SourcingAI
Try for free
Powered by Made-in-China.com
GU10 Lamp Holder Light Socket with Long Leads and Connector
US$0.40
500-9,999 Pieces
US$0.35
10,000-49,999 Pieces
US$0.30
50,000+ Pieces
Sample price:US$0.60/piece.Request sample

Product profile

Material

Porcelain

Bulb Holder

GU10

Interface Style

Bayonet Base

Model NO.

GU10. A1013

Type

GU10 Assembly

Certification

CE, VDE, RoHS, CQC, IEC, ENEC

Voltage

250V

Rated Current

2A

GU10 Series

GU10 Lamp Socket Wiring Kit

Light Source

GU10 Lamps,GU10 LED Bulbs

Application

LED Down Lights,LED Ceiling Lamps,LED Spotlights

Transport Package

1000

Specification

Halogen

Trademark

Linkedlight

Origin

China

HS Code

8536610000

Production Capacity

5000000/Year

Key features

High Voltage Resistance: Insulating sleeving withstands up to 1500V for enhanced electrical safety.
Durable Material Construction: Ceramic body, brass contacts, and fiberglass sleeving ensure long-lasting performance.
Flexible Customization: Customized samples available in 3-5 days with OEM and ODM services welcomed.
Fast Sample Delivery: Regular samples sent within 24 hours; customized samples in 3-5 days.
Versatile Application: Suitable for LED down lights, ceiling lights, track lights, and magnetic lights.
Multiple Payment Options: Supports LC, T/T, PayPal, Western Union, and small-amount payments.
Global Shipping Network: Air and sea transport available via FedEx, DHL, TNT, UPS from Guangzhou/Shenzhen.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2018-06-12 CertifiedNearest Port: Zhongshan Port, Shenzhen PortAverage Response Time: ≤24h CertifiedTerms of Payment: LC, T/T, PayPal, etc.

About Our Factory & Business Background

AddressNo 25, Meili Road, Meiliwei Industrial Area, Guzhen, 528421, Zhongshan, Guangdong, China
Plant Area7200 square meters
Number of Employees55
Registered Capital3,000,000 RMB
International Commercial Terms(Incoterms)FOB, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsCable & Wire Products, Lamp Cable Assemblies, Lamp Suspensions, Lighting Accessories, GU10 LED Light Connectors, GU10 Lamp Wiring Kit, LED Light Connectors, Connectors with Cable Assemblies
Production MachinesCable & Wire Extrusion Machine, Injection Molding Machine, Cutting Machine, Inserting Machine, Stamping Machine, Automatic Terminal Machine, Terminal Machine, Automatic Binding Machine, Integrated Tester for Power Plug, Automatic Switch Machine, Electric Blast Drying Oven, Precision Cable Tester, Withstand Voltage Tester, DC Power Supply, DC Electronic Load, Digital Power Meter
R&D Engineers4 people
Test Reports for Raw MaterialsReach
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2018-08-12
Main MarketsNorth America, South America, Europe
Annual Export Revenue18,000,000 RMB
Number of Foreign Trading Staff7
Overseas Agent/BranchNo

Product Q&A

Q:Can I get a customized sample?
A:
Yes, customized samples are available and will be sent within 3-5 days.
Q:What is the lead time for samples?
A:
Regular samples are sent in 24 hours, while customized samples take 3-5 days.
Q:What are the payment terms?
A:
We accept LC, T/T, PayPal, Western Union, and small-amount payments.
Q:Do you offer OEM and ODM services?
A:
Yes, OEM and ODM services are welcomed, and we can make molds based on drawings or samples.
Q:What is the voltage resistance of the insulating sleeving?
A:
The insulating sleeving has a voltage resistance of 1500V.

Send Inquiry

*To:Zhongshan Linkedlight Lighting Technology CO.,LTDZhongshan Linkedlight Lighting Technology CO.,LTD
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Lamp Bulb Connector G10q Light Socket with High Quality
Made-in-China.com
Hoe Selling 250V T8 Lamp Holder Socket G13 Connector
Made-in-China.com
Double-End 2pin Lamp Connector T8 Lamp Holder Socket
Made-in-China.com
Halogen GU10 Lamp Holder Socket with Connector Block
Made-in-China.com