SourcingAI
Try for free
Powered by Made-in-China.com
Double-Win Automatic Semi Automatic Powder Coating Production Line on Sale
US$10,000.00-56,000.00
1 Set

Product profile

Customization

Available

Application Method

Electrostatic Spray

Coating Material

Acrylic, Epoxy, Hybrid, Polyester, Polyurethane

Model NO.

DW-5775

Voltage

110V, 220V, 380V, 440V

Warranty

Video and Oversea Service Agent

Heating System

Diesel, Electric, Gas, LPG

Powder Coating

Quick Color Change Cyclone

Control Mode

Siemens PLC+Touch Screen

Advantage

High Efficiency Low Cost

Color

Multi Color

Powder Recovery

99.5%

Dimension(L*W*H)

Customized Size

Method Type

Automatic

Maintenance

Easy, Lower Cost

Booth

PP Board or PVC Board

Liquid Tank

PP/SUS304/SUS316

Oven Material

100-200mm Rock Wool Panel

After-Sales Service Provided

Engineers Available to Service Machinery Overseas

Powder Recovery Time

10-15 Mins

Oven Temperature

Consistent and Stable

Transport Package

Sea Freight

Specification

Customization

Trademark

Double-win

Origin

Weifang

HS Code

8424899990

Production Capacity

150 Sets/Year

Key features

Customized Dimensions: Length 100-15000mm, Width 100-3000mm, Height 100-3500mm fully customizable.
Multi-Energy Heating: Oven supports electricity, natural gas, LPG, diesel, coal, and wood pellets.
High Powder Recovery: Achieves 99.5% powder recovery rate with quick color change cyclone system.
Flexible Conveyor Options: Supports light-duty, Power and Free, and heavy-duty conveyors up to 15000KG.
Siemens PLC Control: Advanced control mode featuring Siemens PLC and Touch Screen interface.
Overseas Technical Support: Engineers available to provide on-site service for machinery overseas.
OEM & ODM Services: Offers full, minor, and flexible customization from samples or designs.
Stable Oven Temperature: Ensures consistent and stable heating with 100-200mm Rock Wool Panel insulation.

Company profile

Linqu Double Win Coating Machinery and Equipment Factory
Importers and ExportersSelf-brandedLow MOQOverseas Services
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 years CertifiedNearest Port: Qingdao Port CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressNo. 2177 Donghong Road, Xinzhai Street, Weifang, Shandong, China
Plant Area10749 square meters
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 set
Supply Chain Partners60

Our Production Capability & Technical Expertise

Main ProductsPowder Coating Equipment, Electrophoretic Coating Line, Paint Spraying Line, Liquid Coating Production Line, Aluminum Profile Surface Treatment Equipment, Wood Grain Transfer Machine, Accumulating Conveyor, Large Cyclone Powder System, Painting Line, Manual Powder Coating Plant
Production Lines1
Production MachinesBending Machine, Engraving Machine, Laser Cutting Machine, Shearing Machine
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers2 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2013-04-08
Main MarketsSoutheast Asia/ Mideast, Domestic, Central Asia
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Product Q&A

Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 set.
Q:What are the available heating energy options for the oven?
A:
The oven supports electricity, natural gas, liquefied petroleum gas, diesel, coal, and wood pellets.
Q:Can the product dimensions be customized?
A:
Yes, the length ranges from 100-15000mm, width from 100-3000mm, and height from 100-3500mm.
Q:What is the lead time for production?
A:
The average lead time is 1-3 months for both peak and off-peak seasons.
Q:Do you offer overseas after-sales service?
A:
Yes, engineers are available to service machinery overseas.

Send Inquiry

*To:Linqu Double Win Coating Machinery and Equipment FactoryLinqu Double Win Coating Machinery and Equipment Factory
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Industrial Metal Parts Automatic Powder Coating Production Line
Made-in-China.com