SourcingAI
Try for free
Powered by Made-in-China.com
450t Cold Chamber Die Casting Machine Full Set Equipment From Nancy Du
US$68,900.00
1 Piece

Product specifications

color

Product profile

After-sales Service

1 Year

Warranty

1 Year

Type

Cold Chamber Die Casting Machine

Model NO.

HY450-2

Structure

Horizontal

Die Locking Force

≥4500kN

Space Between Tie-Bars

660×660mm

Tie Bar Diameter

φ130mm

Locking Stroke

≥550mm

Die Thickness

300-700mm

Ejection Stroke

≥120

Transport Package

Wooden

Specification

7300×1800×3200

Origin

China

Production Capacity

10

Key features

Wide Die Thickness Range: Accommodates die thickness from 300 mm to 750 mm.
Premium Component Brands: Equipped with Yuken pumps, Omron PLCs, and GF sealing systems.
Efficient Dry Cycle: Achieves a dry cycle time of 12 seconds for high productivity.
Comprehensive Warranty: Includes 1-year warranty covering mechanical defects and parts.
High Power Motor: Powered by a 22 KW motor for consistent performance.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2024-06-04Nearest Port: Tianjin, DalianAverage Response Time: ≤9.43hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF

About Our Factory & Business Background

AddressAnshan, Liaoning, China
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsFurnace, Mechanical Production Line, General Contracting Project, Production Line, Induction Furnace, Continuous Casting and Rolling, Machinery

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period for this machine?
A:
We provide a 1-year warranty for all mechanical defects.
Q:What is the dry cycle time?
A:
The dry cycle time is 12 seconds.
Q:What brands are used for key components?
A:
Key components include Yuken pumps, Omron PLCs, and GF sealing systems.
Q:What is the lead time for production?
A:
Lead time is 1-3 months in the off-season and 3-6 months during peak season.
Q:What payment methods are accepted?
A:
We accept LC, T/T, PayPal, and Western Union.

Send Inquiry

*To:Liaoning Rongjun Machinery Import and Export Co, . LtdLiaoning Rongjun Machinery Import and Export Co, . Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Reliable Pressurization Equipment for Die Casting Machine
Made-in-China.com
Premium Casting Film Equipment for Fast Global Shipping
Made-in-China.com