Powered by Made-in-China.com
2024 Minor, Low-Energy Consumption, Smokeless Industry Solid Waste Incinerator
US$11,800.00
1-9 Sets
US$9,888.00
10+ Sets
Product profile
Customization
AvailableAfter-sales Service
Lifetime Technical ServiceWarranty
1yearModel NO.
LDF20LDF30 LDF50 LDF100Condition
NewCertification
ISO, CEAutomation
Semi-AutomaticScrew
Multi-ScrewTreatment
BurningNumber of Combustion Chambers
3Temperature Resistance
1700Manufacturing Experience
20 YearsFuel
Oil GasColor
Customers′ RequirementsSize
Customized SizCapacity
20-500kgs/BatchTransport Package
Plastic Wrap or Wooden BoxSpecification
1800mm*1300*3000mmTrademark
LvDuOrigin
China DezhouHS Code
8417809090Production Capacity
500 Sets/YearKey features
Advanced Venturi Dust Removal: Equipped with Venturi spray system, Paar ring packing tower, and cyclone for high purification.
Dual Fuel Options: Supports both fuel oil and fuel gas burning methods for flexible operation.
Durable Construction: Uses thick, hard steel plate with strong corrosion resistance and Italian Baltur burner.
Wide Application Scope: Ideal for medical waste, domestic garbage, industrial waste, and animal corpse treatment.
Certified Quality: Complies with ISO9001:2000 and holds CE certification for safe export.
Lifetime Technical Support: Provides lifetime technical service and warranty for long-term reliability.
Customizable Specifications: Offers customized size, color, and combustion chamber configurations per customer needs.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2013-05-29Nearest Port: QingdaoAverage Response Time: ≤3.24hTerms of Payment: T/TInternational Commercial Terms(Incoterms): FOB
AI-Powered supplier vetting
SummaryShandong Lvdu Environmental Equipment Co., Ltd. is a China-based limited company in Shandong, identified as both a trading company and manufacturer/factory. It operates in environmental protection equipment, including incinerators and sewage treatment equipment. The supplier reports eight production lines, stated output of 10 compression equipment sets, 60 sewage treatment equipment sets, and 500 incinerator sets, with off-peak lead time within 15 working days. Its markets include South America, the Middle East, Southeast Asia, and Africa. ISO 9001:2000 and CE certification are stated, while the available SGS audit record expired on November 16, 2024, and its evaluation result is recorded as 0. R&D, OEM/ODM, overseas services, inventory, ERP, and customization capabilities are not established by the provided data. No customer cases are supplied.
Supplier typeThe supplier is identified as a limited company operating as both a trading company and manufacturer/factory. Its stated business focuses on manufacturing, engineering, sales, and maintenance of environmental protection equipment.
CertificationsThe company description states compliance with ISO 9001:2000 and CE certification for export. An SGS audit is also recorded, but the report expired on November 16, 2024, and the audit evaluation result is listed as 0; therefore, only the stated ISO and CE certifications provide positive evidence.
After-Sales capabilityThe company description states that the business includes product maintenance, and it describes environmental engineering construction and operation services. However, inventory service, overseas warehouses, showrooms, and overseas agents or branches are all marked unknown, so the broader after-sales network is not established.
R&D capabilityThe company describes itself as engaged in environmental protection technology development, process development, and high-tech R&D innovation. However, ODM, SDK, private-mold, 3D design, new-product R&D, digitalization, ERP integration, and AI-related capabilities are marked unknown, so the scope and maturity of innovation capability cannot be fully verified.
Production capacityThe supplier reports eight production lines and stated production of 10 compression equipment sets, 60 sewage treatment equipment sets, and 500 incinerator sets. It also reports an off-peak lead time within 15 working days and is described as a manufacturer/factory, providing explicit evidence of operating production capacity.
Product Q&A
Q:What is the incineration capacity?
A:
The LDF-100 model has a capacity of 80-100kg per batch, allowing for 3-6 burns per day.
Q:What fuels can be used?
A:
The incinerator supports two burning methods: fuel oil and fuel gas, allowing users to choose based on needs.
Q:What is the warranty period?
A:
We provide a 1-year warranty and lifetime technical service for all our equipment.
Q:Is customization available?
A:
Yes, customization is available for size, color, and the number of combustion chambers.
Q:What are the lead times for production?
A:
Peak season lead time is one month, while off-season lead time is within 15 workdays.
Send Inquiry
*To:
Shandong Lvdu Environmental Equipment Co., Ltd
Shandong Lvdu Environmental Equipment Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
2024 Minor, Low-Energy Consumption, Smokeless Industry Solid Waste Incinerator
US$5,000.00
1 sets(MOQ)
Continuous Municipal Waste Incinerator with Easy Maintenance and Low Energy Consumption
US$5,999.00-22,999.00
1 Piece(MOQ)
2024 New Smokeless and Environmentally Friendly Industry Solid Waste Incinerator
US$3,800.00
1 Set(MOQ)
Low Energy Consumption Medical Waste Incinerator for Eco-Conscious Facilities
US$5,999.00-16,999.00
1 Piece(MOQ)
Eco Friendly Smokeless Solid Waste Incinerator for Low Emission Waste Disposal System
US$3,000.00-5,000.00
1 Set(MOQ)
Smokeless Odorless Highly-Efficient Energy-Saving Solid Waste Incinerator for Municipal Waste Management Projects
US$3,000.00-5,000.00
1 Set(MOQ)
New 2024 Smokeless and Tasteless Solid Waste New Hospital Incinerator Waste Incinerators
US$5,000.00-50,000.00
1 Piece(MOQ)
Energy-Saving Portable/Smokeless 100-150kg Medical Waste Incinerator for Hospital Clinical Solid Waste Disposal
US$3,000.00-5,000.00
1 Set(MOQ)
Low Energy Consumption Factory Price Medical Waste Incinerator
US$4,600.00-4,800.00
1 Set(MOQ)
Low Energy Consumption Clinical Medical Waste Incinerator
US$4,600.00-4,800.00
1 Set(MOQ)
2024 Smokeless Waste Treatment, Animal, Hospital Solid Waste Incinerator
US$6,600.00
1 sets(MOQ)
Low Emission High Heat Sturdy Frame Solid Waste Incinerator for Clean Energy
US$100,000.00-2,000,000.00
1 Piece(MOQ)
Municipal Waste to Energy Tire Smokeless Garden Incinerator Waste Recycling Machines
US$5,000.00-15,000.00
1 Set(MOQ)
Smokeless Hospital Medical/Hotel Industrial General Garbage Burning Incineration Solid Waste Incinerator
US$5,000.00-15,000.00
1 Set(MOQ)
Huariton Smokeless Medical Waste Incinerator for Hospital Clinical Solid Garbage Treatment
US$4,600.00-4,800.00
1 Set(MOQ)
Smokeless Hospital Medical Waste Incinerator Animal Carcass/Pet/Solid Waste Incineration
US$5,000.00-15,000.00
1 Set(MOQ)



















