d2 Used Construction Excavator Fuel Saving Low Failure Rate
US$23,600.00-26,800.00
1 Piece(MOQ)
Komatsu PC 300 Excavator and Mature Reliable Design, Low Failure Rate
US$31,000.00-33,000.00
1 Piece(MOQ)
Heavy Duty Cat 320c Crawler Excavator, Fuel Saving Design Low Failure Rate for Road Construction
US$17,000.00-19,500.00
1 Piece(MOQ)
Used PC220 Hydraulic Digger Excavators Low Failure Rate Popular Japanese Brand Second Hand Construction Equipment
US$14,000.00-16,000.00
1 Piece(MOQ)
The Se150 Excavator Has a Low Failure Rate Due to Its Intelligent Electronic Control System.
US$19,000.00-20,000.00
1 Piece(MOQ)
Used Hx205g Hydraulic Excavator Low Failure Rate Medium Construction Machinery for Engineering Projects
US$15,000.00-16,000.00
1 Piece(MOQ)
Apan Brand Hitachi Zx60 Compact Hydraulic Excavator Stable Performance Low Failure Rate
US$20,500.00-21,000.00
1 Piece(MOQ)
Low Failure Rate Used Excavator Hydraulic Digger for Long Term Construction Site Service
US$25,000.00
1 Piece(MOQ)
23.5 Ton Used Sy215h Hydraulic Crawler Excavator Reliable Quality Excavator in Stock
US$27,000.00-28,000.00
1 Piece(MOQ)
Second Hand Sy75c 7.5 Ton Excavator Low Failure Rate Machinery for Urban and Suburban Construction
US$16,000.00-18,000.00
1 Piece(MOQ)
Quality Certified Used Excavator for Reliable Construction Operations
US$240,000.00-260,000.00
1 Piece(MOQ)
Low Hour Cat 320 Crawler Excavator for Sale - Quality Construction Machinery
US$46,000.00-48,000.00
1 Piece(MOQ)
Smooth Arm Movement Low Failure Rate Small Crawler Cat 305.5e2 Used Excavator
US$13,800.00
1 Piece(MOQ)
Second Hand Sy135c Excavator Low Failure Rate Cost Efficient Medium Size Earthmoving Machinery
US$15,000.00-18,000.00
1 Piece(MOQ)
Factory Direct Used Cat 325cl Excavator Reliable Quality Fast Shipping to Worldwide Customers
US$19,800.00-24,900.00
1 Piece(MOQ)



















