Powered by Made-in-China.com
Long-Lead Cartridge Heating Element for Oil Heating with Lu-Chiuan Approved
US$2.60-13.80
20 Pieces
Sample price:US$15.00/piece.Request sample
Product profile
Customization
AvailableCertification
RoHS, CB, CCC, ISO9001, CE, ULType
Threaded Immersion Cartridge HeatersModel NO.
CH-22Material
Ni-Cr WireForm
Threaded Single-End TubularShape
TubularSheath Material
SUS304 / SUS316L / Incoloy 800Thread Material
BrassInsulation Material
Magnesium OxideLead Wire Material
High Temp Fiberglass Braided WireTransport Package
Carton Box and WoodenSpecification
Diameter 3-30mm, Length 20-2000mm, Voltage 12-380VTrademark
Lu-chiuanOrigin
ChinaHS Code
85168000Production Capacity
50000PCS/MonthKey features
Fully Customizable Design: Dimensions, voltage, and power can be customized per drawings and samples.
Premium Material Options: Available in SUS304, SUS316L, and Incoloy 800 for various environments.
Wide Voltage Range: Supports 12V to 380V, including 110V, 220V, and 240V options.
Comprehensive Certifications: Holds CE, UL, TUV, ISO9001, RoHS, CB, and CCC certifications.
High Power Capacity: Power output ranges from 10W to 5000W on demand.
Diverse Thread Specifications: Offers M6/M8/M10/M12 threads with both metric and inch options.
OEM & ODM Services: Provides full customization from samples with professional R&D support.
Fast Production Lead Time: Off-season delivery within 15 workdays; peak season in one month.
Company profile
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples CertifiedNearest Port: Shenzhen PortAverage Response Time: ≤0.67h
About Our Factory & Business Background
AddressDongguan, Guangdong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Supply Chain Partners10
Our Production Capability & Technical Expertise
Main ProductsElectric Heater Element, Heating Element, Cartridge Element, Immersion Heater, Cartridge Heater, Electric Heating Element, Electric Heater Tube, Heater Tube, Electric Heater, Water Heater
Production Lines4
QA/QC inspectors4 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers4 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
Product Q&A
Q:What materials are available for the sheath?
A:
We offer SUS304, SUS316L, and Incoloy 800 to suit different corrosion and temperature requirements.
Q:Can the product dimensions be customized?
A:
Yes, the diameter (3-30mm) and length (20-2000mm) are fully customizable based on your drawings.
Q:What is the voltage range for these heaters?
A:
The heaters support a wide voltage range from 12V to 380V, including standard options like 110V and 220V.
Q:Do you offer OEM and ODM services?
A:
Yes, we provide complete OEM and ODM solutions, including customization from samples and R&D support.
Q:What certifications does the product have?
A:
Our products are certified with CE, UL, TUV, ISO9001, RoHS, CB, and CCC to meet global standards.
Send Inquiry
*To:
Dongguan Lu Chiuan Heating Elements Ind. Co., Ltd.
Dongguan Lu Chiuan Heating Elements Ind. Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Flange Immersion Heating Element for Water Boilers with Lu-Chiuan CE ISO9001
US$2.50-15.00
20 Pieces(MOQ)
Screw Thread U Heating Element for Water Boiler with Lu-Chiuan CE Patent
US$10.00-15.00
20 Pieces(MOQ)
Stainless Steel Cartridge Element for Embedded Mold with Lq CE Approved
US$1.50-15.00
20 Pieces(MOQ)
Coil Oven Element for Cookers with Lu-Chiuan Patent
US$5.50-11.80
25 Pieces(MOQ)
Long Service Life CE Approved Mosquito Coil Heating Element for Electric Oven
US$1.01-1.20
500 Pieces(MOQ)
220V 100W Cartridge Heater Stainless Steel Heating Element for Oil
US$2.00-6.00
50 Pieces(MOQ)
Customized Silicone Heating Element 220V Silicone Rubber Heating Pad with Thermostat for Oil Drum Heating
US$16.00-55.00
5 Pieces(MOQ)
Smooth Heating Element with Steel Wire for Long-Lasting Home Use
US$9.00-120.00
10 Pieces(MOQ)
Red Silicone Ribbon Heating Element with Lead Wire for Industrial Equipment Surface Constant Heating
US$2.50-4.50
50 Pieces(MOQ)
Right Angle Cartridge Heating Element with Metal Hose Lead
US$3.00-10.00
5 Pieces(MOQ)
Durability Versatile Long Lasting Metal Heating Element with Heating Wire for Whole House
US$6.00-14.00
100 Pieces(MOQ)
Immersion Heating Element with M12 Flange for Oil Preheating, Flange Incoloy Heater Element
US$0.50-38.00
100 Pieces(MOQ)














